KCFD HQ Asphalt Replacement

Closed
PR2503956State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in 2 months

DEADLINE

in 2 months

AI Contract Overview

Show more

The contract titled "KCFD HQ Asphalt Replacement" involves the removal and disposal of existing asphalt paving, as specified in detailed scope and site map exhibits provided with the solicitation. Issued by the Kern County GS Construction Services Department in California, this project aims to address asphalt replacement needs at the Kern County Fire Department headquarters. Bidders are required to submit a bid bond equal to 10% of their bid amount. The solicitation was posted on January 22, 2026, with a response deadline of February 13, 2026. The primary contact for this project is Tressie Herrera, who can be reached via email or phone for inquiries. This contract is primarily focused on civil construction and site work related to asphalt removal and replacement, with the scope clearly outlining the removal and disposal tasks. The absence of specific NAICS codes or set-asides suggests that the solicitation is open without preference categories. The finalized project will result in improved site conditions at the KCFD headquarters through proper demolition and paving, enhancing both safety and functionality of the site.

General Info

KCFD HQ Asphalt Replacement contract for asphalt removal, disposal, and repaving, bids due February 13, 2026.

Agency

California → Kern County GS Construction Services Department of Kern CountyView Agency

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

5642 Victor Street, Bakersfield, CA 93308, CA, US

Set-Aside

NONE

Documents

(3)

Project Manual Informal KCFD HQ Asphalt Replacement - PR2503956.pdf

HTML

Pre-bid Sign in sheet_001.pdf

HTML

Scope of Work.docx

HTML

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Contract opportunity posted

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Kern County GS Construction Services Department of Kern County
Contacts1 person available
OfficeCA, US
Organization / Agency
California → Kern County GS Construction Services Department of Kern County
View Agency Profile
Office AddressCA, US
Contacts

Full Description

Show more
Scope: The project, in general, consist of remove and dispose of existing asphalt paving as outlined in the attached exhibit A detailed scope of work and Exhibit B site map
Bid Bond: 10.00%