Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Kaweah Oak Preserve Recharge Basin Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Kaweah Oak Preserve Recharge Basin Project, managed by the California State Water Resources Control Board Division of Water Quality, involves the installation of two reinforced flared concrete turnouts on the south bank of Deep Creek in Exeter, California. This infrastructure is designed to capture emergency flood overflow and direct it into three recharge basins created by the construction of berms within the preserve. The primary objective of the project is to manage emergency flood conditions and enhance groundwater recharge. Administrative oversight is provided by Environmental Scientist Samantha Parker and Engineer Luis Verdugo, with the project currently listed as a forecast posted on September 3, 2026.

General Info

California State Water Board installing concrete turnouts for flood overflow and groundwater recharge.

Agency

California → SWRCB, Division of Water Quality

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Exeter, CA

Set-Aside

NONE

Documents

(1)

Flattened PC signed - NOExemption Kaweah Delta Conservation District Kaweah Oak Project

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Water Quality
Contacts2 people available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Water Quality
Office AddressN/A
Contacts
Luis VerdugoEngineer
Samantha ParkerEnvironmental Scientist

Full Description

Show more
NWP 58 NOA for installing concrete turnouts on the south bank of Deep Creek to capture emergency flood conditions overflow into recharge basins. The purpose of the Project is to manage emergency flood overflows and enhance groundwater recharge by installing two reinforced flared concrete turnouts along the south bank of Deep Creek. Overflow flood water will flow into three recharge basins formed by constructing berms within the Kaweah Oaks Preserve.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and pipe installation, as well as structural and finishing tasks including masonry, welding, roofing, electrical work, and interior finishes. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a response deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) and administered by the EPA, making it subject to the American Iron and Steel (AIS) Provisions, Davis-Bacon Related Acts, and DBE Program requirements. Qualified bidders must possess a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, with bond premiums reimbursed by Kiewit. The solicitation specifically encourages participation from certified DBE, MBE, WBE, and other small business enterprises, requiring evidence of certification from recognized agencies such as the US EPA, SBA, or CA DOT.
Kiewit Infrastructure West Co.

POSTED

about 10 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. Located in Haleiwa, Oahu, Hawaii, the scope of work involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal south of Oahu, vegetation clearance, and repairs to the revetted mole, including stone rework and filling voids. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for small businesses, including SDB, WOSB, HUBZone, VOSB, and SDVOSB concerns, with a specific price evaluation preference for HUBZone small businesses. Bids must be submitted as sealed physical envelopes by September 30, 2026, as electronic submissions are not permitted. Key requirements for a responsive bid include active SAM registration, a bid guarantee, and the submission of SF 1442. The contractor must provide key personnel, including a Project Manager and Site Safety and Health Officer, and adhere to Davis-Bacon Act wage requirements. Acceptance of the dredging work is based on pre- and post-dredge multi-beam hydrographic surveys conducted by a third-party qualified surveyor. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 10 hours ago

DEADLINE

in 25 days
View Details