Z--LARO SEVEN BAYS LIFT STATION REPAIRS

Awarded
140P8326Q0033Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract for LARO SEVEN BAYS LIFT STATION REPAIRS involves the rehabilitation and modernization of a wastewater lift station at Seven Bays Marina within the Lake Roosevelt National Recreation Area, located near Coulee Dam, Washington. Work includes replacing obsolete components with new, corrosion-resistant systems such as two 208V, 3-phase ABS Piranha PE45-2C submersible grinder pumps, a duplex 316 stainless steel guide rail system, stainless steel discharge piping connected to an existing 3-inch force main, a new float tree assembly with five level sensors, and epoxy-coating of the wet well interior using near-white metal surface preparation. All materials and equipment must be sourced externally and meet stringent environmental standards, including pressure cleaning prior to entry to prevent invasive species introduction. Operations are restricted to the existing wet well, with strict prohibitions on wildlife feeding, improper waste disposal, and any unapproved modifications. Restoration of any environmental damage caused during work is the contractor’s responsibility at no additional cost to the government, and hauling must comply with both state and park-specific load restrictions. Access to certain areas is controlled by a locked gate managed by a concessionaire and requires prior coordination with the Contracting Officer’s Representative. Performance must be completed within 45 days of receiving the Notice to Proceed, with delivery and acceptance occurring on-site at the lift station. The government is responsible for inspection and final acceptance, which requires all components—particularly pumps, guide rails, and piping—to meet or equal specified standards with no leaks, fully functional alarms, and reliable operation under normal conditions. The solicitation does not include pricing details or a stated contract value, and payment must be submitted electronically via the Invoice Processing Platform (IPP), not WAWF. Proposals must be submitted as a single PDF by June 5, 2026, to Michael Abner at [email hidden], and offerors must be enrolled in SAM with a valid UEI and CAGE code. The contract includes multiple FAR clauses supporting small business set-asides, including SDVOSB, WOSB, and economically disadvantaged women-owned small business programs, and requires adherence to nonmanufacturer rules and subcontracting limitations. A site visit is strongly recommended due to complex logistical and environmental constraints. The award will be made based on a trade-off process considering both price and technical capability, with past performance also evaluated, though no formal weighting or adjectival ratings are specified. All critical components require written COR approval

General Info

LARO Seven Bays Lift Station repair contract, small business set-aside, proposals due May 18, 2026.

Contract Value

$160,116.15

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

WA, USA

Set-Aside

NONE

Award Issued Date

Documents

19

Amendment 0001 Contractor Questions and Answers for Solicitation 140P8326Q0033

PDF, High priority: read this firstamendment
High

Amendment 0001 to Solicitation 140P8326Q0033

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 140P8326Q0033

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation 140P8326Q0033

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation 140P832600033

PDF, High priority: read this firstamendment
High

Attachment 10 Relevant Experience and Past Performance

DOCX, High priority: read this firstpast-performance
High

Attachment 11 Technical Approach

DOCX, High priority: read this firsttechnical-approach
High

Attachment_9_Wage_Determination_Washington_12-03-2025

PDF, High priority: read this firstwage-determination
High

FAR 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment

DOCX, High priority: read this firstfederal-acquisition-regulation-provision
High

PWS for Seven Bays Lift Station Repairs FY2026

PDF, High priority: read this firstsow
High

Seven Bays Marina Wastewater Treatment Operation and Maintenance Manual 1990

PDF, High priority: read this firstoperation-and-maintenance-manual
High

Solicitation 140P8326Q0033 Amendment 0004 Q&A

PDF, High priority: read this firstamendment
High

Solicitation 140P8326Q0033 - Seven Bays Lift Station Repairs RFQ

PDF, High priority: read this firstrfq
High

Attachment 1 As-Built Construction Drawings

PDF, Low priorityother
Low

Attachment 4 Seven Bays Reference Photos

PDF, Low priorityother
Low

Attachment 5 Seven Bays Lift Station Design Drawing

PDF, Low priorityother
Low

Attachment_7_ABS_Piranha_PE45-2C_Manual - Submersible Grinder Pump Manual

PDF, Low prioritymanual
Low

Attachment_3_Seven_Bays_Existing_Utility_Overview_Map.pdf

PDF

Attachment_6_Lift_Station_General_Location_Map.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseAwarded
Posted

Solicitation

Notice updated

The notice title changed.

Deadline changed

Response deadline changed from May 18, 2026 to Jun 4, 2026.

Notice updated

Response deadline changed from Jun 4, 2026 to Jun 5, 2026. The notice description changed.

Notice updated

Response deadline time changed from 10:00 PM UTC to 8:00 PM UTC on Jun 5, 2026. The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Pwr Olym MABO(83000)
Contacts1 person available
OfficePORT ANGELES, WA, 98362, USA
Office AddressPORT ANGELES, WA, 98362, USA

Full Description

Show more
LARO SEVEN BAYS LIFT STATION REPAIRS

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of The Interior → Pwr Olym MABO(83000)

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS