Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on September 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Judicial Building- Awning Replacement: 2nd Request for Quote

Closed
RF-7125-FM.1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238190
New
CBP7857 Center Gate Replacements
Solicitation # CBP7857
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to provide fence and gate repair services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work requires the contractor to provide all labor, materials, equipment, engineering, and supervision necessary to repair or replace designated drive gates, including field verification of dimensions and power requirements. The estimated price range for this project is between 0 and 25,000 dollars. Bids are due by November 17, 2026, and must be submitted via email to Tom Williams. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. Award decisions will be based on overall best value. Required submission documents include the official MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, proof of insurance, and a completed MTC Supplier Packet including a W-9 and self-certification. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wage rates and fringe benefits for Washoe County, Nevada. Contractors must provide certified proof of wage compliance and display the Employee Rights under Title VII Employment Act poster. Additional requirements include adherence to OSHA guidelines, Buy American regulations, and the submission of two sets of operation and maintenance manuals upon completion. Final acceptance is contingent upon a substantial completion inspection, the resolution of a punch list, and the submission of a final pay request and certified payroll reports.
Sierra Nevada Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in 9 days
NAICS: 238190
New
SLED
Construction, CCSO Subsurface Water Intrusion
Solicitation # 2026-404
Invitation for Bid 2026-404 is a solicitation issued by Collin County, Texas, for construction repairs to address subsurface water intrusion and moisture-related deterioration at the lower level of the south side of the Collin County Justice Center in McKinney. The project has a probable construction cost of 200,000 dollars, which includes a not-to-exceed allowance of 100,000 dollars for unknown conditions discovered after selective demolition. The scope of work encompasses providing all labor, materials, and equipment for repairs involving cast-in-place concrete, brick masonry, self-adhering sheet waterproofing, air and moisture barriers, and joint sealants. Bids are due by December 3, 2026, and the contract will be awarded to the lowest and best responsible bidder based on compliance, pricing, qualifications, and past performance. The selected contractor must provide a 5 percent bid security and subsequently furnish performance and payment bonds at 100 percent of the contract price, along with a two-year maintenance bond at 10 percent. Key contractual requirements include adherence to Texas prevailing wage rates, the submission of a professional engineer-sealed trench safety plan, and compliance with ADA standards. The contract remains in effect until project completion or termination via a 30-day written notice, with liquidated damages set at 500 dollars per calendar day for failure to meet the completion schedule. Payments are processed via approved applications for payment and a schedule of values, with final payment issued upon acceptance of the work as recommended by the engineer.
Construction and Projects

POSTED

3 days ago

DEADLINE

in 25 days
NAICS: 238190
New
SLED
City Hall Second Floor Door Replacements
Solicitation # 26-097-ITB
Solicitation #26-097-ITB, issued by the City of West Sacramento, seeks a qualified contractor to replace two existing half-swing doors at the second-floor public permitting counter of City Hall with two new full-height, lockable interior doors. The scope of work includes the demolition and disposal of existing doors, installation of solid-core wood doors with hap glass vision lites and hollow metal frames, and the necessary patching and refinishing of affected walls, flooring, and counters to match existing finishes. A critical component of the project is the preparation of the main door for badge access control, requiring the installation of electrified strikes, door position switches, power transfer paths, and conduit with pull strings. All work must comply with the California Building Code, and the contractor is responsible for obtaining all permits and coordinating inspections. The contract is estimated at 8,500 dollars and will be awarded to the lowest responsive and responsible bidder. The successful contractor must provide a detailed work schedule within ten days of contract execution and complete all work within thirty working days of the Notice to Proceed. Key requirements include DIR registration for prevailing wages, the provision of performance and payment bonds totaling 100 percent of the bid price, and adherence to the City's insurance checklist. Bidders must submit their proposals through the City's e-Procurement Portal by November 24, 2026, including a signed W-9 and debarment certification. Evaluation will be based on the bidder's technical organization, financial resources, and experience with projects of comparable magnitude.
City of West Sacramento

POSTED

3 days ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The county facilities department is seeking a contractor to construct and install a walkway cover between two buildings at 190 W. Government Street, designed to provide shelter for employees crossing during inclement weather. The project aims to enhance safety and convenience for staff by offering protection from rain while moving between structures. The solicitation, titled "Judicial Building- Awning Replacement," was posted on September 29, 2025, with a response deadline of October 6, 2025. The project is categorized under NAICS code 238190, indicating specialized construction services, with an estimated contract value ranging from $50,000 to $150,000. Interested contractors can contact the primary point of contact, David Miller, via email or phone for further details. Additional project information and updates are accessible through the provided online procurement portal.

Documents

3
PDF, High priority: read this firstrfq
High
PNG
PNG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Escambia Facilities
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → Escambia Facilities
Office AddressN/A

Full Description

Show more
The county facilities department is looking for a contractor to build/install a walk way cover between two building that will provide shelter for employees crossing from one building to another on rainy days.This project is located at 190 W. Government St.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS