Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Junction Drive ADA Improvements

Forecast
06-1A400State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Junction Drive ADA Improvements project, managed by Caltrans District 6 in Fresno/Bakersfield, focuses on enhancing pedestrian accessibility and infrastructure at the intersection of State Route 49 and Junction Road in Oakhurst, Madera County. The scope of work includes the installation of ADA-compliant curb ramps, the replacement of a drainage inlet, and the installation of a manhole in the northeast quadrant. Additionally, Accessible Pedestrian Signals push buttons will be upgraded across all four quadrants of the intersection. The project involves minor right-of-way take, a temporary construction easement, and vegetation removal, though no trees will be removed. This project is currently listed as a forecast and is identified by Federal-Aid Project Number 0620000005. It has been determined to have no significant environmental impact, qualifying for a NEPA categorical exclusion under 23 CFR 771.117(c)(22) and a CEQA Class 1 exemption for the maintenance of existing facilities. Key personnel overseeing the project include Project Manager Tarek Chowdhury and Senior Environmental Scientist Robert Scott. While the project adheres to ADA design standards and federal funding authorities 23 USC 326 and 327, specific contract values, performance timelines, and formal solicitation numbers have not been provided.

General Info

Install ADA curb ramps, drainage upgrades, and signals at SR-49/Junction Road in Oakhurst, CA, under Caltrans oversight.

Agency

California → Caltrans, District 6 - Fresno/Bakersfield

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 6 - Fresno/Bakersfield
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 6 - Fresno/Bakersfield
Office AddressN/A

Full Description

Show more
This project would install Americans with Disabilities Act (ADA) curb ramps, replace the drainage inlet, and install a manhole on the northeast quadrant of the intersection. Accessible Pedestrian Signals (APS) system push buttons will be upgraded on all four quadrants of the intersection. There will be vegetation removal, but no tree removal.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 23 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS