Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on August 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lake Hope State Park - Roof Replacements on 7 Structures

Closed
SRC0000033213State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

35 minutes ago

DEADLINE

in 5 days
NAICS: 238160
New
SLED
Emergency Board-Up Services Request For Qualifications
Solicitation # 102126
The City of Santa Monica Fire Department is seeking qualified service providers to establish a list of contractors for emergency as-needed board-up services. The primary objective is to secure residential and commercial structures following fire incidents to prevent unauthorized entry, theft, or vandalism, particularly when property owners are unavailable. Selected contractors must be able to respond to fire scenes within one hour of notification and provide all necessary labor, tools, materials, and equipment, including temporary fencing. A critical term of this agreement is that the City and the Fire Department are not responsible for payment; contractors must recover all costs directly from property owners, occupants, or insurance companies and have no recourse against the City if reimbursement is not obtained. To qualify, bidders must hold a valid Class-B California contractor's license and a City of Santa Monica business license. The award will be based on the best bidder, evaluated on criteria including pricing, availability, experience, references, and the quality of services. The contract includes a payment term of 30 days from the receipt of an invoice and offers the City the option for four additional one-year renewal periods. All submissions must be made electronically via the OpenGov portal by November 6, 2026. Required documentation includes a mandatory release form, a payment bond, and certifications regarding non-discrimination and debarment.
D190 FIRE DEPARTMENT

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 238160
New
SLED
REPLACE THE GUTTERS AT THE DEFUNIAK COURTHOUSE
Solicitation # 05-27
Walton County is soliciting competitive quotations for the complete removal and replacement of the internal and concealed gutter system at the three-story DeFuniak Springs Courthouse in Florida. The selected contractor must provide all labor, supervision, equipment, and materials necessary to install a durable, watertight drainage system, including the removal of deteriorated flashing, sealants, and liners. Key requirements include performing a preconstruction assessment to verify dimensions, conducting a controlled water test upon completion, and ensuring all restoration materials are compatible with the existing building. The project requires a final walkthrough with the owner and a comprehensive site cleanup to return the area to its preconstruction condition. Qualified respondents must hold a valid Florida contractor license, such as a Certified General, Building, Roofing, or Sheet Metal Contractor license. Submissions must include a total lump-sum base quotation with an itemized breakdown, a proposed project schedule detailing mobilization and duration, warranty information for both workmanship and materials, and two professional references. The deadline for responses is November 19, 2026, at 12:00 pm, with all submissions and clarifications handled through the OpenGov Procurement portal. Award consideration will be based on price and the ability to meet technical and administrative requirements.
Facility Maintenance

POSTED

about 18 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

This contract pertains to the roof replacement project at Lake Hope State Park, involving seven structures including the Dining Lodge, Camper Cabins, Shelter, Boat House, Beach House, and Ranger/Custodial Building. The project is initiated to address aging and wear-related deterioration of the existing roofs, with work scheduled for completion no later than May 30, 2026. A site visit is scheduled for August 26 and 28, where contractors will meet with Jason Garey, the designated point of contact, at the Lake Hope Dining Lodge to assess the structures and gather necessary information. Bidders are required to submit their proposals by September 5, 2025, with the contract awarded to the lowest responsive and responsible bidder based on a detailed unit cost breakdown per structure. The scope of work includes comprehensive demolition of existing roofing materials, necessary repairs to roof decking with prior approval, and installation of new steep-slope roofing systems using Owens Corning Oakridge shingles, with specific attention to manufacturer specifications for ventilation, waterproofing, and aesthetics. Contractors must provide all materials, site cleanup, permits—including Ohio Department of Commerce approval—and disposal services, ensuring compliance with state and local regulations. The contract emphasizes adherence to Ohio’s legal and administrative standards, including non-discrimination, use of minority and EDGE vendors, and compliance with laws governing offshore services and foreign investments. Additional contractual documents incorporate standard Ohio Department of Natural Resources and Department of Administrative Services terms, covering legal obligations such as payment terms, non-appropriation clauses, ethics, bonding, insurance, and warranty provisions. Contractors are also required to complete affirmation and disclosure forms affirming understanding of restrictions related to offshore services and foreign entities, with the acknowledgment that any work outside the U.S. without proper waiver could result in contract termination. Overall, the project aims to ensure durable, compliant roofing across park structures while maintaining transparency and adherence to state procurement and legal standards.

General Info

Place of Performance

OH, USA

Set-Aside

NONE

Documents

3

Addendum to Bid Quote Base Template Non-Federal Funds Rev. 2024-09-13

PDF, High priority: read this first5 pages · amendment
High

DAS Standard Terms and Conditions 3-31-25

PDF, High priority: read this first25 pages · standard-terms-and-conditions
High

Affirmation and Disclosure Form Rev. 3/22

PDF, Low priority2 pages · affirmation-and-disclosure-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → DNR353309 Lake Hope State Park DNRPIC
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Jason GareyPoint of Contact

Full Description

Show more
Site Visit & Point of Contact.August 26 and August 28 10:00am Jason Garey at +1 (555) 000-0000 will meet contractors at Lake Hope Dining Lodge 27331 State Route 278 McArthur, OH 45651 to view structures. Name or Title of the Service: Lake Hope State Park - Roof Replacements for 7 structures.Ordering Location and Address:                Lake Hope State Park                                                                                                29371 Wheelabout Rd.                                                                                                McArthur, OH 45651Project Background: Lake Hope State Park requires services to replace the roofs of 7 structures due to age and wear and tear. The buildings are located throughout the park and please reference the attached map for locations for Camper Cabin 191 &192, Lake Hope Dining Lodge Shelter, Boat House, Shelter House, Beach House and Ranger/Custodial Building.  Please include pricing per structure by name that is on the map.  Work is to be completed no later than May 30, 2026.Specifications/Scope of Work: General Requirements: The awarded Contractor will be required to sign a Services Agreement.  Example attached. Contractor will be responsible for providing all materials needed to replace the roofs. Contractor will provide a dumpster for all trash and disposal/removal of all construction materials and site cleanup to include removal of nails and scrap. Contractor will be responsible for all permits, including the Ohio Department of Commerce permit. There are 7 different structures, pricing will be broken down by name of the building on the attached map. 
Demolition: Existing shingles, felt paper, ridge caps, valley flashing, pipe boots, drip edge, nails etc. to expose plywood sheeting. As needed, replace the damaged roof decking and any rotten wood that would preclude the proper installation of the new roofing materials.   NOTE: All wood repairs will require Park Manager approval on a per incident basis before any repairs should be made, any repairs made that did not receive prior approval will not be included in any final change order pricing adjustment.
Install: Steep slope roofing systems according to manufacturer’s specifications. Install new 1-1/2" Drip edge around the perimeter of the cabin. Install new ice/water shield at all eaves, valleys, and penetrations larger than 6". Install all new synthetic roofing underlayment of remainder of roof decking. Install all new valley metal. Install all new pipe boots, flashing, and metals according to manufacturer’s specifications and sealant around chimney flashing. Install all new hip/ridge cap shingles at all hips and ridges. Install all new full length ridge vent for ventilation according to manufacturer's specifications. Install Energy rated Owens corning Oakridge dimensional shingles, Brownwood Color with Streakguard Algae Resistant Protections, 110 mph wind protection and lifetime manufacturer's warranty. Please note that sheathing may be necessary over rough sawn lumber boards to meet shingle manufacturer warranty and for nails do not protrude through to be visible. A site visit is highly suggested to view structures.
Map:Project Location:              Lake Hope State Park                                                27331 State Route 278McArthur, OH 45651Jason Garey – +1 (555) 000-0000; contact@example.gov Date:            No later than May 30, 2026Site Visit & Point of Contact.August 26 and August 28 10:00am Jason Garey at +1 (555) 000-0000 will meet contractors at Lake Hope Dining Lodge 27331 State Route 278 McArthur, OH 45651 to view structures. Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.Evaluation.  The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.Contract Award.  The contract will be awarded to the lowest responsive and responsible bidder by low lot total.  Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive. 

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS