This Solicitation opportunity from Missouri was posted on July 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The University of Central Missouri is soliciting bids for the KMOS Tower Elevator Cable Replacement project, identified as solicitation number 25-011. The project involves replacing cables for a special purpose personnel hydraulic elevator installed in 2002 at the KMOS Tower located in Syracuse, Missouri. Bids must be submitted exclusively through the Ionwave eBidding system by August 2, 2024, at 5:00 PM. A pre-bid meeting was scheduled for July 24, 2024, at the tower site. All communications regarding the procurement process must be directed to the primary point of contact, Robert Walla, to avoid disqualification.
Qualified vendors are required to provide bid and performance bonds, certificates of insurance meeting specific university construction standards, and a completed contractor qualifications form. The contract mandates strict adherence to Missouri prevailing wage laws and university safety practices. For projects valued at $100,000 or more, bidders must submit MBE/WBE compliance documentation, including eligibility determinations or waiver applications if participation goals are not met. Additionally, contractors must provide a notarized affidavit of work authorization confirming enrollment in a federal work authorization program. Award decisions will be made following a comprehensive review of each bid for responsiveness and responsibility.
General Info
Bids for KMOS Tower elevator cable replacement due August 2, 2024 via Ionwave.
HighAI Summary for Invitation for Bid 25-011 KMOS Tower Elevator Cable Replacement: This Invitation for Bid (IFB) 25-011, issued on 7/16/2024, solicits bids for the KMOS Tower Elevator Cable Replacement project. The response deadline is 8/2/2024 at 12:00 PM CT. A pre-bid meeting is scheduled for July 24, 2024, at 3:00 PM at the KMOS Tower site in Syracuse, MO. Bids must be submitted via the UCM eBidding system only. The document includes contact information for procurement and billing, bid activities, required attachments such as bid bond, certificate of insurance, affidavits, and MBE/WBE forms, as well as general and safety specifications. Vendors must comply with prevailing wage laws and construction insurance requirements. The bid submission must remain valid for 90 days after opening, and various acknowledgments and certifications are required from bidders. The IFB emphasizes communication protocols and evaluation criteria for award consideration.
PDF
PDF, High priority: read this firstifb
HighAI Summary for KMOS Tower Elevator Cable Replacement General Specifications: This document is the General Specifications for the KMOS Television Tower Elevator Cable Replacement project issued by the University of Central Missouri. It outlines the bidding requirements, scope of work, contract terms, insurance, qualifications, and site restoration instructions. The document includes details on bid submission, vendor responsibilities, payment terms, and compliance with prevailing wage and MBE/WBE requirements. A prebid meeting is scheduled, and vendors must provide bid and performance bonds. The document serves as an Invitation for Bid (IFB) for qualified vendors to submit bids for the elevator cable replacement services at the specified tower location.
PDF
PDF, High priority: read this firststructural-design-report
HighAI Summary for KMOS-TV 2000 Ft. Guyed Tower Structural Design and Analysis Report: This document is the Structural Design and Analysis Report for the KMOS-TV 2000 Ft. Guyed Tower located in Tipton, Missouri, prepared by URS Greiner Telecommunications for ROHN. Dated March 30, 2000 (Revision 1), it summarizes the structural analysis and design methodology in accordance with TIA/EIA-222-F standards. The report includes design parameters such as steel material specifications, foundation reactions, and loading conditions including wind and antenna loads. It details the computer analysis methodology, input data, and output results for tower stability under various wind directions and conditions, including wind speeds of 70 mph without ice and 61 mph with ice. The document also contains detailed wind pressure tables and foundation design considerations based on soil parameters.
PDF
PDF, High priority: read this first2 pages · application-for-waiver
HighAI Summary for MBE-WBE Application for Waiver Form: This document is the MBE/WBE Application for Waiver Form used for projects of $100,000 or more. It is submitted by bidders who fail to meet the Minority Business Enterprise (MBE) or Women Business Enterprise (WBE) participation goals. The form requires detailed information about the bidder's good faith efforts to include MBE/WBE subcontractors, including attendance at pre-bid conferences, advertising efforts, contacts with MBE/WBEs, negotiation attempts, and reasons for rejection of MBE/WBEs. The form also includes certification by the general contractor that the information provided is true and correct. This form is critical for evaluating compliance with MBE/WBE participation requirements and requesting a waiver of the set goals.
PDF
PDF, High priority: read this first15 pages · wage-determination
HighAI Summary for Prevailing Wage Law Rules - Missouri Department of Labor: This document contains the Prevailing Wage Law Rules from the Missouri Department of Labor and Industrial Relations, Division 30, Chapter 3. It outlines the prevailing wage requirements for workers on publicly funded construction projects in Missouri. The rules specify the process for obtaining annual wage orders, the necessity of incorporating these wage rates into contract specifications, and the responsibilities of public bodies and contractors regarding payroll submissions and compliance inspections. The document includes definitions relevant to wage determinations and references legal authority and amendments up to 2016. It serves as a regulatory guide to ensure contractors pay at least the minimum prevailing wages as determined by the department.
PDF
PDF, High priority: read this first2 pages · insurance-requirements
HighAI Summary for UCM Construction Contract Insurance Requirements Revised 08-10-2022: This document outlines the insurance requirements for contractors working on construction contracts for the University of Central Missouri (UCM), revised on August 10, 2022. It specifies the types and minimum amounts of insurance coverage contractors must maintain, including Workmen's Compensation, Public Liability and Property Damage, Owner's Protective Liability, and Builder's Risk or Installation Floater Insurance. The document details coverage for special hazards, certification requirements, and conditions for maintaining insurance throughout the contract duration. Contractors must provide certificates of insurance within ten days of contract receipt and maintain coverage without interruption to avoid work delays or bid rejection.
PDF
PDF, Low priority1 page · affidavit
LowAI Summary for Affidavit of Work Authorization for University of Central Missouri: This document is an Affidavit of Work Authorization related to services for the University of Central Missouri. It affirms that the contractor and their personnel are enrolled in and will comply with a federal work authorization program, specifically referencing RSMo Chapter 285.530 (2). The affidavit includes a sworn statement by a contractor representative and a notary public section. It also references the E-Verify federal work authorization program for verification purposes.
PDF
PDF, Low priority2 pages · other
LowAI Summary for Contractor's Qualifications Form: This document is a Contractor's Qualifications form used to collect detailed information about a construction firm. It includes sections for firm name, address, contact information, construction capabilities, corporate or partnership details, general business information, and history of project completions and litigation. The form also requests lists of completed and current projects similar in scope to the one being bid, including project costs and owner contact details. The document serves as a background and capability statement for contractors but does not contain solicitation or contract-specific instructions.
PDF
PDF, Low priorityinspection-report
LowAI Summary for KMOS Elevator Annual Inspection Report 10-17-2022: This document is an elevator inspection report dated October 17, 2022, for the KMOS Syracuse Tower located at 10391 Olive Branch Rd, Syracuse, MO. The inspection was conducted by General Elevator with mechanic Kyle Ritchhart. The elevator, manufactured by Marshall Elevator in 2002, is a passenger hydraulic type with a capacity of 750 and speed of 100. The report indicates it is an annual inspection and a 5-year test was also performed on the same date. No violations were found during the inspection. The document includes owner and billing information for the University of Central Missouri and details about the elevator's specifications and inspection results.
PDF
PDF, Low prioritystructural-analysis-report
LowAI Summary for KMOS Tower Structural Analysis Report 10-2021: This document is a structural analysis report for the 1930.5' guyed tower located in Tipton, MO, prepared by Elevated Structural Engineers, LLC and dated October 2021. It evaluates the tower's capacity to support existing and proposed antenna loading changes according to TIA-222-H code with a reduced design ice thickness of 1.375 inches. The report includes details on tower geometry, antenna configurations, optimum guy tensions, and foundation reaction comparisons. The analysis was performed using tnxTower software version 8.1.1.0. The conclusion states the tower meets the code requirements under the specified conditions.
LowAI Summary for MBE-WBE Compliance Evaluation Form for Projects $100,000 or More: This MBE/WBE Compliance Evaluation Form is to be completed by bidders and submitted with bid proposals for projects valued at $100,000 or more. It collects data on minority/woman-owned business participation, including firm details, subcontract work description, contract dollar amounts, and certification status. The form ensures bidders meet MBE/WBE participation goals and includes sections for base bid and alternate work, certification verification, and signatures from the general contractor. It supports compliance with minority and women business enterprise requirements.
LowAI Summary for MBE-WBE Eligibility Determination Form: This document is the MBE/WBE Eligibility Determination Form used for projects of $100,000 or more. It collects detailed information about a firm's ownership, control, business nature, years in business, gross receipts, bonding, and certification history related to minority and women-owned business enterprise status. The form includes sections for identifying owners with 5% or more ownership, their contributions, management control, and any business relationships affecting ownership. It requires a sworn affidavit and notarization to certify the accuracy of the information provided. The form is intended to verify eligibility for MBE/WBE certification and ensure compliance with related regulations.
LowAI Summary for MBE-WBE Eligibility Determination Form for Joint Ventures: This document is the MBE/WBE Eligibility Determination Form for Joint Ventures for projects of $100,000 or more. It is used to determine the minority/woman-owned business status of joint ventures, including details about the joint venture's name, address, phone, and the firms involved. The form requires descriptions of the roles, experience, ownership percentages, profit and loss sharing, capital contributions, and management responsibilities. It includes affidavits to be signed and notarized, affirming the accuracy of the information and agreement to provide updates and allow audits. The form is intended to ensure compliance with MBE/WBE participation requirements in contracts.
PDF
PDF, Low prioritycertificate
LowAI Summary for Missouri Elevator State Operating Certificate 2023-2024 KMOS: This document is the Missouri Department of Public Safety Division of Fire Safety's State Operating Certificate for elevator equipment at KMOS Syracuse Tower, issued on October 2, 2023, and valid until September 14, 2024. It certifies that the elevator, a Special Purpose Personnel Elevator installed in 2002 by Marshall Elevator, meets the safety standards prescribed by ASME A17.1, ANSI A90.1, ANSI A10.4, and Missouri Elevator Safety Rules and Regulations. The certificate includes inspection details from September 15, 2023, and instructions for posting the certificate in the elevator machine room. No variances were noted.
PDF
PDF, Low priority1 page · other
LowAI Summary for University of Central Missouri Safety Practices Ver 1 Nov 2016: This document outlines the University of Central Missouri's Safety Practices for construction and contractor work areas as of November 2016. It specifies minimum safety requirements including fencing around hazardous work areas, optional barriers for inside work, adherence to federal and state traffic regulations such as MUTCD, management of noxious fumes, and dust control methods for concrete work. The document emphasizes the university's commitment to a safe and healthy working environment and notes that additional safety requirements may be imposed depending on conditions.
JPG
JPG
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
** BIDS ACCEPTED TEM ONLY **
A Prebid Meeting will be held at the KMOS Tower near Syracuse, MO on July 24 at 3:00pm. Any and all communication from bidders regarding specifications, requirements, competitive procurement process, etc., must be directed to the buyer as indicated in the Bid Contact Information section. Communication made with parties outside of Procurement may result in your solicitation response being disqualified;
UCM bids are secured by Ionwave until the closing date and time. Bid pricing is available for viewing when the bid is unsealed. To access bid pricing after the bid is unsealed, go to the UCM eBid system (Ionwave), click Closed Bids, the bid number, Bid Tabulation by Supplier. Note: Pending any award, the bid is reviewed and evaluated for responsiveness and responsibility. No award will be made until the evaluation and review is complete by UCM.