Lake Babine Nation - Tachet Community Wastewater System

Active
2022-2451-00International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Lake Babine Nation Tachet Community Wastewater System project involves the construction and commissioning of a new wastewater treatment facility located at Babine I.R. No. 25 in Tachet, British Columbia. Managed by Associated Engineering (B.C.) Ltd., the scope of work includes the development of a treatment facility featuring two aerated treatment lagoons, a polishing cell, control structures, aeration systems, chemical addition, and ultraviolet disinfection. The project also encompasses the construction of sanitary piping, a lift station, and wastewater mains. Key technical components include a complex process control narrative for automation and SCADA systems, as well as specialized equipment agreements for the lagoon aeration and UV disinfection systems, which are subject to novation to become subcontracts under the selected General Contractor. The contract is structured as a Unit and Lump Sum Price agreement, with an estimated project completion date of October 2027. While the total contract value is not fully defined due to pending unit price quotes for civil and mechanical works, stipulated sums for specialized components—including the chemical feed system, aeration system, and UV disinfection—total approximately $2,211,000. Procurement and evaluation for specific equipment, such as the chemical feed system, are based on a 100-point scale considering price, technical compliance, maintenance requirements, and local support. Due to the high archaeological potential of the site, the project mandates strict adherence to an Archaeological Chance Find Procedure and requires an Archaeological Impact Assessment prior to ground-altering activities. Compliance with various standards, including the British Columbia Building Code and Canadian Electrical Code, is mandatory, and the project requires rigorous commissioning through functional performance testing and system verification.

General Info

Construction of Tachet wastewater facility in BC, featuring treatment lagoons, finishing October 2027.

Agency

Associated Engineering (B.C.) Ltd.View Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(13)

Lake Babine Nation Tachet CWWS - Appendix H: Process Control Narrative

PDFspecifications

2022-2451-00 Tachet Community Wastewater System Addendum 1

PDFamendment

Appendix L - UV Disinfection System Equipment Agreement

PDFcontract-document

Tachet Community Wastewater System - Appendix F: Archaeological Overview Assessment

PDFspecifications

Appendix J - Lagoon Aeration System Equipment Agreement

PDFcontract-document

Tachet Community Wastewater System - Geotechnical Report (Appendix B)

PDFspecifications

Lake Babine Nation - Tachet Community Wastewater System Chemical Feed Equipment RFP

PDFrfp

File 2022-2451 - Appendix G: Archaeological Chance Find Procedure

PDFspecifications

Lake Babine Nation Tachet Community Wastewater System - Appendix A Commissioning Program Forms

PDFspecifications

dwg_2451-00-pkge_IFT

PDFother

Lake Babine Nation Tachet Community Wastewater System - Appendix I

PDFspecifications

Lake Babine Nation - Tachet Community Wastewater System Environmental Impact Study

PDFspecifications

ICMS 122868 - Tachet Community Wastewater System Contract Specifications

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyAssociated Engineering (B.C.) Ltd.
ContactsNo contacts available
OfficeCAN
Organization / Agency
Associated Engineering (B.C.) Ltd.
View Agency Profile
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
The Work involves the construction of Tachet Community Wastewater System (CWWS).

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure initiative managed by James W. Fowler Co. for the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional construction requirements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. The project also encompasses critical civil and site work, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of equipment and materials. Bids are due by September 29, 2026, with all negotiations required to be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

More opportunities from Associated Engineering (B.C.) Ltd.

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS