Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Johnson Springview Pedestrian Bridge Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Johnson Springview Pedestrian Bridge Project, identified by solicitation number ENV2026-0001, involves the construction of a 170-foot free-span pedestrian bridge over Antelope Creek in Rocklin, California. The project is led by the City of Rocklin and consists of a prefabricated truss structure installed in three spliced segments, each between 40 and 60 feet long. The bridge will feature a 10-foot clear width between railings and an overall width of 12 feet. Key civil works include grading north and south approach embankments to a deck elevation of approximately 228 feet, installing abutments outside the 100-year floodplain limits, and constructing new paved pathways to connect both sides of the bridge. The structure is designed to provide two feet of freeboard above the 100-year base flood elevation. Regulatory compliance is a central component of the project, as it is subject to Streambed Alteration Agreement EPIMS Notification Number PLA-65489-R2 under section 1602 of the Fish and Game Code, executed by the California Department of Fish and Wildlife. Environmental reviews, including a Mitigated Negative Declaration and an Initial Study, have been conducted to address impacts on air quality, special-status species, and cultural resources. The project must adhere to City of Rocklin grading and erosion control standards, NPDES permits, and Rule 205 regarding air contaminants. Additionally, the project requires specific protocols for the treatment of cultural resources, including mandatory confidentiality training for personnel and coordination with the Native American Heritage Commission if human remains are encountered.

General Info

City of Rocklin construction of a 170-foot pedestrian bridge over Antelope Creek.

Agency

California → City of Rocklin

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Rocklin, CA

Set-Aside

NONE

Documents

(5)

Johnson Springview Pedestrian Bridge Project Notice of Availability

PDFspecial-notice

Johnson Springview Pedestrian Bridge Project Notice of Completion & Environmental Document Transmittal

PDFnotice-of-completion

Johnson Springview Pedestrian Bridge Project Summary Form

PDFenvironmental-summary

PLA-65489-R2 Notice of Determination for Johnson-Springview Pedestrian Bridge

PDFnotice-of-determination

Johnson Springview Pedestrian Bridge Project Initial Study and Environmental Checklist

PDFinitial-study

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Rocklin
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Rocklin
Office AddressN/A
Contacts
Patrick MoeszingerSenior Environmental Scientist, Specialist

Interested Companies (1)

Show more
LSA Associates
Irvine, CA

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number PLA-65489-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of Rocklin Department of Public Services. The project is limited to the construction of a new free-span pedestrian bridge over Antelope Creek spanning approximately 170 feet in length and consisting of a single prefabricated truss structure, which will be installed in 3 spliced segments, each approximately 40 to 60 feet long. The north and south approach embankments will be graded to meet the bridge deck elevation of approximately 228 feet, and the bridge abutments will be installed on either side of Antelope Creek, outside the 100-year floodplain limits and above the top of bank.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS