Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Georgia was posted on May 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

JROTC Competition Rifle Range

Closed
PE-55046-NONST-2027-000000025State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530, project number 7190530, involves upgrading life health safety systems within Hangar 250 at MCAS Cherry Point in Havelock, North Carolina. The scope of work encompasses architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work occurs in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price. Bidders must submit proposals by September 21, 2026, and those exceeding 150,000 dollars are required to provide bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act and Buy American requirements. Key deliverables include a facility operating plan and manufacturer-provided training information. Administrative requirements include submitting invoices via Wide Area Workflow and providing a detailed schedule of prices within 15 days of the award. Quality control is heavily emphasized, requiring the Contracting Officer's acceptance of a QC plan before any construction work, other than mobilization and surveying, may begin.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project encompasses the renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED vanity lighting. To maintain center operations, contractors must utilize a phased sequencing approach, renovating one dormitory at a time. All work must comply with ADA, OSHA, and National Electrical Code standards, and contractors are responsible for the daily off-site disposal of all debris. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a completed bid sheet with an itemized cost breakdown separating labor and materials, a detailed project schedule specifying calendar days and working hours, and proof of current Vermont state professional licensing and insurance. The award will not be based solely on the lowest bid, as ETR will evaluate technical alignment with the scope of work to minimize future change orders. Winning bidders must maintain active registration in SAM.gov and provide a Unique Entity ID. The contract incorporates various FAR clauses, including requirements for the Davis-Bacon Act, anti-lobbying certifications, and combating trafficking in persons. Payment terms are net 30 days, contingent upon the submission of a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 7 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract involves the remodeling of the gymnasium at St. Mary’s Elementary School in Columbus, Georgia, into a JROTC competition-grade rifle range. The selected Construction Manager at Risk (CM) will act as both contractor and construction manager, performing the work under the AIA A133-2019 Standard Form of Agreement. Payment will be based on the cost of work plus a fee, with a guaranteed maximum price established. The scope of work includes a full range of construction trades such as mechanical, electrical, plumbing, demolition, painting, and flooring, while ensuring compliance with ADA standards and local ordinances. Additionally, the CM will provide services like cost estimating, constructability analysis, and assist in scheduling and phasing to facilitate efficient and phased construction that may proceed simultaneously. The project requires collaboration between the CM, the school district, and the architect to finalize scheduling, phasing, and value engineering to optimize cost and construction efficiency. Substantial completion of the project is expected by May 1, 2027. The solicitation was issued by the Muscogee County School District and posted on May 28, 2026, with responses due by July 2, 2026. The primary contact for this solicitation is Raymond Carrion. The project location and scope reflect a specialized upgrade designed to meet the standards necessary for JROTC competitive activities within an educational facility.

General Info

Remodel gym at St. Mary’s School into JROTC rifle range; CM manages construction, deadline May 2027.

Agency

Georgia → Muscogee County School DistrictView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(1)

RFP for Construction Manager for JROTC Rifle Range Project

PDFrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Muscogee County School District
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → Muscogee County School District
View Agency Profile
Office AddressN/A

Full Description

Show more
The Project is to be performed pursuant to the AIA A133-2019 Standard Form of Agreement with payment based on the cost of work, plus a fee and with a guaranteed maximum price. The successful proposer (the Construction Manager at Risk (CM)) shall serve as the contractor and construction manager for the Project. The construction is to remodel the Gymnasium at St. Mary¿s Elementary School site, 4408 St. Mary¿s Road, Columbus, GA 31907, into a JROTC competition grade rifle range. The work might include all typical construction trades, including mechanical, electrical, plumbing, demolition, painting, floor covering, other finishes, as well as ADA compliance work and local ordinance compliance work. The services will consist of cost estimating, constructability analysis and scheduling and phasing of the work and construction, which may proceed concurrently. The CM will assist the School District and its Architect in finalizing the phasing and scheduling of the work and value engineering of the Project. Substantial Completion shall occur before Saturday, May 1, 2027.

More opportunities from Georgia → Muscogee County School District

Same awarding agency

NAICS: 237310
SLED
Hardaway HS Rear Entry Drive Upgrade
Solicitation # PE-55046-NONST-2027-000000026
The Muscogee County School District is seeking a Construction Manager at Risk (CM) for the Hardaway HS Rear Entry Drive Upgrade project in Columbus, Georgia. This project involves comprehensive sitework, including paving, retaining walls, and utility work, as well as potential minor interior construction and compliance work for ADA and local ordinances. The selected CM will provide pre-construction services such as cost estimating, constructability analysis, and value engineering, collaborating with the project engineer, Moon Meeks & Associates, Inc., to finalize scheduling and phasing. The contract will be administered under the AIA A133-2019 Standard Form of Agreement, with payment structured as the cost of work plus a fee, subject to a guaranteed maximum price (GMP). Substantial completion of the project is required by June 30, 2027. Proposals are due by September 22, 2026, and will be evaluated based on the CM's fee (25%), financial stability (20%), relative experience and qualifications (20%), past performance (20%), and the quality of the proposed management plan (15%). The successful proposer must provide proof of 100% performance and payment bonds and maintain comprehensive insurance coverage, including a 5 million dollar excess liability umbrella and builder's risk insurance for 100% of the GMP. Additionally, the contractor must comply with Georgia's SB 529 Security and Immigration Compliance Act and the district's non-discrimination policies. The selection process involves an evaluation committee that may interview the highest-scoring proposer before making a final recommendation to the School District Superintendent.
Highway, Street, and Bridge Construction

POSTED

about 1 month ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS