Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Kelseyville Senior Center Renovation Project (PL-26-411)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Lake County

NAICS

N/A

Place of Performance

Saderlund st; Third St, CA, 95451

Set-Aside

NONE

Documents

(1)

Recorded NOE KVL PL-25-411

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Lake County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Lake County
Office AddressN/A
Contacts
Michelle IraceSenior Planner
Joe CooperCapital Project Manager

Full Description

Show more
BACKGROUND: The Kelseyville Senior Center is a facility that is owned by the County of Lake but operated by Kelseyville Seniors, Inc., and provides a number of services to residents in the area, including but not limited to: meals, social events, art and music classes, exercise and movement classes, as well as public meeting spaces. As a part of its efforts to become a climate resilient community, the County of Lake is investing in the facility to become a Community Resource Center in the event of extreme heat events and power outages. DESCRIPTION OF PROJECT: The Lake County Public Works Department proposes to remodel the existing Kelseyville Senior Center building, located at 5245 Third Street, Kelseyville. The County has received grant funding from the CA Department of Housing and Community Development (HCD) under the Mitigation Resilient Infrastructure Program (MIT-RIP), which comes from the U.S. Department of Housing and Urban Development (HUD) to improve the facility. As a part of its efforts to become a climate resilient community, the County is investing in the facility to become a Community Resource Center in the event of extreme heat events and power outages. Proposed improvements include: • Renovation of approximately 2,163 square feet of the existing senior event center building, including a commercial kitchen upgrade. • New construction of a 435 square foot entry vestibule and office addition (within the existing footprint of the facility and roof). • Façade improvements including new exterior elevations for the North, South, East, and West building faces, and a new entry vestibule with exterior doors, windows, and framing. • Roof replacement over the renovated area, including new roof trusses. • ADA improvements including accessible counters, restrooms, parking reconfiguration, rolled curb and gutter installation, new storm drain infrastructure, sidewalk improvements, and pavement overlay. • Landscaping totaling 30 square feet, subject to the State’s Model Water Efficient Landscape Ordinance (MWELO) documentation requirements. • Electric power generator to accommodate health equipment such as oxygen, continuous positive airway pressure (CPAP) machines, respirators, power wheelchairs, and refrigerators for insulin, during power outage events. Construction. Construction would take approximately five to eight months and would be in seven phases. All construction activities would be within existing paved areas, parking lots and road/right-of-way. Equipment and materials staging would occur within the existing paved parking lot areas. A total of 25 construction workers are anticipated to complete the work. Hours of construction would be Monday through Friday, from 7:00 a.m. to 7:00 p.m. Construction would occur during the dry season and standard stormwater and erosion control Best Management Practices (BMPs), such as hay waddles and silt fencing, would be deployed as needed. No trees or vegetation would be removed. NEPA. Because the grant funding for the project comes from the U.S. Department of Housing and Urban Development (HUD) environmental review under the National Environmental Policy Act (NEPA) is required. In accordance with NEPA, a Categorical Exclusion per 24 CFR §58.5(a)(1), which includes acquisition, repair, improvement, reconstruction, or rehabilitation of public facilities and improvements, has been approved by HCD/HUD, for the project. For informational purposes, the NEPA documentation is included in Attachment 4. No action by the Planning Commission is required pertaining to NEPA.