The City of Rocklin is advancing the Johnson-Springview Pedestrian Bridge Project, a 170-foot free-span pedestrian bridge over Antelope Creek, to be constructed using three prefabricated truss segments, each 40 to 60 feet long. The bridge will be installed with abutments placed outside the 100-year floodplain and above the top of bank, while north and south approach embankments will be graded to meet a deck elevation of approximately 228 feet. The project requires compliance with California Fish and Game Code Section 1602, as evidenced by Streambed Alteration Agreement EPIMS Notification PLA-65489-R2 issued by the California Department of Fish and Wildlife. Construction will adhere to strict environmental mitigation measures including silt fencing, topsoil preservation, equipment cleaning to prevent invasive species, and revegetation with native plant species from Table BIO-1. Work must occur within designated hours—weekdays from 7:00 a.m. to 7:00 p.m. and weekends from 8:00 a.m. to 7:00 p.m.—and shall utilize existing trails with temporary widening for access. All activities must comply with CEQA, City of Rocklin ordinances, and applicable state regulations, including adherence to PCAPCD Rules 202, 205, 218, and 228 for air quality, and CARB Tier 3 standards for construction equipment over 50 horsepower. A Mitigation Monitoring and Reporting Program mandates pre-construction botanical surveys by qualified botanists, archaeological monitoring meeting Secretary of the Interior standards, and cultural awareness training for all personnel. Discovery of cultural or paleontological resources requires immediate work stoppage and consultation with the United Auburn Indian Community or the University of California Museum of Paleontology, respectively. The City of Rocklin serves as lead agency, providing oversight through David Mohlenbrok, who acts as the primary point of contact. Although no formal contract value, pricing structure, or standard FAR clauses are specified, the project is structured under a special-notice procurement with an initial study dated January 27, 2026, and a solicitation deadline of March 3, 2026. Environmental documentation, including biological and cultural resource assessments, is integral to approval and acceptance, which occurs at the site in Johnson-Springview Park, Rocklin, California, with final verification conducted by the city
General Info
Agency
NAICS
Place of Performance
Rocklin, CASet-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code