Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on August 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lamar County 2026 LRA Project- Camp Road

Closed
PE-77070-NONST-2027-000000008State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of subcontractors and suppliers for underground construction, including tunneling, boring, jacking, and micro tunneling, as well as the installation of steel casing, valves, and cathodic protection. Additional requirements encompass site preparation and civil works such as land surveying, site photography, clearing, shoring, subgrade roadbed work, asphalt paving, and the implementation of storm water pollution prevention measures. Deliverables include the completed collector line infrastructure, manholes, traffic signs, signals, lighting, and landscaping. This solicitation is open to small businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Kiewit emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested parties must submit their quotes by November 18, 2025, via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
International
Conservation Work and Access Road Improvement of Shahr-e Gholghola to Chehel Dukhtaran Ancient Qalah and Access Road Improvement of Zargaran Bala and Zargaran Payeen Valley in Bamiyan, Afghanistan Aziz Ur Raman Tanha - [email hidden]
Solicitation # AFG26ITB009
UNESCO is soliciting bids for a large-scale works project in Bamiyan province, Afghanistan, focused on preserving heritage properties and upgrading informal settlements in Sayed Abad, Zargaran Bala, and Zargaran Payeen villages. The scope of work includes the conservation of the Ancient Qalahh of Chehel Dukhtaran, improvement of access roads from Shahr-e Gholghola to the Qalahh, and the installation of drainage systems. Key construction activities involve stone masonry, Plain Cement Concrete (PCC), boulders, and Reinforced Cement Concrete (RCC). The project is supported by the government of Italy and implemented through UNESCO and UN-Habitat. The contract will be awarded to the lowest priced technically qualified bidder based on criteria including technical capacity, experience, and compliance with specifications. The performance period requires commencement within 45 days of site access, with substantial completion expected within four months. Financial terms include a potential 20% advance payment, with progress payments submitted monthly and final payment processed 30 days after the issuance of a Certificate of Substantial Completion. Contractual obligations include a 10% performance guarantee valid for 12 months post-completion and a 12-month defects liability period. Liability insurance must cover the contract value plus 10%. For delays, liquidated damages are set at 0.35% of the contract price per calendar day, capped at 10%. Bidders must submit their proposals in PDF format via email by November 29, 2026, ensuring all files are under 10MB per email and avoiding third-party file-sharing tools.
UNESCO

POSTED

about 22 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Salem Twp- T-16 Culvert Washout Replacement
Solicitation # 49913
The Salem Township T-16 Culvert Washout Replacement project involves the emergency repair of a culvert washout on Duck Creek Road in Whipple, Ohio. The scope of work requires the contractor to provide all labor, equipment, and materials to replace the existing washout with a pre-cast concrete four-sided box culvert. The project is governed by the 2023 Ohio Department of Transportation Construction and Materials Specifications and the requirements of the Washington County Engineer. The estimated project cost is $91,527.00, and the contract will be awarded to the lowest and best bidder, provided the bid does not exceed the estimate by more than 10 percent. All work must be completed by April 1, 2027, with a one-year guarantee against defects following final payment. Contractors must adhere to strict regulatory requirements, including Ohio Prevailing Wage Laws, the Ohio Bureau of Worker’s Compensation Drug-Free Workplace Program, and Ohio preference for local products and labor. Required deliverables for the pre-construction meeting include a subcontractor list, a construction schedule, and road closure estimates. The contractor must provide a bid guaranty and, if necessary, a performance bond. Additionally, the project mandates compliance with various federal non-discrimination acts and requires the submission of certified payrolls and proof of Ohio workers' compensation coverage. The Township serves as the sole judge of the quality of materials and workmanship, and the pre-cast box culvert must be installed within a single day after coordinating with the county.
Washington County, OH - Engineer

POSTED

1 day ago

DEADLINE

in 16 days
NAICS: 237310
New
SLED
KTA 8297
Solicitation # 8297
KTA Contract 8297, managed by the Kansas Turnpike Authority, involves the installation of an Ultrathin Bonded Asphalt Surfacing (UBAS) overlay on I-35, including interchanges, from mile marker 112 to 132 in Lyon County. The scope of work encompasses UBAS, commercial grade asphalt patching and surfacing, patching of the I-35 mainline, and the milling and inlaying of the outside shoulder. Key deliverables include the installation of specific pavement markings, such as 12-inch white chevron lines and 6-inch yellow edge lines, and the implementation of comprehensive work zone traffic control. Performance is scheduled in phases, with asphalt patching and commercial grade paving starting no earlier than April 12, 2027, and UBAS and remaining work commencing after May 31, 2027. The contract will be awarded to the lowest responsible bidder based on the summation of unit prices multiplied by approximate quantities. Bidders must provide a statement of financial condition unless pre-qualified by the Kansas Department of Transportation or the Authority, and must submit a bid bond of 5 percent of the bid. The contractor is required to provide certificates of insurance for Workers' Compensation, Employer's Liability, and Comprehensive Public Liability and Property Damage Insurance. All work must adhere to the 2015 Standard Specifications for State Road and Bridge Construction and KDOT Construction Manual standards, with strict prohibitions against making turnarounds through the barrier wall.
Kansas Turnpike Authority

POSTED

1 day ago

DEADLINE

in 2 days

AI Contract Overview

Show more

Lamar County is soliciting sealed bids for the 2026 LMIG TSPLOST Project on Camp Road, extending from South 6th Street Ext. to the Spalding County Line/Potato Creek Bridge. The project involves full depth cement stabilized reclamation and asphalt pavement overlay, including associated traffic control, shoulder clipping, sweeping, tack, and striping. All work must adhere to the current Georgia Department of Transportation Standard and Supplemental Specifications and the Manual on Uniform Traffic Control Devices. The project is funded through 2026 LMIG and TSPLOST funds, with a required completion timeframe of 180 consecutive calendar days following the written Notice to Proceed. Bids must be submitted in sealed envelopes to the office of the Chairman by 2:30 p.m. on September 29, 2026. Required submission documents include a bid sheet, an anti-collusion oath, and a bid bond for at least five percent of the bid amount. Award decisions will be based on responsiveness and the bidder's qualifications. The successful contractor must provide performance and payment bonds from a surety authorized to do business in Georgia and listed in Department of the Treasury Circular 570. Administrative oversight is managed by Sean Townsend as Contract Administrator and James Rigdon as the Technical Representative. Payment is processed within 30 days of an approved estimate, contingent upon the submission of progress reports and necessary lien waivers or payment affidavits.

General Info

Lamar County seeks bids for Camp Road asphalt project by September 29, 2026.

Documents

1
PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Lamar County Board of Commissioners
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
This is an invitation to submit a bid to Lamar County for the 2026 LMIG ¿ TSPLOST Project (Camp Road) as indicated herein. Sealed bids will be received at the office of the Chairman (in Lamar County Administration Building at the above address) up to 2:30 p.m., September 29, 2026, at which time they will be opened and publicly read. This project will be funded with 2026 LMIG and TSPLOST funds. Construction includes Full Depth Reclamation (FDR) with asphalt overlay on Camp Road within Lamar County. All work shall conform to the Georgia Department of Transportation¿s (GDOT) Standard Specifications Construction of Transportation Systems, Current Edition; GDOT¿s Supplemental Specifications Construction of Transportation Systems, Current Edition; and all applicable GDOT Standards and Details; and other contract requirements, specifications and general conditions. Bid Documents may be obtained by downloading them from the Georgia Procurement Registry (GPR) at https://ssl.doas.state.ga.us/PRSapp/. Interested Bidders/Proposers are solely responsible for obtaining the Bid Documents, addenda, and all solicitation updates from the Georgia Procurement Registry. No hard copies of the Bid Documents will be mailed. All questions regarding the Project shall be submitted in writing by email only. Questions shall be emailed simultaneously to: Brian Scarbrough ¿ contact@example.gov; Ritchie Swindell ¿ contact@example.gov; and Sean Townsend ¿ contact@example.gov.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS