Kelseyville Senior Center Renovation Project (PL-26-411)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Kelseyville Senior Center Renovation Project at 5245 Third Street, Kelseyville, California, is a climate resilience initiative funded through the California Department of Housing and Community Development’s Mitigation Resilient Infrastructure Program, which derives federal support from the U.S. Department of Housing and Urban Development. The project aims to transform the existing facility into a Community Resource Center capable of serving residents during extreme heat events and power outages by upgrading its infrastructure for enhanced functionality and accessibility. Work includes the renovation of approximately 2,163 square feet of the current building with a commercial kitchen upgrade, the addition of a 435-square-foot entry vestibule and office within the existing footprint, full façade improvements across all sides of the building, replacement of the roof including new trusses, and comprehensive ADA compliance enhancements such as accessible restrooms, parking reconfiguration, rolled curbs, new storm drains, sidewalk improvements, and pavement overlay. A backup electric power generator will be installed to sustain critical medical devices like oxygen concentrators, CPAP machines, respirators, power wheelchairs, and insulin refrigerators during grid failures. Landscaping will be limited to 30 square feet and designed in full compliance with the State’s Model Water Efficient Landscape Ordinance, with no trees or vegetation to be removed. Construction is anticipated to last between five and eight months, executed in seven phases during the dry season with work hours restricted to 7:00 a.m. to 7:00 p.m., Monday through Friday. All activities are confined to existing paved areas, parking lots, and rights-of-way, with no new land clearing or vegetation disturbance planned. Stormwater and erosion control will be managed using standard Best Management Practices including hay waddles and silt fencing. The project has received federal and state environmental approvals: a NEPA Categorical Exclusion under 24 CFR §58.5(a)(1) and a CEQA Class 1(e)(1) exemption, both confirming negligible environmental impact. Tribal consultation was completed with no adverse findings. The County of Lake Public Works Department leads the project, with primary oversight from Michelle Irace, Senior Planner, and Joe Cooper, Capital Project Manager. No formal contract line items, pricing details, or FAR clauses are included in the public documentation, indicating this is a planning or forecast document in advance of procurement. Inspection and acceptance will occur on-site at the facility, with compliance enforced under ADA standards, MWELO, and applicable construction BMPs.
General Info
Agency
NAICS
Place of Performance
Saderlund st; Third St, CA, 95451Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
