Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on September 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Kelleys Island Campground Showerhouse Replacement

Closed
https://dam.assets.ohio.gov/image/upload/ofcc.ohio.gov/Project_Opportunities/RFQs/2026/RFQ-DNR-270075.pdfState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Orange County Managed Lanes Segment Advancement Study C265256
Solicitation # C265256
The Orange County Transportation Authority is soliciting professional services for the Orange County Managed Lanes Segment Advancement Study, identified as Agreement No. C265256. The primary objective of this firm fixed price contract is to evaluate existing, planned, and potential managed lane facilities in Orange County to identify up to two priority segments most suitable for advancement into the Project Initiation Document phase. The study is estimated to take 18 months and is budgeted at 350,000 dollars. The scope of work is divided into four primary tasks: project management and coordination, segment inventory and priority selection, priority segment advancement assessment, and the delivery of a final study report with supporting technical files. The selection process is based on identifying the proposal most advantageous to the Authority, with a competitive range and a potential Best and Final Offer phase. Awarded consultants must provide key personnel, maintain comprehensive insurance, and adhere to Level 1 Health, Safety and Environmental Specifications. Administrative requirements include monthly electronic invoicing with a ten percent retention fee, which is released upon final acceptance. The contract is managed by Project Manager Carolyn Mamaradlo and Senior Contracts Administrator Josie Mellen, with all proposals required to be submitted electronically via the OpenGov Procurement portal by November 30, 2026.
Planning-Planning & Analysis

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements
Solicitation # BPM059336
The Town of Port Deposit, in coordination with WILMAPCO, is seeking a multidisciplinary planning and engineering consultant to implement an integrated safety and mobility project for the Susquehanna River Road corridor. The scope of work focuses on establishing a context-sensitive safety strategy using the Safe System Approach, determining safe multi-modal access to the planned Hopkins Quarry Park, and evaluating the feasibility and preliminary design of a shared-use path between Granite Avenue and Octoraro Park. The project aims to produce an actionable 30 percent design and basis-of-design package by June 30, 2027, with the potential for future progression to final Plans, Specifications, and Estimates. This is a qualifications-based selection process where the contract will be awarded to the most qualified firm based on equal weighting of their proposed team and key staff, project approach, and related experience in rural corridor safety and riverfront access. Compensation and detailed scope will be negotiated after the selection of the highest-ranked firm; therefore, no fee or price information should be included in the technical proposal. The project is initially funded by the Wilmington Area Planning Council and the Maryland Department of Transportation Kimberly Lamphier Bikeways Grant Program. Selected consultants must provide proof of financial capacity, a bid affidavit, and professional liability insurance of at least 1,000,000 dollars per occurrence, while adhering to federal civil rights and non-discrimination provisions.
Town of Port Deposit

POSTED

about 12 hours ago

DEADLINE

in 19 days
NAICS: 541330
New
SLED
Engineering and Traffic Surveys Supporting the Town's Speed Limits to Continue Radar Enforcement
Solicitation # 27-004
The Town of Los Gatos, through its Parks and Public Works agency, is soliciting proposals for solicitation number 27-004 to conduct engineering and traffic surveys across 65 designated roadway segments and all existing school zones. The primary objective is to renew the surveys supporting prima facie speed limits to ensure continued legal radar enforcement in compliance with the California Vehicle Code and AB 382. The selected consultant, who must be a California-licensed Professional Engineer qualified in traffic engineering, will perform speed data collection on 31 high-volume segments using radar and 34 low-volume segments using 24-hour mechanical counters. The scope also requires a review of three years of accident history, field checks of each segment, and the delivery of a final engineering report in searchable PDF format containing 85th-percentile speeds and a speed-limit recommendation matrix. The contract is for a one-year term beginning in January 2027 with no option for renewal. Proposers must submit electronic bids by November 27, 2026, and will be evaluated through a two-phase process consisting of a pass/fail responsiveness check followed by a 100-point scoring system based on qualifications, work plan, price, and references. Awardees must maintain significant insurance coverage, including 2 million dollars in general liability, 1 million dollars in automobile liability, and 1 million dollars in professional liability. The agreement includes strict non-discrimination requirements with potential liquidated damages of 100 dollars per day for non-compliance and allows for termination by either party with 15 days written notice. Payment is structured as monthly invoicing with net 30-day terms.
Parks and Public Works

POSTED

about 12 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Ohio Department of Natural Resources is seeking a Registered Design Professional team to provide professional design and construction administration services for the Kelleys Island Campground Showerhouse Replacement project. This initiative is part of an ongoing campground improvement program and involves the construction of a centrally located, ADA-compliant shower house featuring a family restroom and laundry area, the demolition of two existing shower houses, and the potential renovation or replacement of existing campground restrooms. The scope of work includes comprehensive engineering analysis in structural, geotechnical, and hydraulics disciplines, as well as investigations into existing utilities and infrastructure such as water, sewer, storm drainage, electric, and paving. Due to the age of the structures slated for demolition, a hazardous materials assessment is required. The selected firm will be responsible for a full suite of services, including program verification, schematic design, design development, construction document preparation, cost estimating, and permitting. Coordination with multiple regulatory agencies, such as the USACE, USFWS, OEPA, and SHPO, is mandatory. Because the campground must remain operational during construction, the design must ensure existing facilities remain functional, and the firm must account for the logistical constraints of an island location. During the construction phase, the firm is required to provide at least 12 hours of on-site administration services per week. Evaluation for this contract will be based on a best-value selection process considering experience with similar projects, knowledge of Ohio capital improvements, firm size, and previous team collaboration. Participation in the EDGE program is required, and all work must adhere to ODNR design guidelines and applicable national, state, and local accessibility and building codes.

General Info

ODNR seeks design and construction services for Kelleys Island Campground showerhouse replacement.

Place of Performance

Not specified

Set-Aside

NONE

Documents

1

DNR270075 Request for Qualifications – Kelleys Island Campground Showerhouse Replacement

PDF, High priority: read this first5 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio Department of Natural Resources
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Division of EngineeringSubmission Recipient

Full Description

Show more
Project number: DNR-270075
The Ohio Department of Natural Resources (ODNR) manages campgrounds at 76 State Parks, with over 8,970 campsites. This project is a continuation of the ongoing campground improvements that began in 2015. ODNR is seeking professional design services for the design and construction administration required for this project. The design for this project will include investigation and assessments of existing utilities/infrastructure (water, sewer, storm drainage, electric, paving) that will support the planned new building. This assessment will consider the condition of materials, sources of service, capacity, and expansion potential. The Kelleys Island Campground Showerhouse Replacement Project aims to improve several areas of the current campground. Key priorities include constructing a centrally located, ADA-compliant shower house that will feature a family restroom and laundry area, as well as demolishing the two existing shower houses. Additionally, the project will either renovate the existing campground restroom or replace it with a new code-compliant facility as funding allows. The planned approach will reduce the total number of shower house structures on site, simplifying maintenance and cleaning responsibilities for park staff. Public and client use requirements will be defined through the development of a Program of Requirements. ADA accessibility, public appearance, Life Cycle Cost Analysis considerations and the development of potentially multiple creative design concepts will all be incorporated in the design process. Due to the existing buildings being demolished due to their age and condition, a Hazardous Materials Assessment will be included. The Kelleys Island Campground will remain open and operational throughout the duration of construction; therefore, the existing shower houses must remain functional. Furthermore, due to the seasonal constraints on island access, project planning must account for the associated limitations on construction resources and logistics. As scope and associated costs are refined, scope and budget may be added or removed as ODNR initiatives and funding allow. Request for Qualifications (Registered Design Professional*) State of Ohio Standard Forms and Documents
Scope of Services: The selected firm shall apply for and obtain all necessary regulatory permits, maintain current estimates of probable construction costs through the design phase, and provide construction administration services. Permitting and/or coordination with United States Army Corps of Engineers (USACE), United States Fish and Wildlife Service (USFWS), ODNR Dam Safety Program, ODNR Division of Wildlife, Ohio Environmental Protection Agency (OEPA), State Historic Preservation Office (SHPO), and the local floodplain administrators will be required. The selected firm will provide the engineering analysis and calculations needed to advance the design, including structural, geotechnical, and hydraulics engineering. All design and construction shall comply with the current editions of all applicable national, state, and local codes, as well as accessibility standards, including ADA, ICC A117.1, and the ABA Outdoor Developed Areas Guidelines. The Ohio Department of Natural Resources Division of Engineering has developed a set of design guidelines for construction projects. It is expected that all architects, engineers, consultants, and contractors will be familiar with these design guidelines which will serve as the preference for all construction projects when developing final project specifications. A complete set of current guidelines are available at Design Guidelines for Construction Projects | Ohio Department of Natural Resources. (https://ohiodnr.gov/business-and-industry/services-to-business-industry/design-guidelines-all). The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the A/E Agreement detailed cost components to address the Owner’s project requirements. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, develop & maintain estimates of probable construction cost, value engineering, project schedules & construction schedules, Life Cycle Cost Analysis (LCCA) reports, GIS As-built deliverables Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov. During the construction period, provide not less than 12 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Experience with similar scope (campground operation facilities). 2. Experience with environmental permitting and cultural resources assessment services. 3. Ability to manage design and construction projects in an occupied State Park setting. 4. Experience with public facing and architecturally unique building design concepts. 5. Experience planning and managing projects where access and material availability are limited (e.g., island locations). 6. Ability to design project scope within budget in current market conditions with regional cost factors. 7. Experience coordinating architectural design with multidisciplinary engineering teams to address complex utility, environmental, and site infrastructure challenges. 8. Experience managing the State of Ohio contract documents and OAKS CI. 9. Experience with ODNR Capital improvement projects. 10. Experience developing public use facilities able to endure inherent heavy wear and demanding conditions.

More opportunities from Ohio Department of Natural Resources

Same awarding agency

NAICS: 541620
New
SLED
Statewide Environmental Review FYs 2027-2029
Solicitation # DNR-27REALM01
The Ohio Department of Natural Resources Office of Real Estate and Land Management is seeking professional environmental consulting services to provide technical expertise and staff augmentation for its Environmental Services Section. The selected consultant will support environmental review and coordination for transportation projects, permit reviews, conservation initiatives, utility siting, and other development projects across Ohio. Key responsibilities include processing approximately 2,000 project reviews annually with a strict 30-calendar-day turnaround for Environmental Review letters, conducting quality assurance and quality control, and providing technical training and guidance. The scope emphasizes compliance with the National Environmental Policy Act (NEPA), ecological assessments, GIS support, and coordination with state and federal agencies. The contract is scheduled to run from approximately January 2027 through June 2029, with planned amendments in June 2027 and June 2028 contingent upon available funding. Performance may occur remotely, at the Fountain Square Complex in Columbus, or at various project sites throughout the state. Evaluation for award is based on a weighted scoring system focusing on firm location, workload, size, and the qualifications of the primary project team and sub-consultants. Applicants must submit a Statement of Qualifications using Form F110-330, and the selected firm will be required to maintain and operate a state-issued laptop to facilitate these services.
Environmental Consulting Services

POSTED

5 days ago

DEADLINE

in 9 days
View Details
NAICS: 541330
SLED
Geneva State Park Campground Stormwater & Site Improvements
Solicitation # DNR270074
The Ohio Department of Natural Resources is seeking professional engineering services for project DNR-270074 to implement stormwater and site improvements at Geneva State Park. The project aims to resolve chronic flooding and poor drainage within the campground by replacing the existing 1979 infiltration system with a modern combination of storm sewers and underdrains. Key design objectives include extending the system along Road D, adding catch basins, improving infiltration trench designs to prevent clogging, and ensuring proper ditch grading at outlets while avoiding existing electric and sanitary utilities. The total project cost is estimated at 2,679,000 dollars, with construction costs estimated at 2,310,000 dollars and a basic fee range between 6 percent and 10 percent. The selected firm will be responsible for the full project lifecycle, including program verification, schematic design, construction documents, and bid support. Required technical services encompass topographic and boundary surveying, geotechnical engineering, and ecological and cultural resource assessments. The firm must also manage all regulatory permitting with agencies such as the USACE, USFWS, and OEPA. During construction, the firm is required to provide at least 16 hours of on-site administration per week. Evaluation of applicants will be based on firm location, workload, size, and the qualifications of the primary firm and its consultants. Additionally, the project requires participation in the EDGE program and adherence to state prevailing wage standards. The anticipated professional services period begins in February 2027, with substantial completion of all work expected by December 2028.
Engineering Services

POSTED

15 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS