Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Joint Sealant and Water Stop Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Joint Sealant and Water Stop Installation involves providing specialized services for prime contractors on California Department of Water Resources projects. The primary objective is to ensure the watertight integrity of canal liners by installing new water stops and applying industrial-grade joint sealants to concrete panels. All work must be performed according to original design standards to deliver fully sealed joints. The opportunity was posted on January 29, 2026, under NAICS code 238990. It focuses on the delivery of critical infrastructure sealing components to prevent leakage within the state water system.

General Info

Subcontract for joint sealant and water stop installation on California water resource projects.

Agency

California Water Resources, Department of

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of OM-SFD-2026-1.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CAAQ Canal Liner Repairs (OM-SFD-2026-1)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom CAAQ Canal Liner Repairs (OM-SFD-2026-1)
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
ContactsNo contacts available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs specialized water stops and joint sealants for prime contractors on California Department of Water Resources projects to ensure watertight integrity of the canal liner. Installs new water stops and applies joint sealants to concrete panels using industrial-grade materials. Ensures fully sealed joints per original design standards. Delivers fully sealed joints and installed water stops.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. With an estimated contract value between 18.5 million and 19.5 million dollars, the scope of work involves the rehabilitation of open and covered concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to instrumentation and electrical systems, replacement of motor control center components, and the installation of new slide gates and access platforms. The project also encompasses excavation, trench work, and surveying of reactor areas. This solicitation is issued by Ranger Pipelines Incorporated and is designated as a Small Business set-aside, encompassing SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The project seeks certified DBE, DVBE, and SBE subcontractors for specialized services including coating, concrete rehabilitation, electrical work, welding, and crane services. All subcontractors must comply with applicable state, county, and federal regulations. The bid opening is scheduled for December 2, 2026, at 2:00 PM.
Ranger Pipelines Incorporated

POSTED

about 7 hours ago

DEADLINE

in 12 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS