Johnson Springview Pedestrian Bridge Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Rocklin is advancing the Johnson-Springview Pedestrian Bridge Project, a 170-foot free-span pedestrian bridge over Antelope Creek, to be constructed using three prefabricated truss segments, each 40 to 60 feet long. The bridge will be installed with abutments placed outside the 100-year floodplain and above the top of bank, while north and south approach embankments will be graded to meet a deck elevation of approximately 228 feet. The project requires compliance with California Fish and Game Code Section 1602, as evidenced by Streambed Alteration Agreement EPIMS Notification PLA-65489-R2 issued by the California Department of Fish and Wildlife. Construction will adhere to strict environmental mitigation measures including silt fencing, topsoil preservation, equipment cleaning to prevent invasive species, and revegetation with native plant species from Table BIO-1. Work must occur within designated hours—weekdays from 7:00 a.m. to 7:00 p.m. and weekends from 8:00 a.m. to 7:00 p.m.—and shall utilize existing trails with temporary widening for access. All activities must comply with CEQA, City of Rocklin ordinances, and applicable state regulations, including adherence to PCAPCD Rules 202, 205, 218, and 228 for air quality, and CARB Tier 3 standards for construction equipment over 50 horsepower. A Mitigation Monitoring and Reporting Program mandates pre-construction botanical surveys by qualified botanists, archaeological monitoring meeting Secretary of the Interior standards, and cultural awareness training for all personnel. Discovery of cultural or paleontological resources requires immediate work stoppage and consultation with the United Auburn Indian Community or the University of California Museum of Paleontology, respectively. The City of Rocklin serves as lead agency, providing oversight through David Mohlenbrok, who acts as the primary point of contact. Although no formal contract value, pricing structure, or standard FAR clauses are specified, the project is structured under a special-notice procurement with an initial study dated January 27, 2026, and a solicitation deadline of March 3, 2026. Environmental documentation, including biological and cultural resource assessments, is integral to approval and acceptance, which occurs at the site in Johnson-Springview Park, Rocklin, California, with final verification conducted by the city

General Info

Rocklin to build 170-foot prefab pedestrian bridge over Antelope Creek with strict environmental and cultural protections.

Agency

California → City of Rocklin

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Rocklin, CA

Set-Aside

NONE

Documents

(5)

Johnson Springview Pedestrian Bridge Project Notice of Availability

PDFspecial-notice

Johnson Springview Pedestrian Bridge Project Notice of Completion & Environmental Document Transmittal

PDFnotice-of-completion

Johnson Springview Pedestrian Bridge Project Summary Form

PDFenvironmental-summary

PLA-65489-R2 Notice of Determination for Johnson-Springview Pedestrian Bridge

PDFnotice-of-determination

Johnson Springview Pedestrian Bridge Project Initial Study and Environmental Checklist

PDFinitial-study

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Rocklin
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Rocklin
Office AddressN/A
Contacts
Patrick MoeszingerSenior Environmental Scientist, Specialist

Interested Companies (1)

Show more
LSA Associates
Irvine, CA

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number PLA-65489-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of Rocklin Department of Public Services. The project is limited to the construction of a new free-span pedestrian bridge over Antelope Creek spanning approximately 170 feet in length and consisting of a single prefabricated truss structure, which will be installed in 3 spliced segments, each approximately 40 to 60 feet long. The north and south approach embankments will be graded to meet the bridge deck elevation of approximately 228 feet, and the bridge abutments will be installed on either side of Antelope Creek, outside the 100-year floodplain limits and above the top of bank.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 18 hours ago

DEADLINE

in 24 days
View Details