Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Labbe Meadow Restoration Project (Project)

Forecast
5A32CR00265State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Labbe Meadow Restoration Project, identified by solicitation number 5A32CR00265, is a forecast project managed by the California Regional Water Quality Control Board, Region 5 in Redding. Located at 2571 Quincy Junction Road in Quincy, Plumas County, California, the project focuses on improving meadow hydrologic function and increasing habitat complexity at the Labbe Ranch. The primary scope of work involves constructing a series of earthen plugs and open water ponds within a historic ditch feature. These interventions are designed to raise the base elevation of the ditch channel, create open water habitat, reduce surface flow conveyance, and promote groundwater recharge by increasing vertical and lateral connectivity between the ditch and the surrounding meadow surface. The project is categorized under NAICS code 541620 and is governed by several regulatory standards. It is categorically exempt from the California Environmental Quality Act under section 15333 as a small habitat restoration project under five acres. Additionally, the project requires authorization under the U.S. Army Corps of Engineers Clean Water Act Section 404, Nationwide Permit 27, and has received Clean Water Act Section 401 Water Quality Certification. Key administrative contacts include Lynn Coster of the Regional Water Quality Control Board and Christy Morgan of the U.S. Army Corps of Engineers.

General Info

Labbe Meadow project restores hydrology via earthen plugs, creating ponds to enhance groundwater recharge and habitat in Quincy, California.

Agency

California → Regional Water Quality Control Board, Region 5 - Redding

Place of Performance

Quincy, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 5 - Redding
Contacts3 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 5 - Redding
Office AddressN/A
Contacts
Lynn CosterSenior Environmental Scientist
Christy MorganProject Manager

Full Description

Show more
The purpose of the project is to improve meadow hydrologic function and increase meadow habitat complexity by the creation of a series of open water ponds within a historic ditch feature on the Labbe Ranch. A series of earthen plugs and corresponding ponds are proposed to be constructed throughout the ditch feature where the channel is most defined. The objective of these treatments is to create open water habitat while raising the base elevation of the ditch channel. Plugs will have the added benefit of increasing the vertical and lateral connectivity of the ditch surface flow path with the meadow surface to the northeast, reducing surface flow conveyance of the ditch, and promoting groundwater recharge in the meadow.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
On-Call Solid Waste Data Analysis and Economic Services
Solicitation # 26-202-S
Seattle Public Utilities is seeking an on-call consultant to provide expert solid waste data analysis and economic services to support the city's Zero Waste goals. This contract, with an estimated value of $625,000 and a duration of up to five years, focuses on leveraging extensive datasets to evaluate the effectiveness, equity, and feasibility of solid waste incentives, programs, and policies. The scope of work includes program evaluation using causal inference, economic modeling, demand forecasting, longitudinal analysis of waste characteristics, and the extraction of data from Microsoft Access databases. A key component of the engagement is the translation of complex technical findings into actionable insights through data visualization, strategic storytelling, and high-quality reports for both technical and non-technical audiences. The selection process is based on a weighted evaluation of project team qualifications and research and analytical capabilities, with a strong emphasis on equity-centered analysis and the ability to manage multiple projects in an on-call environment. Awarded consultants must adhere to strict compliance standards, including mandatory WMBE inclusion plans for contracts over $343,000, adherence to the Americans with Disabilities Act and WCAG accessibility guidelines, and compliance with Seattle's Equal Benefits and minimum wage ordinances. The contract is governed by a template that incorporates FAR Part 31 for allowable overhead costs and requires specific insurance coverages, including Commercial General Liability and Worker's Compensation. Work is assigned via individual work assignments, each with its own defined schedule and deliverables.
Seattle Public Utilities

POSTED

about 16 hours ago

DEADLINE

in 6 days
View Details
NAICS: 541620
New
SLED
BIG WAVE NEW BRIDGE
Solicitation # 2027-RFP - Big Wave Bridge-00211
The County of San Mateo, through the Planning and Building department, is soliciting proposals for a qualified consultant to secure resource agency and encroachment permits for the construction of the Big Wave New Bridge. Located at 386 Airport Street in Half Moon Bay, the bridge will span a wetland drainage area between a Big Wave parcel to the north and a County-owned parcel to the south to ensure pedestrian path continuity toward the Princeton area. This project is conducted under the conditions of approval for Planning Permit PLN2013-00451. It is important to note that the actual construction of the bridge and the application for the building permit are explicitly excluded from the consultant's scope of work. The contract has a term of one year, with an anticipated award date of November 24, 2026. Proposals must be submitted via the eProcurement portal by November 16, 2026, and must be divided into a technical proposal and a separate fee proposal. Award selection is based on a points-based scoring method where firm qualifications, project approach, proposed schedule, and price are each weighted at 25 percent. The County provides a procurement preference for local businesses and non-profits. All communications regarding the RFP must be handled through the authorized contact persons, Camille Leung and Amy Tang, or the eProcurement portal.
Planning and Building

POSTED

about 17 hours ago

DEADLINE

in 9 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS