Lake Drive Storm Drain and Manchester Outfall Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Lake Drive Storm Drain and Manchester Outfall Project, managed by the City of Encinitas, involves the replacement of a failing storm drain system to reduce flood risk and protect public safety. The scope of work includes removing temporary bypass piping and installing approximately 1,730 to 2,000 linear feet of 48-inch reinforced concrete pipe. Additionally, the project requires the construction of a permanent detention basin and a 25-foot-wide decomposed granite maintenance road. Maintenance activities at the Manchester Avenue site will focus on periodic sediment removal at the culvert outfall and J-Channel, with materials transported to approved landfills or beach placement sites. The project is located across two primary sites in Encinitas, California: an undeveloped canyon near Interstate 5 and a City right-of-way area adjacent to the San Elijo Lagoon Ecological Reserve. Construction is estimated to take approximately 11 months, with a performance window between January 15, 2026, and November 30, 2031. The project has undergone extensive environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration and a Notice of Determination dated May 27, 2026. Key regulatory requirements include a Coastal Development Permit and coordination with Caltrans for work within the Interstate 5 right-of-way. Technical specifications mandate adherence to San Diego Regional Standard Drawings for pipe bedding and trench backfill.

General Info

City of Encinitas storm drain replacement and detention basin construction in Encinitas, California.

Agency

California → City of Encinitas

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Lake Drive & Sea Village Way, Manchester Avenue & Ocean Cove Drive, Encinitas, CA, 92007

Set-Aside

NONE

Documents

(12)

Lake Drive Storm Drain and Manchester Ave Culvert Outfall ISMND November 2025

PDFinitial-study-mitigated-negative-declaration

Lake Drive Storm Drain and Manchester Avenue Culvert Outfall Project Summary

PDFenvironmental-summary

Caltrans Comments on Lake Drive Storm Drain and Manchester Outfall Project MND

PDFcomment

Notice of Determination for Lake Drive Storm Drain and Manchester Avenue Culvert Outfall Project

PDFnotice-of-determination

NOI Lake Drive Manchester Project Encinitas CA

PDFspecial-notice

Appendix A Biological Technical Report for Lake Drive and Manchester Avenue Project

PDFbiological-technical-report

Lake Manchester Cultural Resources Inventory and Evaluation Report May 2025

PDFcultural-resources-inventory

Caltrans Comments on Lake Drive Storm Drain and Manchester Outfall Project MND 2025110169

PDFcomment-letter

Lake Drive Storm Drain and Manchester Outfall Project Notice of Completion

PDFnotice-of-completion

DWR Comment Letter on Lake Drive Storm Drain Project

PDFcomment-letter

Lake Drive Storm Drain Improvements Draft Drainage Report 90% Submittal Oct 2024

PDFtechnical-report

Lake Drive Storm Drain Improvements Geotechnical Investigation Report

PDFgeotechnical-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Encinitas
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Encinitas
Office AddressN/A
Contacts
Esteban DannaSenior Planner
Ben StrykerSenior Engineer
Alexandra HowardEnvironmental Planner

Interested Companies (1)

Show more
Dudek
Encinitas, CA

Full Description

Show more
The project proposes the replacement of an existing failing storm drain system within the Lake Drive canyon and Manchester Avenue outfall, including removal of temporary bypass piping, installation of a new 40-inch reinforced concrete pipeline, construction of a permanent detention basin and 25-foot-wide decomposed granite maintenance road, and long-term operations and maintenance activities to reduce flood risk and protect public safety. Maintenance at the Manchester Avenue component would involve periodic sediment removal at the existing culvert outfall and J-Channel, with material exported to a landfill or permitted beach placement site. A City-owned staging area adjacent to Manchester Avenue would be used for temporary stockpiling. The Lake Drive project site is an undeveloped canyon bounded by existing residential development to the north and east, I-5 to the west, and undeveloped open space to the south and west. The Manchester Avenue project site is located within City right-of-way adjacent to the San Elijo Lagoon Ecological Reserve, with residential uses to the north. The project sites are located within areas designated for open space, residential, and ecological reserve uses, and portions occur within the Multiple Habitat Conservation Program focus planning areas. The project requires City approval of a Coastal Development Permit and associated environmental review.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The scope of work includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, vegetation clearance, and stone rework for the revetted mole. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a price evaluation preference. Bidders must submit physical sealed envelopes by the deadline, as electronic submissions are prohibited. Required documentation includes SF 1442, the CLIN schedule, representations and certifications, and a bid guarantee. The contractor must provide key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Performance will be measured through pre- and post-dredge multi-beam surveys conducted by a third-party surveyor, and the contract includes liquidated damages of 2,297 dollars per calendar day of delay. Compliance with the Davis-Bacon Act and strict environmental and safety standards is required throughout the execution of the work.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 11 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price construction contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include demolition, clearing and grubbing, excavation, placing embankment, installing separator geotextiles, placing graded stone, and turf establishment and maintenance. Bids are due by October 19, 2026, at 10:00 a.m., with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on unit prices, provided they are reasonable and balanced. The contractor must adhere to EM 385-1-1 safety standards and the Davis-Bacon Act for prevailing wages. Performance requirements include submitting a preliminary project schedule within 15 days and an initial schedule within 42 days of the Notice to Proceed. The contract includes liquidated damages of $4,295.00 per calendar day of delay and requires the use of approved testing laboratories for quality control. A project labor agreement is not required for this acquisition.
W07V Endist New Orleans

POSTED

about 12 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS