Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

KSU-27S036

Open
State & Local
Response DeadlineDue in 48 days
Solicitation #
50109

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Summit Street Power Plant Cooling Tower Replacement project involves the design of a system to replace four original cross-flow cooling towers that have reached the end of their useful life. The new stainless steel cross-flow towers will be installed at the existing locations and must provide increased heat rejection capacity, supporting a maximum flow of 3,500 gpm per cell. Key technical requirements include full winterization with EM-powered heat trace, the installation of basin sweeper separators and pumps, and the modification of bypass and equalizer piping to improve cold basin level maintenance and prevent stagnant water. The project scope includes upgrading the BAS control systems with digital water level sensors, solenoid valves, and actuated manual valves to allow for automatic operation. Additionally, the existing fan VFDs and the 800A distribution panel will be replaced. Work will be performed during winter months, requiring the contractor to coordinate with Kent State University personnel to ensure the continued operation of the power plant and remaining cooling equipment. This solicitation is currently limited to design-only funding.

General Info

Design for replacing four cooling towers with upgraded capacity and BAS control systems.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → Kent State University - Office of the University Architect
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Summit Street Power Plant Cooling Tower Replacement
The existing Summit Street Power Plant (SPP) cross-flow cooling towers 1 through 4 are original to the construction of SPP in approximately 2001.They are at the end of their useful life and need to be replaced as detailed below. Project funding is limited to design-only at this time. The design efforts will inform the necessary construction budget with the intent of funding through critical deferred maintenance funds.
The existing cross-flow cooling towers 1 through 4 serve two (2) dual-compressor electric centrifugal chillers of the same vintage. Each existing chiller is rated at 2,000 tons. The cooling towers (CT-1, 2, 3, and 4) are no longer providing adequate heat rejection capacity during hot and humid weather and high cooling load conditions. These cooling towers are also not winterized, and must be drained during cold weather; this causes undesirable operating parameters for research areas and process loads in buildings served by this chilled water system. The existing cooling towers, electric chillers, and the steam turbine chiller and towers at SPP are all controlled through KSU’s Johnson Controls BAS, with optimization through JCI’s Central Plant Optimization / EOS / OpenBlue software and team.
The new cooling towers (CT-1/2/3/4) will be located at the same physical location within the plant, with modifications provided to the existing steel support structure (both dunnage steel under the towers and columns to the building steel structure, as required) and all make-up, equalizer, TWS, and TWR piping below the towers to accommodate the new cooling towers. New cooling towers shall be cross-flow type, with all-stainless steel construction (structure, hot and cold basins/covers, fan deck) with velocity recovery outlet cones, hot deck railings, access ladders, anti-vortex cold basin outlet, and basin sweepers and dedicated piping connections. New cooling towers shall be sized to provide heat rejection capacity above the design values of the existing towers; towers shall be capable of a maximum flow of 3,500 gpm per cell cooled from 95°F EWT to 85°F LWT with an 80°F EWB. New basin sweeper separators and pumps shall be provided at the SPP Lower Level near the existing sidestream filtration equipment. Dedicated piping between the new basin sweepers and the separators/pumps shall be routed through the main plant floor and coordinated with KSU SPP personnel during design. Two (2) sweeper systems shall be provided, with one system per pair of towers (CT-1+2 and CT-3+4). Shell and tube heat exchangers (steam in tubes, tower water reverse-piped in shell) shall be provided in sweeper system discharge piping to provide freeze protection at the cooling tower cold basins.
The new cooling towers shall be fully winterized. EM-powered heat trace and insulation and jacket shall be provided for all exterior piping and shall extend at least 24” into the building interior, and heat trace shall be controlled using the existing SPP heat trace control system. Cooling tower fans and VFDs shall be capable of reversing air flow when signaled by the BAS. Cold basins shall be heated using the basin sweeper system heat exchangers; note that this requires the use of EM power for basin sweeper equipment. Automatic 2-position valves shall be used to drain the TWR piping up to the hot water basins into the equalizer or cold water basin and tower-specific make-up piping when towers are disabled.
Cooling tower bypass piping shall be modified as required to provide improved and more complete bypass during cold weather operation of the operating chillers. Existing cooling tower bypass piping and control occurs within the plant, and does not return water discharged from the chillers’ condensers to the cold basin of the cooling towers. When full tower bypass occurs, water is stagnant in the cold basins, TWS/TWR piping, and equalizer piping. It is desired under this project to return the warmer water discharged from the chillers to the cold water basins through the equalizer piping. Existing equalizer piping appears to be under-sized, and uneven cold basin water levels have been observed by KSU plant personnel during tower operations. Equalizer piping shall be analyzed and replaced to provide improved cold basin level maintenance.
Make-up water piping to each cooling tower shall be controlled through the BAS using a digital water level sensor (5 probes, 4 level indications) and a solenoid type control valve. All make-up water piping shall be heat traced from existing piping to the cooling tower cold basin connections. Manual 1” ball valves with hose thread adapters shall be provided at the makeup piping below the new towers for intermittent cleaning of the towers and other roof mounted equipment.
Each cooling tower shall be provided with individual TWR/TWS control valves at the hot water inlet to the tower and the cold water outlet from the tower. Manual valves shall be provided at the hot inlet, cold outlet, equalizer, make-up, cold basin drain, and basin sweeper piping connections at each tower cell. Existing TWR, TWS, and equalizer headers under all 6 cooling towers are capable of cross-connection so all towers can serve all chillers. Under this project, these manual valves shall have actuators added to permit automatic actuation of these valves.
Existing cooling tower fan VFDs are located in the SPP lower level electrical room. New cooling tower VFDs and load/line-side reactors will be located in place of the current tower fan VFDs. The existing 800A 480/3 CHPMCC-5 with one VFD providing power to CT-1/2/3/4 shall be replaced with a distribution panel with spare capacity for connection of future equipment.
Note that this project will take place during winter months when cooling loads are expected to be low, but operation of the SPP steam turbine chiller and CT-5/6 is likely for at least some time period during the Work. The team will be required to ensure operation of the remaining cooling plant equipment during the project. Operations of the Power Plant will continue during the project; coordination of access and any equipment shutdowns will be required with KSU Power Plant personnel.
Interested parties may attend a pre-proposal meeting on December 15, 2026, at 10 am in Room 102 Harbourt Hall, 615 Loop Road, Kent, Ohio 44242.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Federal
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency (IEUA) is soliciting consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project (RFP-JV-26-013). The scope of work encompasses project initiation, data gathering, basis of design, detailed design, and procurement support. The project must adhere to IEUA Engineering Design Guidelines, SCADA Standards, and Title 22 regulations for treated wastewater. This is a not-to-exceed contract paid on a time and material basis, with proposals due by January 26, 2027. The set-aside status is designated for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Selection is based on a ranking of proposals evaluating the project team, level of effort, and fee estimates, with potential interviews for critical project components. The top-ranked consultant will negotiate the final contract terms for approval by the IEUA Board of Directors. Because the project involves federal and state funding, the consultant must comply with the Davis-Bacon Act, the Endangered Species Act, and various equal opportunity and non-discrimination requirements. All payments are processed via ACH, and the agency retains full ownership and confidentiality of all reports, drawings, and data produced during the performance of the contract.
Inland Empire Utilities Agency

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
Federal
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency is soliciting professional engineering consulting services for the Chino Basin Program Purified Water Conveyance Design Project in California. The scope of work involves the design and bid period assistance for a purified water conveyance system that delivers water from the Advanced Water Purification Facility to injection wells. Key responsibilities include project initiation, data gathering, detailed design, providing opinions of probable construction cost, and supporting the bid award process. The project requires adherence to specific engineering design guidelines and compliance with 2 CFR Part 200, as well as various federal and state grant funding requirements, including the Davis-Bacon Act and Buy America preferences. This is a not-to-exceed contract with a required initial two-year firm pricing term. The solicitation is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals are due by January 26, 2027, and will be evaluated on a 100-point scale focusing on technical challenges, risk mitigation, and project implementation. Selection involves a ranking process where the top three consultants will have their fee envelopes opened and may be interviewed before final approval by the IEUA Board of Directors.
Inland Empire Utilities Agency

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
International
Transportation and Economic Corridors - Request for Proposal - CON0025985 & CON0026229 – Engineering Consultant Services for Hwy. 901:48, Intersection Improvements & Hwy. 5:06, Passing Lanes
Solicitation # AB-2026-07801
Alberta Transportation and Economic Corridors is seeking engineering consultant services for two distinct projects in Alberta. Contract A (CON0025985) involves intersection improvements at seven locations within Siksika Nation to implement safety recommendations, while Contract B (CON0026229) focuses on the identification and design of passing lanes between the Town of Magrath and the City of Lethbridge. The scope of work for both projects encompasses preliminary engineering, detailed design, contract tendering, construction supervision, and warranty inspection, with an anticipated construction completion date of October 2028. This is a restricted procurement process; proposals are only being requested from Eagle Engineering Corporation, ISL Engineering and Land Services Ltd., and McElhanney Ltd. Selection will be based on a value-based process considering both qualifications and price, rather than the lowest cost. The successful consultant will enter into a Lump Sum and Hourly Rate Contract and must possess a valid Certificate of Recognition (COR) or an approved equivalent. Proposals must be submitted via the APC E-submissions platform as two separate PDF files—a Qualification Submission and a Fee Proposal—each under 10MB, by the deadline of January 12, 2027.
Transportation and Economic Corridors

POSTED

about 13 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
International
Transportation and Economic Corridors - Request for Proposal - CON0025985 & CON0026229 – Engineering Consultant Services for Hwy. 901:48, Intersection Improvements & Hwy. 5:06, Passing Lanes
Solicitation # CON0025985
Alberta Transportation and Economic Corridors is requesting proposals for engineering consultant services for two distinct projects in Alberta. Contract A (CON0025985) focuses on intersection improvements at seven locations within Siksika Nation on Highway 901:48, while Contract B (CON0026229) involves the design and implementation of passing lanes on Highway 5:06 between the Town of Magrath and the City of Lethbridge. The scope of work for both contracts encompasses the full project lifecycle, including preliminary engineering, detailed design, contract tendering, construction supervision, and post-construction warranty inspection. Construction is anticipated to be completed by October 2028, with overall service completion expected by December 31, 2029. This is a restricted RFP available only to short-listed prequalified consultants, specifically Eagle Engineering Corporation, ISL Engineering and Land Services Ltd., and McElhanney Ltd. Selection will be based on a value-based process considering both qualifications and price rather than the lowest cost. The contract utilizes a hybrid payment structure consisting of lump-sum payments for preliminary engineering, detailed design, contract tendering, and post-construction, while construction supervision and warranty inspections are paid via hourly rates plus disbursements. Proposals must be submitted as two separate PDF files—one for qualifications and one for fees—each under 10MB, with a submission deadline of January 11, 2027.
Transportation and Economic Corridors

POSTED

about 14 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from Ohio → Kent State University - Office of the University Architect

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS