Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

LACC - Subcontracting Opportunity for Wave 3 - Acoustical Ceilings

Open
RFP-05State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

PCL Webcor, a Joint Venture (PWJV) is soliciting firm, fixed-price proposals for the Los Angeles Convention Center Expansion and Modernization Project. This specific opportunity focuses on the fabrication and installation of acoustical ceilings and wall panels, including T-bar wires, grids, struts, and device tiles. The period of performance is scheduled from May 22, 2026, to April 5, 2028, with key milestones for subcontract execution in July 2026, shop drawing completion by August 2026, and fabrication and delivery concluding by February 2027. Proposals will be evaluated based on best value, considering the proposer's technical credibility, financial resources, and capability to supply labor and materials within the project timeframe. The project mandates strict compliance with a Project Labor Agreement (PLA) and requires a 30% local hire minimum and 10% new local first-period apprenticeship positions. Set-aside goals for the Business Inclusion Program include SBE at 25%, MBE at 18%, EBE at 3%, WBE at 4%, DVBE at 3%, and LBE at 20%. Additionally, subcontractors must adhere to LEED GOLD certification standards, provide weekly certified payroll reports via LCP Tracker, and be prepared to provide 100% performance and payment bonds. All work involving carpenters, laborers, and cement finishers must be unionized. Proposals should be submitted via email to Kate Schuck.

General Info

PWJV seeks proposals for acoustical ceiling and wall panel installation in Los Angeles.

Place of Performance

Los Angeles, CA, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this first677 pages · rfp
High
XLSX, High priority: read this first5 pages · sow
High

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 2 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Deadline changed

The response deadline was removed.

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering Bureau, Public Works
Contacts1 person available
OfficeN/A

Full Description

Show more
Proposal Submittal Method Please submit via email to Kate Schuck at Sign up to see this detail Webcor a Joint Venture (PWJV) is interested in obtaining proposals for: LOS ANGELES CONVENTION CENTER EXPANSION AND MODERNIZATION PROJECT.PWJV has been selected by AEG Plenary Conventions Los Angeles (APCLA) to submit a Firm, Fixed Price proposal for the design and construction of the Project. Firms may submit proposals for one or more scopes.Scope of Work All labor, supervision, material, plant and equipment to furnish and install all Acoustical Ceilings in accordance with the contract documents.* Bidders may download the remaining project documents provided at:https://pcl.egnyte.com/fl/JRCKXKcBJpG7Password: M3bPrb3r8jw8For more information, please see the Bid Manual.

Similar Contracts

Same NAICS industry code

NAICS: 238310
New
SLED
Drywall Removal, Treatment, and Repair HHSC RAS Office
Solicitation # HHS0018211
The Texas Health and Human Services Commission (HHSC) is soliciting competitive bids for the inspection, removal, treatment, and repair of drywall at the HHSC RAS Admin Office located at 11307 Rozell St., San Antonio, TX. The project is necessitated by an ice maker leak and covers rooms 1700, 1013, 1014, and 1015. The scope of work includes site preparation with 6-mil plastic sheeting and zip walls, demolition of damaged drywall, treatment of framing with EPA-registered antimicrobial wash, and the installation of matching R-value insulation and new drywall. Final deliverables include professionally finished, textured, and painted walls, with all furniture and equipment returned to their original layout. Award will be based on the best value to the State, considering price, the ability to meet performance requirements, and past vendor performance. Bidders must provide an all-inclusive price and adhere to strict performance standards, including a four-hour response time for standard service calls and a one-hour on-site response for emergencies. Contractors are required to conduct Texas Department of Public Safety criminal and sex offender background checks for all personnel and utilize the E-Verify system. Mandatory requirements include maintaining specific commercial general liability, auto, and professional liability insurance, and complying with the Buy Texas program. Responses must be submitted on a single USB drive by the deadline, including signed solicitation affirmations and addendum acknowledgments.
Health and Human Services Commission

POSTED

2 days ago

DEADLINE

in 11 days
View Details

More opportunities from California → Engineering Bureau, Public Works

Same awarding agency

NAICS: 541330
SLED
TOS No. 105 - Baldwin Vista Green Streets Project
Solicitation # 105
Task Order Solicitation No. 105 is for the Baldwin Vista Green Streets Project, managed by the City of Los Angeles Bureau of Engineering and LA Sanitation and Environment. The project focuses on stormwater capture and infiltration within the Baldwin Vista community, specifically along Coliseum Street between Hauser Boulevard and Nicolet Avenue. The scope of work includes engineering services for pre-design, design, bid and award, and construction support to install approximately 23 double drywell units, one single drywell unit, 450 square feet of bioswales with native landscaping, 40 new street trees, and seven educational displays. The project is funded through the Safe Clean Water Program, with total estimated costs ranging from 9.3 million dollars for construction to approximately 10.9 million dollars when including planning, design, operations, maintenance, and three years of post-construction monitoring. The contract utilizes a hybrid compensation structure, with pre-design and design phases paid on a lump-sum basis and bid, award, and construction support services reimbursed at hourly-salary rates. Proposals are evaluated based on project understanding and technical approach (30 percent), team qualifications (20 percent), value and resource allocation (20 percent), knowledge of City standards (20 percent), and project delivery performance (10 percent). Key requirements include adherence to ADA accessibility, California prevailing wage laws, and a Minority Business Enterprise participation goal of 18 percent. Deliverables follow a phased review process with required approvals at 30, 50, 90, and 100 percent design stages. The solicitation closing date is January 5, 2027, with the task order expected to be issued by April 15, 2027.
Engineering Services

POSTED

13 days ago

DEADLINE

N/A
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS