Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

La Feria Drainage Improvements Phase 1

Open
6adf7b440223036d2926ae88State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of La Feria in Texas is soliciting bids for the La Feria Drainage Improvements Phase 1 project to address flooding and enhance stormwater conveyance. The scope of work includes modifying curb inlets and upsizing storm sewer laterals along Canal Street between 4th and 9th Streets, installing new relief pipes, and adding a 36-inch RCP parallel to the existing line near William B. Green Junior High School. Additionally, the project involves expanding and lining a drainage channel, installing a trenchless equalizer pipe beneath the La Feria Main Irrigation Canal, and rehabilitating the east and west drainage ditches through regrading and debris removal. The solicitation also includes additive bids for the construction of a new detention pond and channel grading improvements at the Veterans Memorial Park Sports Complex. Interested parties must submit their responses by December 3, 2026. The primary point of contact for this local government project is Isaac Huacuja.

General Info

La Feria bids for drainage improvements and stormwater projects due December 3, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → City of La Feria
Contacts1 person available
OfficeN/A
Organization / AgencyTexas → City of La Feria
Office AddressN/A

Full Description

Show more
The City of La Feria is located along U.S. Highway 83 in central Cameron County, approximately midway between the cities of Harlingen and Mercedes. Due to known flooding events and drainage issues within the City of La Feria (“City”), the City has identified key areas in need of drainage improvements. The proposed improvements are intended to improve stormwater conveyance and reduce flooding within these areas. A general summary of the recommended improvements is provided below: Modifications to the existing 5-foot-wide curb inlets at the intersections of Canal Street from 4th Street to 9th Street. Installation of new storm sewer relief pipes connecting the storm sewer systems from 6th Street through 9th Street to the 4th Street storm sewer system. Upsizing of storm sewer laterals along Canal Street and associated intersections between 4th Street and 9th Street. Installation of a new 36-inch RCP parallel to the existing 36-inch RCP from Canal Street to the existing drainage channel on the south side of William B. Green Junior High School. Expansion of the existing drainage channel adjacent to the south side of William B. Green Junior High School, including a 900-foot concrete channel lining alternative. Installation of an equalizer pipe via trenchless construction beneath the La Feria Main Irrigation Canal to convey stormwater from the east drainage ditch system to the west drainage ditch system. Rehabilitation of the existing west drainage ditch, including clearing and removal of trees, vegetation, and accumulated debris to restore stormwater conveyance capacity. Regrading of the existing east drainage ditch to establish positive drainage and direct stormwater flow north toward the proposed equalizer pipe. Construction of a new detention pond at the Veterans Memorial Park Sports Complex. This improvement will be included as an Additive Bid. Channel grading improvements to the existing stormwater conveyance channel flowing south along the eastern edge of the Veterans Memorial Park Sports Complex. These improvements will be included as an Additive Bid.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter, as well as 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional structural requirements include the installation of standard and doghouse manholes, drop assemblies, and a CSO regulator fit out. Site preparation tasks encompass the clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation of a Stormwater Pollution Prevention Plan. Key project deliverables and requirements include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, geotechnical instrumentation and monitoring, and the procurement of specific railroad insurance. The project also involves various abandonment tasks for existing pipes and manholes, as well as extra depth excavations. All inquiries and quotations should be directed to John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves constructing 16,435 linear feet of new 20-inch ductile iron force main and performing extensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance requiring a Good Faith Efforts Form and Table A. Performance and payment bonds are required, and insurance providers must hold an A.M. Best rating of A-VII or better. The project timeline specifies substantial completion within 560 calendar days and final completion within 580 calendar days from the commencement date. Administration is managed by Willis Engineers, and payments are processed via Applications for Payment, becoming due 30 days after presentation to the owner. Materials must adhere to strict packaging and marking standards, including specific ANSI/AWWA specifications for ductile iron piping and ASTM standards for steel hardware.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS