This Solicitation opportunity from Ohio was posted on August 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Lake Hope State Park - Roof Replacements on 7 Structures
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract pertains to the roof replacement project at Lake Hope State Park, involving seven structures including the Dining Lodge, Camper Cabins, Shelter, Boat House, Beach House, and Ranger/Custodial Building. The project is initiated to address aging and wear-related deterioration of the existing roofs, with work scheduled for completion no later than May 30, 2026. A site visit is scheduled for August 26 and 28, where contractors will meet with Jason Garey, the designated point of contact, at the Lake Hope Dining Lodge to assess the structures and gather necessary information. Bidders are required to submit their proposals by September 5, 2025, with the contract awarded to the lowest responsive and responsible bidder based on a detailed unit cost breakdown per structure. The scope of work includes comprehensive demolition of existing roofing materials, necessary repairs to roof decking with prior approval, and installation of new steep-slope roofing systems using Owens Corning Oakridge shingles, with specific attention to manufacturer specifications for ventilation, waterproofing, and aesthetics. Contractors must provide all materials, site cleanup, permits—including Ohio Department of Commerce approval—and disposal services, ensuring compliance with state and local regulations. The contract emphasizes adherence to Ohio’s legal and administrative standards, including non-discrimination, use of minority and EDGE vendors, and compliance with laws governing offshore services and foreign investments. Additional contractual documents incorporate standard Ohio Department of Natural Resources and Department of Administrative Services terms, covering legal obligations such as payment terms, non-appropriation clauses, ethics, bonding, insurance, and warranty provisions. Contractors are also required to complete affirmation and disclosure forms affirming understanding of restrictions related to offshore services and foreign entities, with the acknowledgment that any work outside the U.S. without proper waiver could result in contract termination. Overall, the project aims to ensure durable, compliant roofing across park structures while maintaining transparency and adherence to state procurement and legal standards.
General Info
Place of Performance
OH, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Demolition: Existing shingles, felt paper, ridge caps, valley flashing, pipe boots, drip edge, nails etc. to expose plywood sheeting. As needed, replace the damaged roof decking and any rotten wood that would preclude the proper installation of the new roofing materials. NOTE: All wood repairs will require Park Manager approval on a per incident basis before any repairs should be made, any repairs made that did not receive prior approval will not be included in any final change order pricing adjustment.
Install: Steep slope roofing systems according to manufacturer’s specifications. Install new 1-1/2" Drip edge around the perimeter of the cabin. Install new ice/water shield at all eaves, valleys, and penetrations larger than 6". Install all new synthetic roofing underlayment of remainder of roof decking. Install all new valley metal. Install all new pipe boots, flashing, and metals according to manufacturer’s specifications and sealant around chimney flashing. Install all new hip/ridge cap shingles at all hips and ridges. Install all new full length ridge vent for ventilation according to manufacturer's specifications. Install Energy rated Owens corning Oakridge dimensional shingles, Brownwood Color with Streakguard Algae Resistant Protections, 110 mph wind protection and lifetime manufacturer's warranty. Please note that sheathing may be necessary over rough sawn lumber boards to meet shingle manufacturer warranty and for nails do not protrude through to be visible. A site visit is highly suggested to view structures.
Map:Project Location: Lake Hope State Park 27331 State Route 278McArthur, OH 45651Jason Garey – +1 (555) 000-0000; contact@example.gov Date: No later than May 30, 2026Site Visit & Point of Contact.August 26 and August 28 10:00am Jason Garey at +1 (555) 000-0000 will meet contractors at Lake Hope Dining Lodge 27331 State Route 278 McArthur, OH 45651 to view structures. Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
