This Solicitation opportunity from Department Of Agriculture was posted on September 23, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation AG-05GG-S-08-0065 is a HUBZone set-aside contract issued by the USDA Forest Service for the Okanogan-Wenatchee National Forest to perform shoreline erosion control at Mitchell Creek and Deer Point on Lake Chelan. The project involves a base bid for Mitchell Creek and an optional award item for Deer Point, with an estimated value between 100,000 and 250,000 dollars. The scope of work focuses on fisheries enhancement and erosion mitigation through the installation of various rock embankment treatments, including single and double row rock placements, enhanced placed rock, and the construction of rock steps.
Technical requirements specify the use of large woody debris (LWD) anchored with stainless steel cables and Hilti adhesive into hold-down boulders weighing between 700 and 1250 pounds. The project utilizes specific treatment types ranging from T1 to LWD-H1, incorporating materials such as fiber wattles and permanent turf reinforcement mats. Following a preproposal meeting and site visit on September 16, 2008, the solicitation was amended to provide revised quantity calculations and field measurements. The final closing date for responses was extended to October 1, 2008, at 4:30 PM local time. Labor for the project is subject to Washington State wage determinations for heavy, highway, and dredging construction.
HighAI Summary for AG-05GG-08-0039 Erosion Control for Uplake Chelan: Solicitation issued on 8/22/2008 by the Okanogan & Wenatchee National Forests for shoreline erosion control at Lake Chelan. The project includes a base bid for Mitchell Creek and an optional award item for Deer Point. Estimated value is between $100,000 and $250,000, with a mandatory site visit on September 16, 2008, and offers due by September 24, 2008.
DOC
DOC, High priority: read this first1 page · amendment
HighAI Summary for AG-05GG-S-08-0065 Amendment 1: Amendment to solicitation AG-05GG-S-08-0065 for Erosion Control for Uplake Chelan, Okanogan & Wenatchee National Forests. Issued on September 22, 2008, the amendment clarifies the solicitation number, extends the closing date to October 1, 2008, and incorporates information from the pre-proposal meeting and site visit held on September 16, 2008.
DOC
DOC, High priority: read this first3 pages · amendment
HighAI Summary for Amendment 1 - Preproposal Meeting Notes: This amendment documents the preproposal meeting and site visit held on September 16, 2008. It provides critical clarifications regarding Large Woody Debris (LWD) transport, technical specifications for stainless steel cable anchors, and site-specific operational constraints. Notably, the solicitation closing date is extended to October 1, 2008. The document includes revised schedules of items, quantity calculations, and a Q&A session addressing equipment use, material sourcing, and evaluation factors.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Deer Point Treatment Zone Field Measurements: This document provides updated field measurements and a crosswalk for treatment types at Site 58 (Deer Point Campground). It details specific treatment zones (A1-F), lengths, and descriptions including rock placements and Large Woody Debris (LWD) configurations, as well as the construction of five sets of rock steps.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Double Row Rock Placement with Perpendicular LWD - P1: Technical drawing and specification for the placement of double row rock and large woody debris (LWD) at location P1, including details on fiber wattles and elevation markers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Enhanced Placed Rock with Perpendicular Large Woody Debris (LWD-P2): Technical specification and plan view for the construction of a fisheries enhancement project using placed rock and large woody debris (LWD). The document specifies the use of 14-18 inch and 20-30 inch logs and references FP-03 Spec. 252 for the rock embankment construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lake Chelan Shoreline Erosion Control - LWD-H1 Enhanced Placed Rock: Technical drawing and specification sheet (LWD-H-1) for Enhanced Placed Rock with Horizontal Large Woody Debris for the Lake Chelan Shoreline Erosion Control project. It details the plan and elevation views for rock embankment construction and the placement of logs with anchors.
DOC
DOC, High priority: read this first2 pages · specifications
HighAI Summary for Lake Chelan Shoreline Erosion Control - Revised Schedule of Items: A revised bid schedule for the Lake Chelan Shoreline Erosion Control project. The document outlines a Base Bid for Mitchell Creek and an Optional Award Item for Deer Point, detailing specific line items for mobilization, soil erosion control, turf reinforcement mats, and various rock embankment treatments with associated units and estimated quantities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lake Chelan Shoreline Erosion Control - Sheet T-2 Enhanced Placed Rock: Technical drawing and specification sheet (T-2) for the Lake Chelan Shoreline Erosion Control project. It details the installation of enhanced placed rock with pockets, including specific rock sizes (5-8 inch), excavation depths, and references to FP-03 Spec 252 and 713.18 for rock embankments and turf reinforcement mats.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lake Chelan Shoreline Erosion Control - Single Anchor Rock Placement: Technical drawing and specification sheet for the placement of single anchor rocks (700-1250 lbs) for the Lake Chelan Shoreline Erosion Control project. Includes excavation depth requirements and side view profile.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lake Chelan Shoreline Erosion Control - T3 Double Row Rock Placement: Technical drawing/specification sheet T-3 for the Lake Chelan Shoreline Erosion Control project. It details the placement of double row rocks and large woody debris (LWD), specifying rock weights (700-1250 lbs for anchors, 700-900 lbs for large, 300-500 lbs for medium) and LWD dimensions (14-24 inch diameter, 20-30 feet long).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lake Chelan Shoreline Erosion Control Treatments - Construction Plans: Construction plans and index of sheets for Lake Chelan Shoreline Erosion Control Treatments, issued by the USDA Forest Service, Okanogan-Wenatchee National Forests, Chelan Ranger District. The document outlines various rock placement and large woody debris (LWD) treatment types (T1 through LWD-H1).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lake Chelan Shoreline Erosion Revised Estimated Quantities: Dated September 19, 2008, this document contains detailed quantity calculations and technical estimates for shoreline erosion control at Lake Chelan, specifically focusing on Mitchell Creek and Deer Point. It includes calculations for rock embankments (T1-T4), silt fences, turf reinforcement mats (TRM), and large woody debris (LWD) anchor rocks, providing cubic footage and linear footage requirements.
DOC
DOC, High priority: read this first1 page · specifications
HighAI Summary for Large Woody Debris Inventory - Sites 58 and 59: An inventory of acceptable Large Woody Debris (LWD) pieces for erosion control treatments at Mitchell Creek and Deer Point, prepared for WDNR Lake Chelan Settlement. The document lists specific dimensions for 14 total pieces of debris.
DOC
DOC, High priority: read this first1 page · specifications
HighAI Summary for Mitchell Cr. Treatment Zone Field Measurements: Field measurement data and treatment descriptions for the Mitchell Creek project, dated 9/11/08. The document compares solicitation estimates against actual field measurements for various treatment zones (T1, T3S, T4, LWD-H), noting a discrepancy in total length for full and 3/4 treatments (343 ft measured vs 306 ft solicited).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for T1 Enhanced Placed Rock - Lake Chelan Shoreline Erosion Control: Technical drawing/specification sheet T1 for the Lake Chelan Shoreline Erosion Control project. It details the placement of enhanced rock embankments, large rock bases, and erosion control measures including excelsior fiber wattles and Permanent Turf Reinforcement Mats (Type 5.C) per FP-03 specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for T3S - Single Row Rock Placement w/Pocket: Technical drawing and specifications for single row rock placement with horizontal large woody debris for the Lake Chelan Shoreline Erosion Control project. Includes rock size requirements (700-1250 lbs) and material specifications for fiber wattles and government-furnished logs.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for T4 - Rock Step Inclusion - Lake Chelan Shoreline Erosion Control: Technical specification sheet T4 for the Lake Chelan Shoreline Erosion Control project. It provides detailed requirements for the construction of rock steps, including the use of large select rock with two flat faces, a path width of 5 feet, riser heights between 6-10 inches, and a target elevation of 1106 ft. It references FP-03 Spec 620 for further details.
DOC
DOC, High priority: read this first4 pages · specifications
HighAI Summary for USFS LWD Anchoring Procedure: Technical procedure document detailing the methods for anchoring Large Woody Debris (LWD) to hold-down boulders. It provides specific instructions on material placement, augering logs, drilling and cleaning boulder holes, cabling techniques, and the application of Hilti hy150 adhesive.
RTF
RTF, High priority: read this first59 pages · wage-determination
HighAI Summary for WA20080001 - Washington State Wage Determination: General Decision WA20080001 dated August 29, 2008, establishing prevailing wage rates and fringes for Heavy, Highway, and Dredging construction projects statewide in Washington. The document details specific labor rates for carpenters, divers, and millwrights across various regions including the Columbia River Area, Spokane Area, Southwest Washington, and Central Washington, including zone pay, depth pay for divers, and HAZMAT premiums.
JPG
JPG
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
1 update
PhaseAwarded
Posted
Presolicitation
Notice updated
Response deadline changed from Sep 20, 2008 to Sep 24, 2008. NAICS code changed from 115310 to 237990. The notice description changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Agriculture → Okanogan-Wenatchee National Forest