Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from North Carolina was posted on April 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Landfill Closure Construction Opportunity - South Property Phase 2 Cells 7-10A

Closed
338-READVERTISEMENT - SOUTH PROPERTY PARTIAL CLOSURE PHASE 2 - CELLS 7-10AState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work involves mowing, string trimming, edging, and cleanup for approximately 50 acres of maintained property and over 35 buildings. The contractor is responsible for providing all labor, supervision, equipment, materials, fuel, transportation, and insurance. Performance is based on a weekly schedule, with a requirement to maintain turf height between 3 and 4 inches. Any rejected work or identified deficiencies must be corrected within 48 hours at no additional cost to the government. The contract consists of an initial one-year term with the option for four additional one-year renewals. Award will be granted to a responsible offeror whose quote is technically acceptable and represents the lowest price. To be deemed technically acceptable, offerors must provide evidence of Kentucky state registration and licensing, verification of eligibility via the SAM portal, a detailed fixed-price quote, and a comprehensive submission including a technical proposal, company qualifications, three references, an equipment list, and a safety program. Compliance with the Federal Acquisition Regulation (FAR), OSHA, and EPA regulations is mandatory. Specifically, the contract adheres to the Davis-Bacon Act and Contractor Wage Rate Requirements under Wage Determination Number KY20210041. Payment is subject to net terms and requires the submission of weekly certified payroll and a signed Statement of Compliance with each invoice. Additionally, contractors must provide proof of their ability to secure performance and payment bonding. Quotes must be submitted electronically to the purchasing agent by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

25 minutes ago

DEADLINE

in about 8 hours
NAICS: 561730
New
SLED
IT, Lot Cleanup, Vegetation Control, Debris Removal, and Metal Product Decommissioning and Removing
Solicitation # RFP-Lot-Cleanup-CCT-IT-10_15.pdf
The Confederated Tribes of the Colville Reservation is soliciting proposals for comprehensive lot cleanup, vegetation control, debris removal, and metal product decommissioning services for five designated lots located in Nespelem and Omak, Washington. The selected contractor will be responsible for providing all labor, equipment, and transportation to perform grass cutting, vegetation trimming, and the removal of loose garbage and abandoned materials. Additionally, the scope includes the decommissioning and removal of authorized products, equipment, and fixtures, with a strict requirement to notify the owner of any hazardous or contaminated materials discovered. The project concludes with a final site inspection to ensure all properties are left in a clean, orderly, and safe condition. Proposals are due by November 5, 2026, and must be submitted to the CCT IT Department. The contract term is for an as-needed period not to exceed three years, with payments contingent upon the availability of funds in the tribal treasury. Evaluation is based on a 100-point scale considering reliability, budget, and TERO designations, with a specific preference for responsible Indian Offerors whose prices are within 10 percent of the lowest non-Indian bid. Awardees must provide proof of insurance and sign a certification regarding debarment and suspension. Furthermore, any contract exceeding 100,000 dollars requires a performance bond, otherwise, a 25 percent retainage will be applied.
Confederated Tribes of the Colville Reservation

POSTED

about 15 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

New Hanover County is seeking bids for the second phase of a partial closure project at the South Property Landfill, specifically targeting Cells 7 through 10A. The project involves both temporary and final capping systems over approximately 9 acres, with about 2.4 acres designated for final closure and 6.6 acres for temporary measures. The scope includes site preparation, installation of liner and soil cover systems, construction of stormwater and erosion control structures, grading, seeding, sodding, and expansion of the landfill gas collection system. Additionally, the project entails repairs to the existing North Property Landfill closure. The construction timeline is set at 210 days from the notice to proceed, with an extra 30 days for final completion. Bidders must attend a mandatory pre-bid conference, with a second opportunity scheduled for April 24, 2024, and bids are due by 2:00 p.m. on May 3, 2024. The project emphasizes adherence to detailed specifications and includes sourcing fill soil from an offsite borrow source, with all work to be completed in accordance with the provided contract documents.

General Info

Place of Performance

NC, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → County of New Hanover
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
READVERTISEMENT
NEW HANOVER COUNTY
REQUEST FOR BIDS
FOR SOUTH PROPERTY PARTIAL CLOSURE PHASE 2 (CELLS 7-10A)
RFB # 24-0379

Due to having received only two (2) bids by the bid deadline, New Hanover County is readvertising to
receive sealed bids by 2:00 p.m. on Friday, May 3, 2024, from qualified contractors for all labor and
materials to complete the work in accordance with the "Specifications and Contract Documents” for New
Hanover County Secure Landfill Partial Closure Phase 2 for New Hanover County, North Carolina, RFB #
24-0379. Bidder must have attended the mandatory pre-bid conference held on March 6, 2024, or
attend the 2nd opportunity for a mandatory pre-bid conference on Wednesday, April 24, 2024, at 2:00
p.m. in the Administration Building, 3002 Highway 421 North, Wilmington NC. Bid documents can be
obtained at the County’s website (https://www.nhcgov.com/bids.aspx).
This project will be the second partial closure of the South Property Landfill, consisting of a combination of
temporary and final landfill closure capping systems. The total closure area will be approximately 9 acres;
of which +/-2.4 acres are considered final closure area, and +/-6.6 acres are temporary (exposed cap)
measures. The Landfill areas identified for the second partial closure are the side slopes of Cells 7 through
10A. The proposed Cell 7&8A closure area is a continuation of the previously installed temporary closure
system and located on the north slope of the Landfill. The proposed Cell 9&10A closure areas are on the
eastern and western Landfill slopes. The project will include site preparation, placement of the liner systems,
placement of the soil cover systems, construction of the stormwater management structures, erosion control
structures, grading, seeding and sodding, landfill gas collection and control system expansion and all
incidentals necessary to complete the work as specified. The project also includes repairs to the existing
landfill closure of the North Property Landfill. See section 01000 and the plans for more complete details
about the work. The construction period will be 210 days from the notice to proceed issuance date to
substantial completion and an additional 30 days to final completion. Fill soil for the preparation of the
intermediate cover, protective cover and topsoil for the landfill partial closure shall be supplied from an offsite
borrow source by the CONTRACTOR.
A 2nd opportunity for the MANDATORY pre-bid conference will be held on Wednesday April 24,
2024, at 2:00 pm in the Recycling & Solid Waste Administration Building, 3002 Highway 421 North,
Wilmington, NC. Potential bidders who attended the first MANDATORY pre-bid conference on
March 6th, 2024, will not be required to attend this 2nd opportunity. A site visit will be offered.
Bids will be received until 2:00 p.m. on Friday, May 3, 2024, by New Hanover County, in the
Conference room at the New Hanover County Department of Recycling & Solid Waste Administration
Building, 3002 Highway 421 North, Wilmington, North Carolina 28401, at which time the proposals will
be publicly opened and read in accordance with the provisions of law. The deadline time shall be
established by the timepiece of New Hanover County's representative. No bids will be accepted after that
time.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS