Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on May 21, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Jordan Bridge Construction on George Washington & Jefferson NF

Closed
12339520R0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 11 hours ago

DEADLINE

in about 17 hours
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 12 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
FY 2027 Asphalt Resurfacing Program
Solicitation # BCFY27-17
The Boone County Fiscal Court is soliciting bids for the FY 2027 Asphalt Resurfacing Program, solicitation number BCFY27-17, to perform milling and paving services on identified county roads and streets. The scope of work includes improving profiles and cross sections using Class 2 Asphalt Surface 0.38D PG64-22, which involves milling existing pavement at a minimum width of six feet from the gutter line, road preparation, and the installation of trackless tack coat. The contractor is also responsible for adjusting manholes, drainage structures, and valve boxes, as well as providing pavement markings and temporary traffic control in accordance with KYTC and MUTCD standards. The project is scheduled for a purchase order issuance on December 1, 2026, with a final completion deadline of June 1, 2027. Eligibility is limited to contractors prequalified by the Kentucky Transportation Cabinet. Bidders must submit an electronic bid bond equal to 5% of the bid, and the successful awardee must provide a surety bond for 100% of the contract amount from a Kentucky-licensed surety. The contract will be awarded to the lowest responsive and responsible bidder, with considerations for Kentucky resident and qualified bidder preferences. Required submittals include a W-9 form, a certificate of insurance, and a Critical Path Method schedule. Performance is subject to strict quality inspections regarding mix design, compaction, and ride quality, with a penalty of 2,500 dollars per day for failure to complete the work by the final deadline.
Public Works

POSTED

about 12 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Main Street Concrete Curbing, Sidewalk, and Driveways.
Solicitation # 27-02
The City of Bartow, Florida, has issued solicitation 27-02 for the Main Street Concrete Curbing, Sidewalk, and Driveways project. This initiative focuses on improving roadway conditions, pedestrian accessibility, and compliance with current standards along Main Street, extending from Highway 60 west to the railroad crossing east of Highway 17. The scope of work includes full roadway repaving and the installation or replacement of concrete curbing, sidewalks, and driveways. All work must adhere to the 2026 FDOT Standard Specifications for Road and Bridge Construction, specifically FDOT Curb and Gutter 300 and Sidewalk 310, as well as MUTCD requirements for traffic management. The successful bidder must provide all labor, materials, equipment, and supervision, including the development of a City-approved Maintenance of Traffic plan and the restoration of all disturbed areas. The contract will be awarded to the lowest responsive and responsible bidder, with preferences afforded to Veteran Business Enterprises and Women/Minority Business Enterprises. Bidders must have been in business under the same name and tax identification number for at least three years. Required submittals include a variety of affidavits and certifications, such as non-collusion, drug-free workplace, and trench safety compliance. Financial security requirements include a bid bond for the submission and performance and payment bonds for contracts exceeding 250,000 dollars. Insurance carriers must maintain an AM Best Rating of A-VII or better. Compensation is based on unit prices applied to actual field measurements, and combined overhead and profit for change orders are capped at 10 percent. Responses are due by November 25, 2026, via the OpenGov portal or in-person delivery to the City of Bartow.
Public Works

POSTED

about 12 hours ago

DEADLINE

in about 1 month

General Info

Contract Value

$1,193,648.5

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Natural Bridge Station, VA, 24579, USA

Set-Aside

SBA

Award Issued Date

Documents

17

080805000003192_FS_Bridge_Inspection_2018.pdf

PDF

0808_76-0.3_Jordan+Bridge_SIGNATURE+SHEET_20200302.pdf

PDF

12339520R0001+amendment+0002.pdf

PDF

Amendment+0001+12339520R0001.pdf

PDF

Buena+Vista+Site+Topo+-LOD.pdf

PDF

Copy+of+SOI+-+FS+76+Jordan+Br+Replacemnt+%28002%29.xls

XLS

DOL+wage.pdf

PDF

Drawing+and+Specifications.pdf

PDF

FS+Supplemental+Project+Specs+-+FS+76+Jordan+Bridge.pdf

PDF

FS+Supplemental+Project+Specs+-+FS+76+Jordan+Bridge+-+updated.docx

DOCX

Jordan+Bridge+Signed+CE.pdf

PDF

Jordan+Br+Plan+Sheet+-+R4801+-+175-AA.pdf

PDF

Letter+of+Geotechnical+Findings+-+USFS+Bridge+on+Jordan+Road+over+Pedlar+R.pdf

PDF

Past+Performance+Evaluation+Survey.doc

DOC

Pre-bid+minutes+jordan+bridge.pdf

PDF

RFI+responses+Jordan+Bridge.rtf

RTF

Solicitation+12339520R0001-+GWJ+Jordan+Bridge+FS+76.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

9 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 1, 2020 to Jun 4, 2020. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → George Washington/jefferson National Forest
Contacts2 people available
OfficeROANOKE, VA, 24019, USA

Full Description

Show more
The United States Forest Service (USFS), George Washington and Jefferson Supervisor's Office, located at 5162 Valleypointe Pkwy, Roanoke, VA 24019 is posting the following solicitation for construction. The construction will take place on the Glenwood Pedlar Ranger District, located in Natural Bridge, Virginia. Construction involves the demolition, removal, and rebuilding of the Jordan Bridge on Forest Service Road (FSR) 76. The Jordan Road bridge is located at milepost 0.3 at the crossing with the Pedlar River and adjacent to the Oronoco Campground (Latitude 37.7498333'N, -79.26455'W). This solicitation is 100% set-a-side for small business. The NAICS code for this requirement is 237310 (sizestandard $36.5 million). The USFS anticipates awarding a firm-fixed price award contract. All responsible, qualified small businesses may submit an offer which will be considered by the Forest Service. All Offerors shall be registered at the System for Award Management (www.beta.sam.gov) prior to submitting a proposal. The solicitation is made avaialble today, May 1, 2020. The contract performance period is 210 days. This solicitation will be distributed solely through the General Services Administration's FederalBusiness Opportunities web site at www.fbo.gov, which is now called beta.sam.gov (https://beta.sam.gov/search). This site provides downloading instructions. Hard copies of the solicitation will not be distributed. Responses will not be provided to telephone messages. All future information regarding this acquisition, including amendments, will be distributed through this site. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. The successful contractor will need to supply all insurance certificates, bonding and adhere to all Davis-Bacon Wage Rates associated with solicitation. Interested parties are responsible for monitoring this site to ensure they have the most up-to-date information about this solicitation. Each offeror is required to maintain registration in the System for Awards Management at www.sam.gov and complete the Offeror Representations and Certifications. Questions pertaining to this solicitation shall be submitted in writing to Kelvin Jackson at kelvin.jackson1@usda.gov. A Pre-bid site vist is schedule for May 11, 2020, beginning at 09:30 a.m. EST. Refer to the solicitation details as there may be more than one site visit scheduled for this day due to the current COVID-19 restrictions. Site visits shall be no more than 90 minutes. Pursuant to Federal Acquisition Regulation (FAR) 36.204, the estimated magnitude of the project lies between $500,000 to $1,000,000 (NOTE: This range is one of 8 available ranges from FAR 36.204 and is not meant to imply that the project has necessarily been estimated/budgeted to the maximum of the selected range. It merely conveys that the estimate/budget lies somewhere within that range.) UPDATED 5/6/2020- SITE VISIT NOTIFICATION FROM CONTRACTORS **THIS OFFICE IS EXTENDING THE TIME IN WHICH CONTRACTORS ARE TO MAKE NOTIFICATION ON WHETHER THEY SHALL BE ATTENDING THE SITE VISIT ON 5/11/2020. THE PREVIOUS TIME FOR RESPONSES WAS SET FOR 10:00 A.M. EST, 5/6/2020. ALL CONTRACTOR'S INTERESTED IN ATTENDING THE SITE VISIT SHALL EMAIL kelvin.jackson1@usda.gov BY 16:00 P.M. EST, ON 5/7/2020. CONTRCTORS SHALL BE NOTIFIED VIA EMAIL TO THEIR TIME FOR THE SITE VISIT AS THERE COULD BE MORE THAN ONE TIME SLOT FOR THE SITE VISIT. NO OTHER INFORMATION TO THIS SOLICITATION HAS BEEN CHANGED. ** UPDATE 5/12/2020- MINUTES FROM SITE VISIT (NOTE THE TIME TO SUBMIT QUESTIONS IN BOLD WITHIN MINUTES). iN ADDITION THE USFS SHALL ATTACH THE MOST RECENT NEPA DOCUMENT OF THE SITE AREA AND ANY ORIGINAL DRAWINGS OF THE JORDAN BRIDGE WITHIN THE WEEK. UPDATE 5/13/2020- Located in the attachments section are the following documents the USFS has agreed to release to assist in this project. These documents are for informational purposes only and do not change any aspects of the current drawings or specifications presented earlier in the soliciation. UPDATE 5/19/2020- AMENDMENT 0001 HAS BEEN ADDED TO THE ATTACHMENT SECTION. NOTED IS NEW PROPOSAL DUE DATE- JUNE 4, 2020, NO LATER THAN 12:00 P.M. ET. UPDATE 5/21/2020- AMENDMENT 0002 ADDED NOTING CHANGES IN SECTION C, SECTION H, UPDATED FSSS, SCHEDULE OF ITEMS CHANGE, RESPOSNES TO CONTRACTOR QUESTIONS AND MAP SHOWING LIMITS OF DISTURBANCE.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS