Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lacombe County - Invitation to Bid - 2026 Bridge Replacement and Other Work_Bridge File 01966

Closed
AB-2026-00232Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the complete replacement of Bridge File 01966 on Range Road 252 over Jones Creek, located 20 km east of Red Deer, Alberta. The project requires the removal and disposal of the existing three-span 6.1-meter girder bridge supported by a treated timber substructure, and the installation of a new three-span SL-510 concrete girder bridge with spans measuring 6.0, 8.0, and 6.0 meters respectively, supported by a steel substructure. The scope of work encompasses a wide range of activities including traffic accommodation, water management, demolition, new piling installation, abutment, pier, and wingwall construction, the supply and erection of prestressed precast units, as well as installation of bridgerail, guardrail, and erosion control measures. Contractors are expected to supply all necessary materials and equipment to complete the project, with all incidental items required for a fully functional and compliant bridge replacement included as part of the work without additional compensation. The contract also specifies environmental considerations such as Total Suspended Solids testing and suitable erosion control measures. Bidders must be familiar with site conditions that may impact construction activities, including environmental and traffic constraints. Upon completion, a two-year warranty period is required for all work performed under this contract. The tender is managed by Lacombe County with a response deadline set for early February 2026, and the project follows all specifications and special provisions detailed in the contract documentation.

General Info

Replace Bridge File 01966 on Range Road 252 with new three-span SL-510 concrete girder bridge.

Agency

Government of Canada → Lacombe County

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Lacombe County
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Lacombe County
Office AddressN/A
Contacts
Tim EdwardsContracting Authority

Full Description

Show more
Bridge File 01966 (SW 14-38-25-W4M) Carrying Range Road 252 over Jones Creek, 20 km E of Red Deer. Work at this site includes the removal and disposal of the existing three span 6.1 – 6.1 – 6.1 m HC girder bridge on a treated timber substructure and the installation of a new three span 6.0 – 8.0 – 6.0 m SL-510 concrete girder bridge on a steel substructure. The crossing is located on a local road over Jones Creek, 20 km east of Red Deer. A location plan has been included in the Plans section of this document for the Contractor’s convenience. Lacombe County - 25 - Tender No. 01966-26 SPECIAL PROVISIONS Without limiting the provisions of these Specifications and Contract, the Scope of Work at this site shall include the following: • Traffic Accommodation • Total Suspended Solids (TSS) Testing • Water Management • Demolition and Disposal of Bridge Structure • Headslope Preparation and Backfill • Supply, Set-up, and Driving of Piling • Abutment, Pier, and Wingwall Construction • Supply, Delivery, and Erection of Prestressed SL-510 Interior and Exterior Precast Units • Supply and Installation of Bridgerail and Guardrail • Roadway Work • Supply and Placement of Class 1 Heavy Rock Riprap • Supply and Placement of Erosion Control Soil Covering and Barriers Each bidder, in submitting a tender, acknowledges that he has examined the site and the surrounding area, and is familiar with all conditions and /or restrictions that could affect or limit his operations due to such things as environmental constraints, public traffic, and property of others. Unless otherwise specified, the Contractor must supply all materials necessary to complete the Work. A complete job is called for, therefore any labour, material, equipment, tool or incidental item not specifically mentioned, but necessary for completeness will be considered incidental to the Work, and no separate or additional payment will be made. The warranty period for all work on this Contract shall be for two years from project completion.