Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Washington was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Johnson Property Remediation, City of Stanwood, WA

Closed
BXWA-2026-001382State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Washington → City of StanwoodView Agency

NAICS

N/A

Place of Performance

Stanwood, WA, 98292, USA

Set-Aside

NONE

Documents

(183)

Engineering Design Subsurface Assessment - Page 59.jpg

JPG

Engineering Design Subsurface Assessment - Page 48.jpg

JPG

Engineering Design Subsurface Assessment - Page 4.jpg

JPG

Specs - Page 11.jpg

JPG

Specs - Page 63.jpg

JPG

Engineering Design Subsurface Assessment - Page 3.jpg

JPG

Engineering Design Subsurface Assessment - Page 17.jpg

JPG

Specs - Page 92.jpg

JPG

Specs - Page 41.jpg

JPG

Engineering Design Subsurface Assessment - Page 30.jpg

JPG

Addendum #1 - Page 9.jpg

JPG

Specs - Page 21.jpg

JPG

Engineering Design Subsurface Assessment - Page 31.jpg

JPG

Specs - Page 77.jpg

JPG

Specs - Page 60.jpg

JPG

Specs - Page 19.jpg

JPG

Specs - Page 10.jpg

JPG

Specs - Page 1.jpg

JPG

Specs - Page 67.jpg

JPG

Plans - Page 6.jpg

JPG

Engineering Design Subsurface Assessment - Page 52.jpg

JPG

Engineering Design Subsurface Assessment - Page 29.jpg

JPG

Engineering Design Subsurface Assessment - Page 34.jpg

JPG

Specs - Page 18.jpg

JPG

Specs - Page 81.jpg

JPG

Specs - Page 74.jpg

JPG

Addendum #1 - Page 10.jpg

JPG

Specs - Page 93.jpg

JPG

Specs - Page 42.jpg

JPG

Engineering Design Subsurface Assessment - Page 26.jpg

JPG

Specs - Page 8.jpg

JPG

Specs - Page 66.jpg

JPG

Engineering Design Subsurface Assessment - Page 9.jpg

JPG

Engineering Design Subsurface Assessment - Page 43.jpg

JPG

Engineering Design Subsurface Assessment - Page 10.jpg

JPG

Specs - Page 80.jpg

JPG

Specs - Page 65.jpg

JPG

Plans - Page 3.jpg

JPG

Specs - Page 53.jpg

JPG

Engineering Design Subsurface Assessment - Page 62.jpg

JPG

Engineering Design Subsurface Assessment - Page 5.jpg

JPG

Addendum #1 - Page 1.jpg

JPG

Specs - Page 52.jpg

JPG

Engineering Design Subsurface Assessment - Page 39.jpg

JPG

Engineering Design Subsurface Assessment - Page 32.jpg

JPG

Engineering Design Subsurface Assessment - Page 35.jpg

JPG

Specs - Page 22.jpg

JPG

Engineering Design Subsurface Assessment - Page 46.jpg

JPG

Specs - Page 23.jpg

JPG

Addendum #1 - Page 7.jpg

JPG

Specs - Page 44.jpg

JPG

Engineering Design Subsurface Assessment - Page 24.jpg

JPG

Specs - Page 97.jpg

JPG

Specs - Page 45.jpg

JPG

Engineering Design Subsurface Assessment - Page 47.jpg

JPG

Engineering Design Subsurface Assessment - Page 11.jpg

JPG

Specs - Page 34.jpg

JPG

Engineering Design Subsurface Assessment - Page 42.jpg

JPG

Specs - Page 43.jpg

JPG

Specs - Page 38.jpg

JPG

Engineering Design Subsurface Assessment - Page 45.jpg

JPG

Specs - Page 83.jpg

JPG

Specs - Page 75.jpg

JPG

Plans - Page 2.jpg

JPG

Engineering Design Subsurface Assessment - Page 49.jpg

JPG

Specs - Page 84.jpg

JPG

Specs - Page 46.jpg

JPG

Specs - Page 48.jpg

JPG

Specs - Page 69.jpg

JPG

Plans - Page 5.jpg

JPG

Specs - Page 64.jpg

JPG

Specs - Page 54.jpg

JPG

Addendum #1 - Page 2.jpg

JPG

Engineering Design Subsurface Assessment - Page 44.jpg

JPG

Engineering Design Subsurface Assessment - Page 51.jpg

JPG

Specs - Page 94.jpg

JPG

Specs - Page 78.jpg

JPG

Engineering Design Subsurface Assessment - Page 50.jpg

JPG

Specs - Page 76.jpg

JPG

Addendum #1 - Page 16.jpg

JPG

Bid Tabulation - Page 1.jpg

JPG

Specs - Page 90.jpg

JPG

Engineering Design Subsurface Assessment - Page 38.jpg

JPG

Specs - Page 62.jpg

JPG

Addendum #1 - Page 3.jpg

JPG

Specs - Page 37.jpg

JPG

Specs - Page 28.jpg

JPG

Specs - Page 14.jpg

JPG

Addendum #1 - Page 6.jpg

JPG

Engineering Design Subsurface Assessment - Page 23.jpg

JPG

Specs - Page 59.jpg

JPG

Engineering Design Subsurface Assessment - Page 19.jpg

JPG

Specs - Page 72.jpg

JPG

Engineering Design Subsurface Assessment - Page 8.jpg

JPG

Specs - Page 87.jpg

JPG

Specs - Page 20.jpg

JPG

Specs - Page 68.jpg

JPG

Addendum #1 - Page 4.jpg

JPG

Engineering Design Subsurface Assessment - Page 36.jpg

JPG

Engineering Design Subsurface Assessment - Page 21.jpg

JPG

Specs - Page 88.jpg

JPG

Specs - Page 26.jpg

JPG

Specs - Page 2.jpg

JPG

Specs - Page 7.jpg

JPG

Engineering Design Subsurface Assessment - Page 18.jpg

JPG

Specs - Page 4.jpg

JPG

Engineering Design Subsurface Assessment - Page 6.jpg

JPG

Engineering Design Subsurface Assessment - Page 16.jpg

JPG

Specs - Page 15.jpg

JPG

Engineering Design Subsurface Assessment - Page 14.jpg

JPG

Specs - Page 31.jpg

JPG

Engineering Design Subsurface Assessment - Page 58.jpg

JPG

Plans - Page 1.jpg

JPG

Addendum #1 - Page 15.jpg

JPG

Specs - Page 17.jpg

JPG

Addendum #1 - Page 13.jpg

JPG

Engineering Design Subsurface Assessment - Page 12.jpg

JPG

Specs - Page 36.jpg

JPG

Specs - Page 16.jpg

JPG

Addendum #1 - Page 17.jpg

JPG

Specs - Page 71.jpg

JPG

Specs - Page 58.jpg

JPG

Specs - Page 3.jpg

JPG

Specs - Page 50.jpg

JPG

Specs - Page 5.jpg

JPG

Specs - Page 55.jpg

JPG

Engineering Design Subsurface Assessment - Page 33.jpg

JPG

Engineering Design Subsurface Assessment - Page 53.jpg

JPG

Specs - Page 49.jpg

JPG

Addendum #1 - Page 11.jpg

JPG

Engineering Design Subsurface Assessment - Page 37.jpg

JPG

Addendum #1 - Page 14.jpg

JPG

Plans - Page 4.jpg

JPG

Specs - Page 51.jpg

JPG

Specs - Page 32.jpg

JPG

Engineering Design Subsurface Assessment - Page 15.jpg

JPG

Specs - Page 29.jpg

JPG

Engineering Design Subsurface Assessment - Page 61.jpg

JPG

Engineering Design Subsurface Assessment - Page 13.jpg

JPG

Specs - Page 96.jpg

JPG

Specs - Page 70.jpg

JPG

Engineering Design Subsurface Assessment - Page 28.jpg

JPG

Specs - Page 6.jpg

JPG

Specs - Page 61.jpg

JPG

Specs - Page 82.jpg

JPG

Specs - Page 35.jpg

JPG

Specs - Page 56.jpg

JPG

Engineering Design Subsurface Assessment - Page 41.jpg

JPG

Specs - Page 86.jpg

JPG

Specs - Page 27.jpg

JPG

Engineering Design Subsurface Assessment - Page 56.jpg

JPG

Specs - Page 91.jpg

JPG

Specs - Page 47.jpg

JPG

Specs - Page 73.jpg

JPG

Specs - Page 89.jpg

JPG

Engineering Design Subsurface Assessment - Page 20.jpg

JPG

Addendum #1 - Page 12.jpg

JPG

Engineering Design Subsurface Assessment - Page 1.jpg

JPG

Specs - Page 85.jpg

JPG

Engineering Design Subsurface Assessment - Page 7.jpg

JPG

Specs - Page 30.jpg

JPG

Engineering Design Subsurface Assessment - Page 57.jpg

JPG

Engineering Design Subsurface Assessment - Page 25.jpg

JPG

Engineering Design Subsurface Assessment - Page 22.jpg

JPG

Specs - Page 57.jpg

JPG

Addendum #1 - Page 5.jpg

JPG

Engineering Design Subsurface Assessment - Page 2.jpg

JPG

Specs - Page 25.jpg

JPG

Specs - Page 40.jpg

JPG

Specs - Page 12.jpg

JPG

Specs - Page 24.jpg

JPG

Specs - Page 13.jpg

JPG

Engineering Design Subsurface Assessment - Page 27.jpg

JPG

Specs - Page 9.jpg

JPG

Specs - Page 79.jpg

JPG

Specs - Page 95.jpg

JPG

Specs - Page 33.jpg

JPG

Engineering Design Subsurface Assessment - Page 60.jpg

JPG

Engineering Design Subsurface Assessment - Page 54.jpg

JPG

Engineering Design Subsurface Assessment - Page 55.jpg

JPG

Specs - Page 39.jpg

JPG

Engineering Design Subsurface Assessment - Page 40.jpg

JPG

Addendum #1 - Page 8.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Stanwood
Contacts1 person available
OfficeN/A
Organization / Agency
Washington → City of Stanwood
View Agency Profile
Office AddressN/A
Contacts

Interested Companies (11)

Show more
FL Construction
Mt. Vernon, WA
Northwest Barricade
Everett, WA
Pacific Surveying and Engineering
Bellingham, WA

See All 11 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for mobilization to the site; site preparation; excavation and disposal or recycling of soils contaminated with petroleum; excavation, removal, and disposal of a 300 gallon abandoned underground storage tank (UST); excavation, removal, and disposal of septic tank and attached lines within the excavation zone of the UST; excavation of overburden soils from areas of contaminated groundwater and stockpile for later use; as needed dewatering and treatment of water from excavation locations to improve excavation stability; mixing of bioremediation reagents into the 2-feet of soil at the bottom of the remediation locations; and backfilling the excavations with stockpiled overburden soils, salvaged soils, or approved import material and associated project restoration as shown on the Contract Plans, these Contract Provisions, and the Standard Specifications.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS