John Bangs Reconstruction

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The John Bangs Reconstruction project at Ontario International Airport involves the full-depth reconstruction of the main drive lanes, milling and overlay of the center left-turn lane, and installation of pedestrian safety enhancements and traffic calming measures to address pavement deterioration and reduce vehicle speeds. All work will be conducted within the existing roadway footprint to minimize environmental impact, with no expansion of capacity or operational changes. The project is scheduled to begin in Q3 2026 and will last approximately four months, with construction activities confined to airport property and designed to avoid disruption to aircraft or passenger operations. Environmental compliance has been achieved through categorical exemptions under CEQA Sections 15301 and 15302, reflecting the project's nature as a replacement and rehabilitation of existing infrastructure without significant environmental effects. Best Management Practices will be implemented throughout construction to manage erosion, sediment, and safety compliance. The Ontario International Airport Authority is the lead agency, responsible for both project oversight and delivery, with no formal federal contracting clauses, solicitation number, or competitive bidding process identified in the documentation. There is no published contract value, pricing structure, or formal evaluation methodology outlined, and no designated contracting officer, COR, or COTR has been assigned. Materials will be sourced locally, with demolition debris to be recycled or disposed of per regulatory requirements, and final acceptance of work will occur on-site. Permanent markings such as signage, striping, and pedestrian crosswalk enhancements are part of the deliverables, though no specific military or federal standards for packaging, marking, or inspection are referenced beyond adherence to state and local regulations and the 2025 Pavement Management Plan. All inquiries should be directed to Heba Shanaa, Sr. Environmental Planner, at the Ontario International Airport Authority in Ontario, California.

General Info

John Bangs Reconstruction at Ontario International Airport begins Q3 2026, rehabilitating roadways with pedestrian safety upgrades, no capacity expansion, local materials, and no federal contracting.

Agency

California → Ontario International Airport Authority

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Ontario, CA

Set-Aside

NONE

Documents

(3)

John Bangs Reconstruction CEQA Notice of Exemption

PDFnotice-of-exemption

Attachment 1 - John Bangs Reconstruction Project CEQA CatEx Explanation

PDFcategorical-exemption-explanation

Attachment 2 - Exhibit 1 - John Bangs Reconstruction Project Area

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Ontario International Airport Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California → Ontario International Airport Authority
Office AddressN/A
Contacts
Heba ShanaaSr. Environmental Planner

Full Description

Show more
The Proposed Project would involve the demolition and full-depth reconstruction of the main drive lanes of John Bangs Drive, milling and overlay of the center left-turn lane, and installation of safety treatments to improve pedestrian safety and reduce vehicle speeds. All work would occur within the existing, previously disturbed roadway footprint at ONT, addressing pavement deterioration and safety concerns identified in recent studies. Best management practices would be implemented to minimize disruption and ensure regulatory compliance.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 19 hours ago

DEADLINE

in 24 days
View Details