Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from South Carolina was posted on October 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lake Fairfield Pedestrian Bridge Rehab And Boardwalk Replacement

Closed
IFB #26043State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Salem Township OPWC Emergency Culvert Repair
Solicitation # 49254
The Salem Township OPWC Emergency Culvert Repair project, administered by the Washington County Engineer, involves the emergency replacement of a culvert washout on Road T-16, Duck Creek Rd. The scope of work requires the removal of existing pipes and concrete headwalls and the installation of a 6' x 8' pre-cast reinforced concrete 4-sided box culvert with wingwalls. All construction must adhere to the 2023 ODOT Construction and Materials Specifications and the Ohio Manual of Uniform Traffic Control Devices. The project has an engineer's estimate of $85,048, and the contract will be awarded to the lowest responsive and responsible bidder, provided the bid does not exceed the estimate by more than 10%. The required completion date for all work is December 1, 2026, with liquidated damages set at $200 per day. Contractors must comply with several stringent regulatory requirements, including the OPWC Proposal Notes, Ohio prevailing wage laws, and Buy America mandates for steel and iron products. Mandatory certifications include proof of Ohio workers' compensation coverage, enrollment in an OBWC-approved Drug-Free Workplace Program, and a certification against debarment and suspension. Bidders are required to provide a bid guaranty via bond or a 10% deposit and must submit a comprehensive bid package including non-collusion affidavits and corporate documentation. Post-award deliverables include a subcontractor list, a construction schedule, and estimated road closure durations, all of which must be submitted at least one week prior to the start of construction.
Washington County, OH - Engineer

POSTED

about 17 hours ago

DEADLINE

in 16 days
NAICS: 237310
New
SLED
Sidewalk Repair for the Recreation Department & Senior Center Building
Solicitation # 39192
The Town of Plainfield is seeking proposals from qualified vendors for sidewalk repair and replacement services at the Recreation Department and Senior Center Building located at 482 Norwich Road, Plainfield, CT. The project aims to resolve frost heave issues affecting automatic ADA doors by removing the existing concrete walkway and base material and replacing them with more suitable materials as specified in the construction plans. The contract will be awarded on a lump sum basis to the lowest responsive bidder whose proposal is deemed in the best interest of the Town. Sealed bids must be submitted to the Finance Office at Plainfield Town Hall by 11:00 AM on Tuesday, October 20, 2026. Qualified bidders must be Equal Opportunity Employers, in good standing with the Connecticut Secretary of State, and have no delinquent taxes owed to the Town. The contract is subject to state compliance requirements, including a 25% set-aside for DAS-certified Small Businesses and a 6.25% set-aside for Minority, Women, and/or Disabled-owned Businesses. Insurance requirements include commercial auto coverage of at least 1,000,000 dollars and the naming of the Town of Plainfield as an additional insured. Proposals must include a technical volume with a letter of transmittal, a detailed approach to the scope of work, a completed bid form, proof of insurance, and a corporate resolution. All work must be performed according to code and is subject to building inspection.
DAS Procurement

POSTED

about 20 hours ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
Roadway Culvert Lining IDIQ
Solicitation # 2201030
Hennepin County is soliciting bids for Project CP 2201030, an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for roadway culvert lining. The scope of work involves the installation of Cured-In-Place-Pipe Lining (CIPP) using the Ultraviolet Light (UV) process, specifically prohibiting steam or heat cured CIPP. The project covers sections of County State Aid Highway No. 11, 19, and 125, as well as County Road No. 116, spanning the cities of Corcoran, Independence, Loretto, Mound, Rogers, and Tonka Bay. Additional requirements include traffic control, joint repair, dewatering, culvert cleaning and removal, and erosion control. All work must adhere to the 2025 MnDOT Standard Specifications for Construction. The contract is estimated to be valued between 150,000 and 2,000,000 USD, with individual task orders required to be at least 75,000 USD. The initial term is effective until November 9, 2028, with the first task order anticipated to begin on November 9, 2026. Award will be granted to the lowest responsible bidder who complies with all proposal requirements, including SBE participation goals and the submission of an approved Affirmative Action Plan for contracts exceeding 100,000 USD. Bidders must submit all proposals electronically via ProcureWare by 2:00 p.m. on October 20, 2026. Key compliance requirements include the submission of a Non-Collusion Affidavit and a Responsible Contractor Verification and Certification of Compliance per Minnesota Statute 16C.285. Contractors must provide performance and payment bonds equal to the contract amount and maintain comprehensive insurance, including a 4,000,000 USD umbrella liability policy. Minnesota prevailing wage statutes apply to all project labor. Final inspection and acceptance will be conducted by the County and the project engineer at the work site.
Hennepin County

POSTED

1 day ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The project involves the rehabilitation of the Lake Fairfield Pedestrian Bridge and the replacement of the associated boardwalk located on Lake Fairfield Drive in Greenville, South Carolina. Originally constructed in 2007, the existing infrastructure requires upgrades to ensure safety, durability, and functionality. The scope of work mandates that the contractor implement all necessary safety measures to protect the public during construction activities and to prevent any damage to county roads, utilities, private properties, or other infrastructure in the vicinity. The project is managed by the Greenville County Engineering & Maintenance Division and is funded within a contract range of $500,000 to $1,500,000. The solicitation, identified as IFB #26043, was posted on October 24, 2025, with a response deadline of November 14, 2025. Interested contractors can contact Anthony Dawson via email or phone for further details. The project falls under NAICS code 237310, which pertains to highway, street, and bridge construction, indicating the specialized nature of the work. The project site is situated in South Carolina, and additional information about the procurement process and project specifics can be accessed through the Greenville County procurement portal.

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Carolina → Greenville County Engineering & Maintenance Division
Contacts1 person available
OfficeN/A

Full Description

Show more
The project site is located on Lake Fairfield Drive in Greenville, South Carolina. The pedestrian bridge and boardwalk connects the end of Fairfield Drive with the cul-de-sac on Hermitage Road. The existing pedestrian bridge and boardwalk were completed in 2007.For the proposed work, the contractor shall take all the necessary measures to ensure the safety of the public and prevent damage to County roads/infrastructure, utilities, and private property.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS