Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on May 17, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Labortory Casework

Awarded
12405B19Q0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Solicitation 12405B19Q0010 was issued by the USDA Agricultural Research Service for the furnishing and installation of two sets of metal laboratory casework at the Southeast Area facility located in Fort Pierce, Florida. The project falls under NAICS code 238390 and has an estimated value between 25,000 and 100,000 dollars, with a required performance period of 120 calendar days. Originally issued on March 20, 2019, the procurement underwent several modifications. While initially structured differently, Amendment 002 transitioned the solicitation to Full and Open Competition, withdrawing the Small Business Set-Aside. The final bid submission process was managed through a series of amendments that clarified delivery addresses and documentation requirements, with the extended bid deadline set for May 9, 2019.

General Info

Contract Value

$32,355

NAICS

238390 - Other Building Finishing Contractors

Place of Performance

MS, USA

Set-Aside

NONE

Awardee

NYCOM INC

Award Issued Date

Documents

4

Amendment 0003 to Solicitation 12405B19Q0010

PDF, High priority: read this firstamendment
High

Amendment 001 to Solicitation 12405B19Q0010

PDF, High priority: read this firstamendment
High

Amendment 002 to Solicitation 12405B19Q0010

PDF, High priority: read this firstamendment
High

RFQ 12405B19Q0010 - Metal Laboratory Casework

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Ars Sea Aao Acq/per Prop
Contacts1 person available
OfficeSTONEVILLE, MS, 38776, USA
Office AddressSTONEVILLE, MS, 38776, USA
Contacts
Huron W. VirdenContract Specialist

Full Description

Show more
This is a Request for Quote (RFQ) announcement for the U. S. Department of Agriculture (USDA), Agricultural Research Service (ARS), Southeast Area (SEA) Horticultural Research Laboratory (USHRL), 2001 South Rock Road, Fort Pierce, FL 34945. This announcement is a total set-aside for Small Business Concerns. The USDA-ARS is seeking a qualified contractor to furnish all tools, equipment, material, permits, labor, and supervision necessary to furnish and install (2) sets of metal laboratory casework, as per the attached Solicitation 12405B19Q0010 Solicitation Clauses, Provisions, and Statement of Work (SOW); summary of which is provided below: SCOPE OF WORK The terms under this contract is for the Contractor to provide all materials and labor necessary to provide (furnish and install) two (2) sets of metal laboratory casework located in laboratory 2015. Work shall conform to the recommended structural requirements and testing of Scientific Equipment and Furniture Association. Contractor shall furnish standard metal laboratory casework, support-framing system, laboratory utility-space framing, laboratory countertops, laboratory sinks, accessories, water, laboratory gas, and electrical service fittings. The attachments to this SOW show proposed casework layout. STRUCTURAL: Provide metal laboratory casework capable of withstanding the loads without permanent deformation, excessive deflection, or binding of drawers, doors, and shelves of base, wall, and storage cabinets. Cabinets: 100 lb. (45 kg); Drawers: 150 lb. (68 kg); Floor-Supported Base Cabinets: 75 lb./ft. (112 kg/m) within cabinets, 50-lb/ft.; (74-kg/m) countertop, plus 75 lb./ft. (112 kg/m) on countertop; Countertop Supports: 50-lb/ft. (74-kg/m) countertop, plus 75 lb./ft. (112 kg/m) on countertop; Support Framing: 300 lb./ft. (446 kg/m) for single-faced assemblies, 600 lb./ft. (893 kg/m) for back-to-back assemblies. All metal panels shall be of material specifically designed for laboratory work surfaces. BASE CABINETS: Set cabinets straight, plumb, and level. Adjust sub tops within 1 /16" (1.5 mm) of a single plane. Fasten cabinets to utility-space framing, partition framing, wood blocking, or reinforcements in partitions with fasteners spaced 24" (600 mm) o.c. Bolt adjacent cabinets together with joints flush, tight, and uniform. Where base cabinets are not installed adjacent to walls, fasten to floor at toe space with fasteners spaced 24" (600 mm) o.c. Secure sides of cabinets to floor, where they do not adjoin other cabinets, with not less than 2 fasteners. Pull doors shall be mounted vertically and drawers horizontally. Width of the knee opening shall be in accordance with the attached drawing. PAINT: Shall be chemical and corrosion resistant, electrostatically applied baked on powder coat enamel finish. Immediately apply after cleaning and pretreating, manufacturer's standard 2-coat, chemical-resistant, baked-enamel finish consisting of prime coat and thermosetting topcoat with a minimum dry film thickness of 1 mil (0.025 mm) for topcoat and 2 mils (0.05 mm) for system. Color shall be light blue to match the existing casework. UTILITIES: Provide space, cutouts, and holes for pipes, conduits, and fittings in cabinet bodies to accommodate laboratory service fittings, utility services and their support-strut assemblies. Replacement fixtures shall match existing in finish, capacity and quantity. DRAWERS: Telescoping outer and inner pans on the drawer fronts shall be designed to eliminate raw edge of steel at top. Fabricate sides, back, and bottom of one piece with rolled or formed top of sides for stiffening and comfortable grasp for drawer removal. Provide drawers with rubber bumpers, runners, and positive stops to prevent metal-to-metal contact or accidental removal. Drawer Guides: Metal-channel, self-closing drawer guides, designed to prevent rebound when drawers are closed, with nylon-tired, ball-bearing rollers. Drawer slide self-closing when drawer nears end of its travel and having positive stop in full extension. HARDWARE: Provide manufacturer's standard satin-finish, commercial-quality, heavy-duty corrosion free hardware complying with requirements indicated for each type. Pulls must meet ADA standards. Door catches must be nylon-roller spring catch or dual, self-aligning, permanent magnet catch. FIXTURES: A. Mechanical service fixtures shall be heavy duty, specially designed and manufactured for laboratory use and shall have provisions for index coding. Fixtures for liquids and gaseous mixtures shall have lettered and colored indexes for each service. Handles shall be the color coded plastic bonnet type or black or white, with color tabs identifying utility. Serrated hose ends shall have seven (7) serrations. Fixtures for gas, air and vacuum shall be needle valve, large type. Water fixtures shall be compression type. Drain fittings shall be polypropylene unless otherwise noted. B. Plumbing Fixtures. Plumbing fixtures, except for drain fixtures and fittings, shall be a red-brass composition containing at least 85% copper with washers and seats, of maximum wear resistant materials for the specific use. Reagent grade water fixture to be brass goose neck type with an internal polypropylene lining that permits recirculation to the manual outlet. C. Needle Valves (Large). Large needle valves contain a replaceable valve seat and floating cone made of stainless steel for fine control. Valves have removable serrated hose end. D. Compression Water Valves. Compression water valves have a renewable unit containing all working parts, including a stainless steel replaceable seat and valve disc. This unit is broached on the outside for permanent position in the valve body. The unit contains an integral control device for volume of water discharged by the faucet. The valve has a removable serrated hose end unless otherwise noted. Valve shall be rated for 857 kPa (124 psi) operating pressure with a max. of 1303 kPa (189 psi) for intermittent use. E. Faucet Accessories. Hot and cold water combination sink faucets are to have aerator tips. Cold water, Cup sink and reagent grade water faucets to have serrated hose ends. Faucets are to be 152mm (6") swing spout type except cup sink and reagent grade water. Deionized water faucet: Deck mounted-fixed faucet for distilled, deionized or reverse osmosis water. Faucet has exterior stainless steel casing and interior lining of inert polypropylene. Faucet not reactive to materials and ideal for dispensing deionized water. Faucet has a side mounted, single round handle twist manual handle that controls water flow. Faucet 6" gooseneck faucet, 11" high, and 1-3/16" male shank with " OD tube connection. Seven serration plastic hose end. F. Vacuum Breakers. Integral vacuum breakers shall be supplied on water fixtures. G. Service Identification. Index buttons mounted in fixture handles shall identify the following services. Buttons shall be color-coded and lettered. 1. Hot Water HW Red 2. Cold Water CW Dark Green 3. Gas LG Dark Blue 4. Compressed Air LA Orange 5. Vacuum Vac LV Yellow 6. Reagent Grade Water DI White 7. Argon AR Purple 8. Nitrogen N2 Brown H. Fixture Hardware. Fixtures are to be supplied with necessary tank nipple and lock-nut to attach to counter top, curb or panel. I. Service Fixture Finish. Laboratory brass service fixtures shall be satin chrome plated finish with a clear epoxy coating. Fixtures receive multiple applications of coating and are baked for polymerization. Units must be assembled before coating and pressure tested before shipment. J. Fixture Shipment. Fixtures shall be assembled in factory and supplied loose except for fume hood factory mounted fixtures. K. Available Manufacturers. Water Saver Corporation, Chicago Faucet or Broen Inc. TOPS AND SINKS: Provide manufacturer's closest standard size of equal or greater volume to existing sinks. Epoxy resin sink shall be a solid molded mass consisting of a modified resin, coloring and proper fillers producing a smooth finish the same color as the surrounding counter top, highly resistant to laboratory chemicals, abrasion and water absorption. The side of the sink shall be tapered and the inside corners radiused. Epoxy resin 100% sinks shall have integral side mounted overflows. The bottom of the sink shall pitch to the drain. Available Manufactures: Durcon Corporation (Plymouth, MI), Epoxyn Products (Mountain Home, AR) or Laboratory Tops Inc (Taylor, TX). Use procedures and products recommended by sink and top manufacturers. Work bench tops and sinks shall be factory molded of modified epoxy-resin formulation, uniform mixture throughout full thickness with smooth, non-specular finish. Provide smooth, clean exposed tops and edges in uniform plane free of defects. Make exposed edges and corners uniformly beveled. Provide front and end overhang of 1" over base cabinets, formed with continuous drip groove on underside ". Set top edge of sink unit in sink and top manufacturers' recommended chemical-resistant sealing compound and firmly secure to produce a tight and fully lea proof joint. Adjust sink and securely support to prevent movement. Before setting, apply a full coat of sink and top manufacturer's recommended chemical resistant sealant and firmly secure to produce a tight and fully leakproof joint under rim lip and along top. Use stainless-steel sink frame, complete with clamping lugs and pads. Omit sink frame if sink is fabricated with an integral rim seal. Rout groove in top to receive sink rim if not prepared in shop. Set sink in adhesive and fill remainder of groove with sealant or adhesive. Remove excess adhesive and sealant while still wet and finish joint for neat appearance. Contractor shall be aware that work bench #2 is a flat work bench without a sink and no utilities on the top surface. KNEE SPACE TABLE: Contractor to supply additional epoxy resin formulation top steel table with rubber casters for knee space. ATTACHMENTS a) Laboratory 2015 location b) Propose work bench/casework layout c) Work bench 1 d) Work bench 2 e) Work bench 1 & 2 sink cabinets

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS