Joint Outfall H Trunk Sewer Group 2 Rehabilitation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Joint Outfall H Trunk Sewer Group 2 Rehabilitation project, managed by the Los Angeles County Sanitation District, involves the rehabilitation of approximately 13,320 feet of 21- to 42-inch diameter reinforced concrete pipe and the protective coating of 39 manholes. The scope of work utilizes cured-in-place pipe lining to restore structural integrity and hydraulic capacity across several segments, including Units 8E, 8K, 8M, 8H, 8G, and Dalton Trunk Section 3. Performance is located within the City of Baldwin Park, Irwindale, Azusa, West Covina, and unincorporated areas of Los Angeles County. This project is currently categorized as a forecast with a posted date of July 29, 2025. It is exempt from the California Environmental Quality Act under Guidelines Section 15301 and Public Resources Code Section 21080(b)(4), as the work consists of repairs to existing public facilities without expansion of use. Administrative oversight is provided by Project Engineer Marvin Holmes, and the project is governed by local municipal and environmental regulations rather than federal acquisition standards. No specific contract value, performance timeline, or formal evaluation criteria have been disclosed in the available documentation.
General Info
Agency
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
