Jurupa Valley High School Well Bypass Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Jurupa Valley High School Well Bypass Project involves the complete demolition, installation, and commissioning of water and sewer infrastructure to support a bypass system, including approximately 50 linear feet of new 6-inch PVC C-909 water main and 140 linear feet of new 4-inch PVC SDR-35 sewer main. The scope encompasses the installation of a water meter, chlorine analyzer, flow meter, reduced pressure backflow device, swing check valve, gate valves, and an enclosure structure, along with connections to existing utility mains. All work requires trenching, bedding, backfilling, compaction, paving, surface restoration, electrical integration, and instrumentation setup, with strict adherence to ASTM, AWWA, NSF 60/61, and California Title 22 standards. Materials must be new, meet manufacturer specifications, and be properly marked with manufacturer name, material type, class, and wall thickness; HDPE pipe and gaskets require specific storage conditions to prevent damage, UV degradation, and corrosion, with steel fittings needing sacrificial zinc anode caps. Work must comply with the District’s approved material list and most stringent requirement when conflicts arise. The project is being procured under a Lowest Price Technically Acceptable (LPTA) basis by the Jurupa Community Services District in California, with bids due by 9:00 p.m. on August 13, 2026. All proposals must be submitted as a single PDF file via the PlanetBids portal, excluding email or fax submissions. Contractors must have a valid Department of Industrial Relations (DIR) registration, submit a bid bond if exceeding $150,000, and provide certifications confirming non-collusion and compliance with the Iran Contracting Act. The Contractor is required to complete all work within 100 calendar days after the Notice to Proceed and maintain a field superintendent on-site at all times, along with a 24-hour emergency contact. Certified payrolls, as-built drawings, and material certifications must accompany payment requests submitted electronically through the CIPO system. Inspections are solely conducted by the District, with failure to allow access or corrective non-compliant work at the Contractor’s expense resulting in rejection. Special requirements include potholing existing utilities, phasing and temporary bypass planning, protection of adjacent utilities and structures, and compliance with state storm water permits, with violations considered material breaches of contract. No UEI, CAGE code, size certification, or socioeconomic status is
General Info
Agency
NAICS
Place of Performance
Jurupa Valley, CA, 91752, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from California → Jurupa Community Services District
Same awarding agency
