Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on August 10, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Kootenai National Forest Trailhead Construction

Awarded
AG-82B1-S-10-0375Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Three Lakes G111 Replacement
Solicitation # FWC 26/27-10C
The Florida Fish and Wildlife Conservation Commission is soliciting competitive lump-sum pricing for the Three Lakes G111 Replacement project in Osceola County, Florida. The scope of work involves replacing an existing five-barrel CMP culvert structure and control gates with a new cast-in-place five-barrel reinforced concrete box culvert structure. Key deliverables include the installation of reinforced concrete headwalls and rip-rap blankets both upstream and downstream, as well as the implementation of a temporary steel sheetpile cofferdam and dewatering system to facilitate construction in dry conditions. The estimated budget for this project is 3.5 million dollars. Bidders must be registered in the MyFloridaMarketPlace and SunBiz systems and submit sealed bids by October 13, 2026, at 4:00 PM ET. Requirements for the award include a bid bond of at least five percent for bids exceeding 100,000 dollars, and the successful contractor must provide 100 percent performance and labor and material payment bonds. Additionally, contractors must hold a current State Contractor license, provide a Unique Entity Identifier, and ensure compliance with the Build America, Buy America provision and Chapter 255 of the Florida Statutes. Work is generally restricted to weekdays between 7:00 AM and 7:00 PM, and final completion is defined as 30 days after the issuance of a Certificate of Substantial Completion.
Florida Fish and Wildlife Conservation Commission

POSTED

about 1 hour ago

DEADLINE

in 3 days
NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project involves designing and constructing manholes, estimated to be between 10 and 25 feet deep, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal through-seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques in accordance with USACE Engineering Regulation 1110-1-1807. Key deliverables include a professional engineer-approved Drilling and Invasive Program Plan, temporary flood protection plans, and final as-built drawings. This is a two-phase selection process, with Phase 1 focusing exclusively on qualifications and technical approach without the submission of pricing. The government intends to select up to three qualified offerors for Phase 2, evaluating candidates based on performance confidence and technical qualifications, with non-price factors weighted significantly more than price. The project is categorized under NAICS code 237990 with a small business size standard of 45 million dollars. While the estimated project magnitude is between 1 million and 5 million dollars, the total contract award amount, including both design and construction, shall not exceed 3.4 million dollars. The final award will be a firm-fixed-price contract requiring 100 percent performance and payment bonds.
W071 Endist Kansas City

POSTED

about 5 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. Managed by the US Army Corps of Engineers New York District with the New Jersey Department of Environmental Protection as the non-Federal sponsor, the project focuses on reducing storm damages from coastal erosion and flooding. The scope of work involves the design and construction of two wetland mitigation sites: the Pews Creek freshwater wetland and the Compton Creek tidal wetland. Key deliverables include the restoration of approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands, with a specific performance requirement of achieving 85 percent aerial coverage of plantings in freshwater forested areas within three to five years post-construction. The project magnitude is estimated between 15 million and 30 million dollars, and the government will award a firm fixed-price contract based on a best-value tradeoff. The selection process is conducted in two phases per FAR 36.3; Phase One qualifies offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Phase Two evaluations consider technical approach, management, and a small business participation plan, which combined are approximately equal in importance to price. Proposals for Phase One were due by October 19, 2026. The contract requires strict adherence to NJDEP hazardous waste standards, Davis-Bacon Act labor regulations, and specific electronic data delivery formats.
W2SD Endist New York

POSTED

about 5 hours ago

DEADLINE

in 1 day
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 5 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 10 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

This project involves the construction of six trailheads in the northwest corner of Montana, specifically at Swisher Lake, Blacktail, Foundation Camp, Krinklehorn, Deep Creek, and Sunday Falls. The scope of work includes surveying, clearing and grubbing, excavation, culvert installation, recreation structure installation, minor aggregate courses, and seeding. There are three additive bid items for road work at Swisher Trailhead and the reconstruction of the Blacktail and Deep Creek Trailheads, which will be awarded based on funding availability. Offered under the American Recovery and Reinvestment Act, this 100 percent small business set-aside contract is estimated to cost less than 100,000 dollars. Work was scheduled to begin around August 1, 2010, with a completion deadline of July 1, 2011. Key requirements include a payment bond, adherence to Davis Bacon wage rates, and registration in the Central Contractor Registration database. The awardee is also required to report the use of Recovery Funds to the public.

General Info

Contract Value

$74,393.01

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

See Description, DC, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Deadline changed

Response deadline changed from Jun 7, 2010 to Jun 29, 2010.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service-Spoc Im
Contacts2 people available
OfficeWashington, DC, 202500001, USA
Office AddressWashington, DC, 202500001, USA
Contacts
Carolyn J LippireSupervisory Contract Specialist

Full Description

Show more
THIS CONTRACTING ACTION IS BEING OFFERED UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT. (a) - Description of Work. Construct 6 Trailheads as shown in the plans and described in the specifications. Work includes Surveying, Clearing and Grubbing Excavation, minor aggregate courses, culvert installation, recreation structure installation and seeding. There are three additive bid items; road work at Swisher Trailhead, and reconstruction of Blacktail and Deep Creek Trailheads. The additive items will be awarded as funding is available. (b) - Project Locations. 1. Swisher Lake Trailhead is located in the north west corner of Montana, identified as Township 37 North, Range 27 West, Section 21. 2. Blacktail Trailhead is located in the north west corner of Montana, identified as Township 37 North, Range 26 West, Section 5. 3. Foundation Camp Trailhead is located in the north west corner of Montana, identified as Township 37 North, Range 24 West, Section 30. 4. Krinklehorn Trailhead is located in the north west corner of Montana, identified as Township 36 North, Range 25 West, Section 27. 5. Deep Creek Trailhead is located in the north west corner of Montana, identified as Township 37 North, Range 25 West, Section 30. 6. Sunday Falls Trailhead is located in the north west corner of Montana, identified as Township 33 North, Range 24 West, Section 18. No formal pre-proposal site visit will be conducted but offerors are encouraged to visit the site. Offerors are also encouraged to review Federal Acquisition Regulation (FAR) provision 52.237-1, Site Visit (Apr 1984). Failure of the Contractor to ascertain the nature, location, and conditions which affect the work will not relieve the contractor from the responsibility for successfully performing the work without additional expense to the Government. For additional information regarding the site, contact Chuck Gondeior at 406-296-7115. Payment bond will be required. Davis Bacon wage rates will apply. It is estimated that work will begin around August 1, 2010. All work must be completed by July 1, 2011. The project cost estimate at less than $100,000. Safety & Camping. If the Contractor anticipates camping within or adjacent to the project area, it shall obtain and comply with the requirements of a District Camping Permit. All responsible small businesses may submit a proposal which will be considered by the Government. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor Registration (CCR) database prior to award of a contract. Lack of registration in the CCR on part of the offeror will render a proposal ineligible for award. Offerors may obtain information on registration and annual confirmation requirements by calling 888-227-2423 or via the Internet at http://www.ccr.gov//. The solicitation package is anticipated to be available electronically on or about May 18, 2010 with an anticipated closing date of June 7, 2010. NOTE: THIS PRE-SOLICITATION HAS A DUE DATE THAT IS FOR PLANNING PURPOSES ONLY. THE OFFICIAL DUE DATE WILL BE INDICATED IN THE REQUEST FOR PROPOSAL. ARRA Requirement: The Awardee will be subject to Section 1512(c) of the American Recovery and Reinvestment Act which requires each contractor to report on its use of Recovery Funds under the awarded contract. These reports will be made available to the public. PLEASE DO NOT CONTACT THE GOVERNMENT PRIOR TO SEEING AND REVIEWING THE REQUEST FOR PROPOSAL. Other pertinent information: NAICS: 237990 - Trail construction Size Standard: $33.5M 100% Small Business Set Aside FP-03 - Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract. FSC: F999 Other Environmental Services/Studies/Supplies Solicitation number: AG-82B1-S-10-0375

More opportunities from Department Of Agriculture → USDA Forest Service-Spoc Im

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS