Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

King Ridge Road Bridge Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Sonoma County is undertaking the replacement of the deficient one-lane bridge on King Ridge Road crossing Austin Creek, located north of Cazadero, California, with a new two-lane bridge constructed on a new alignment immediately upstream of the existing structure. The project will be completed over two construction seasons, with the new bridge and associated road realignment finished in the first season and the removal of the old bridge deferred to the second season, ensuring continuous traffic flow on the existing bridge throughout construction. The work is strictly limited to daytime hours, between 7 AM and 7 PM, to minimize disruption. All construction activities must comply with stringent environmental regulations to protect sensitive aquatic habitats, particularly salmonid species, and riparian zones, including adherence to seasonal work restrictions, such as prohibiting work near waterways from June 15 to October 15. Comprehensive mitigation measures are required, including a 2:1 wetland mitigation ratio achieved through native, weed-free vegetation restoration, installation of exclusionary fencing, silt fencing, and erosion controls, and strict adherence to Caltrans and AASHTO standards for bridge design and seismic resilience. Hazardous materials must be stored and handled at least 100 feet from waterways, with onsite spill cleanup kits and containment berms mandated, and all fueling operations must be conducted with daily equipment inspections to prevent leaks. The project is subject to federal and state environmental permits under the Clean Water Act, the California Endangered Species Act, and federal Endangered Species Act requirements, with formal coordination ongoing with NOAA Fisheries and the U.S. Fish and Wildlife Service for impacts to salmonids and the northern spotted owl. No net increase in greenhouse gas emissions, noise, or traffic is permitted, and all topsoil and backfill piles must be clearly marked and segregated on-site. The contractor is responsible for full compliance with these environmental mitigation conditions, which are enforced through the Sonoma County Permit and Resource Management Department, known as Permit Sonoma. No contract value, pricing, payment, or invoicing details are provided, and no traditional federal acquisition clauses or contract types are specified, as the documentation reflects a locally managed, environmentally driven project rather than a formal federal procurement. The primary point of contact for the project is David Walsh, Senior Environmental Specialist at Permit Sonoma, who oversees compliance and regulatory coordination.

General Info

Replace one-lane bridge with two-lane structure on new alignment, strict environmental protections, seasonal restrictions, and daylight-only construction.

Agency

California → Sonoma County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

King Ridge Road, Sonoma, CA

Set-Aside

NONE

Documents

(4)

King Ridge Rd Bridge Project MND Notice of Intent

PDFspecial-notice

King Ridge Road Bridge Replacement Project Initial Study and Negative Declaration

PDFenvironmental-review

King Ridge Road Bridge Replacement Project Notice of Completion

PDFnotice-of-completion

King Ridge Road Bridge Replacement Project Summary Form

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sonoma County
Office AddressN/A
Contacts
David WalshSenior Environmental Specialist

Full Description

Show more
SPI proposes to replace the existing bridge on King Ridge Road crossing Austin Creek, to the north of the town of Cazadero CA. The proposed project consists of removing the existing deficient one-lane bridge and replacing it with a new two-lane bridge and then removing the existing bridge. The new bridge will be constructed on a new road alignment just upstream of the existing bridge. Traffic will remain on the existing bridge and road alignment during the new bridge construction and then moved to the new bridge after it is completed. The existing bridge will then be removed. The overall project will take two construction seasons, with the new bridge and road realignment completed in the first construction season and the existing bridge removal completed in the second construction season.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 19 hours ago

DEADLINE

in 24 days
View Details