This Solicitation opportunity from Saskatchewan Public Sector was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Kamsack Landfill Decommission
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Town of Kamsack is seeking tenders for the construction of the Kamsack Municipal Landfill Closure, located approximately 2 kilometres southwest of the town in Saskatchewan. The project focuses on the physical capping of the waste mount and associated closure works. Interested parties must submit their tenders via email to the Engineer by May 21, 2026, at 2 p.m. central standard time, ensuring that file sizes do not exceed 20 MB. The scope of work includes comprehensive site management such as mobilization, demobilization, safety programming, and stormwater management. Key technical requirements involve reshaping, grading, and compacting waste in the southern capping area, followed by the excavation of on-site borrow materials. The contractor will be responsible for developing a clay barrier test pad and constructing a minimum 500 mm thick engineered clay barrier cap topped with at least 150 mm of topsoil.
General Info
Place of Performance
SK, CANSet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The work to be undertaken generally involves, but is not necessarily limited to, the following: ▪ Mobilization and demobilization including transporting equipment to and from site; bonding; constructing and reclaiming any haul roads / laydown / operational areas required during construction; prime contractor duties and providing a safety program; obtaining permits, erosion controls, stormwater management within the work area; line locates; protection of all existing infrastructure and facilities; restoration of any existing infrastructure impacted during construction; traffic control separating public traffic from the construction area while maintaining public access to the transfer station; all temporary works and facilities necessary to complete the project; sourcing water for compaction; and clean up and close out of this project. ▪ Reshaping, cut/fill, grading, and compaction of the waste within the southern portion capping area footprint to required grades and lines to meet minimum and maximum design slope requirements. ▪ Preparation and stripping of on site borrow areas and stockpiling materials. ▪ Excavation of clay, fill, and topsoil materials from on-site borrow areas for the southern portion and development of a 20m by 20m clay barrier test pad for performance testing in advance of engineered clay barrier cap construction. ▪ Constructing a 500 mm thick (minimum) engineered clay barrier cap over the southern portion with suitable clay barrier material from the borrow areas. ▪ Constructing a 150 mm thick (minimum) layer of topsoil above the southern portion engineered clay cap, with suitable material from on-site stockpiles and borrow areas for the southern portion.
More opportunities from Saskatchewan Public Sector → Town of Kamsack
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance