Joint Outfall H Trunk Sewer Group 2 Rehabilitation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the rehabilitation of approximately 13,320 feet of existing 21- to 42-inch diameter reinforced concrete pipe across multiple segments of the Joint Outfall H Trunk Sewer system, including Units 8E, 8K, 8M, 8H, 8G, and Dalton Trunk Section 3, using cured-in-place pipe (CIPP) lining technology. Additionally, thirty-nine manholes located along these segments will be rehabilitated with a protective coating system to enhance durability and reduce infiltration. All work is confined to existing infrastructure within the City of Baldwin Park, Irwindale, Azusa, West Covina, and unincorporated areas of Los Angeles County, with no expansion of capacity or new construction permitted. The project is administered by the Los Angeles County Sanitation District, also referred to as Sanitation District No. 2 of Los Angeles County, and is classified under CEQA exemptions Sections 15301 and 21080(b)(4) as a repair of an existing public facility, eliminating the need for environmental impact review. The place of performance is explicitly in California, with work divided into three distinct segments defined by manhole locations. No formal contract value, pricing data, or payment terms are provided, as this document is a forecast rather than a solicitation or awarded contract. Submissions for environmental compliance must be made via email to rrccceqafiling@rrcc.lacounty.gov and include a completed CEQA Email Filing Customer Transmittal form with supporting documentation, with no specified deadline, page limits, or proposal format beyond this requirement. Contract administration is overseen by Marvin Holmes, Engineer Associate III, and other agency personnel, though no Contracting Officer’s Representative or formal oversight roles are designated. No federal acquisition regulation clauses, military packaging standards, or standard contract types are applicable; the project operates under local regulations and internal district procedures without requiring security clearances, key personnel certifications, or organizational conflict of interest provisions. Invoicing is conducted monthly via email using the agency’s billing account number 3060, with no mention of federal invoicing systems or accounting classifications.

General Info

Rehabilitate 13,320 feet of sewer pipe and 39 manholes using CIPP lining in Los Angeles County, no new construction.

Agency

California → Los Angeles County Sanitation District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Joint Outfall H Trunk Sewer Group 2 Rehabilitation Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Sanitation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles County Sanitation District
Office AddressN/A
Contacts
Marvin HolmesEngineer Associate III

Full Description

Show more
This project consists of rehabilitation of approximately 13,320 feet of existing 21- to 42-inch diameter reinforced concrete pipe (RCP) on the Joint Outfall H Unit 8E Trunk Sewer, Joint Outfall H Unit 8K Relief Trunk Sewer, Joint Outfall H Unit 8M Relief Trunk Sewer, Joint Outfall H Unit 8M Trunk Sewer, Dalton Trunk Section 3, Joint Outfall H Unit 8H Trunk Sewer, and Joint Outfall H Unit 8G Trunk Sewer with cured-in-place pipe (CIPP) lining and rehabilitate approximately thirty-nine (39) manholes with a protective coating system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Hagerstown Wastewater Treatment Plant Improvements - Phase 1
Solicitation # hagerstown-wastewater-treatment-plant-improvements-phase-1
The Hagerstown Wastewater Treatment Plant Improvements - Phase 1 project, managed by Carl Belt, Inc., focuses on upgrading aging infrastructure in Maryland to ensure compliance with nitrogen and phosphorous limits and NPDES thermal requirements. The scope of work includes the replacement of influent screens, washer compactors, in-plant pumps, and RAS pumps, as well as the addition of a WAS pump to Final Clarifier No. 1. Key structural and electrical improvements involve installing a building to enclose the headworks, constructing a dedicated building for a new chemical storage tank, replacing motor control centers, PLCs, and switchgear, and repairing concrete at the headworks. Additional tasks include modifying primary sludge pump discharge piping, adding a nitrate probe to BNR basins, and performing various building repairs to the roof, HVAC, and windows. This is a wage-rated solicitation with a response deadline of August 17, 2026, at 4:00 PM. The project strongly encourages participation from small businesses, including SDB, WOSB, HUBZone, and veteran-owned concerns, and specifically seeks MBE, DBE, and WBE participants for various electrical, mechanical, and masonry subcontracts, as well as specialized suppliers for wastewater pumps and sluice gates. Bids and detailed plans are managed through the Carl Belt, Inc. website, with primary administrative contact provided by Jared Burkett.
Carl Belt, Inc.

POSTED

about 5 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
Wharton-Smith, Inc. is soliciting proposals from State of Florida Certified Disadvantaged Business Enterprise (DBE) subcontractors and suppliers for the Cypress Lake WTP, Wellfield, and Raw Water Main project in Osceola County, Florida. This project, owned by the Central Florida Water Cooperative, has an estimated value of 270 million dollars. The scope of work is extensive, involving the construction of raw water production wells, well heads, well pumps, discharge piping, and a surge bladder tank. Additional requirements include site civil work, a wellhead cage, an electrical building, a standby generator, and the construction of several specialized facilities, including Operations and Reverse Osmosis buildings, a Pretreatment Chemical Building, a Post-Treatment Chemical Building, a Post-Treatment Degasification System, and an Odor Control Air Exhaust Dispersion Stack System. The project also requires production well disinfection and primary and secondary water quality analytical laboratory testing to achieve regulatory certification. Bidding documents are available for free download via ConstructConnect. Interested parties must submit their proposed scope of work at least 24 hours before the bid date, with firm pricing due by 10:00 AM on the day of the bid. The final bid deadline is August 19, 2026, at 2:00 PM EST. Proposals should be emailed to Nichole Voitel at watergmpbids@whartonsmith.com. Wharton-Smith, Inc. has indicated a willingness to review responsible quotes and negotiate terms where appropriate.
Wharton-Smith, Inc.

POSTED

about 5 hours ago

DEADLINE

in 5 days
View Details