Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Las Piletas Ranch Habitat and Resiliency Improvement Project - Phase 2

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Las Piletas Ranch Habitat and Resiliency Improvement Project Phase 2, managed by the Upper Salinas Las Tablas Resource Conservation District, focuses on two primary restoration efforts in California to enhance habitat resilience and improve the Salinas River Watershed. The San Juan Unit involves the installation of water infrastructure to reduce cattle impact on riparian corridors, including the retrofit of one existing water well and the installation of one new solar-powered well. This unit will feature up to nine 5000-gallon storage tanks, 21 water troughs, and approximately 14 miles of 1.25 inch polypipe trenched 10 to 15 inches deep through oak woodlands and grasslands. These improvements support conservation grazing and the protection of listed species such as the Cammata Canyon Amole. The North Carrizo Unit targets 1200 acres of previously farmed land to reverse soil compaction and runoff issues. Restoration activities include re-contouring erosive features, mulching to increase organic matter, native seeding for shrub and grassland diversity, and the application of conservation grazing techniques to improve forage for pronghorn. The project is classified under NAICS code 237990 and has been granted a CEQA categorical exemption due to the minor nature of the ground disturbances and the significant environmental benefits provided. Administrative filings include a December 2025 environmental document filing fee paid to the California Department of Fish and Wildlife.

General Info

Habitat restoration in California via water infrastructure and soil improvement for watershed resilience.

Agency

California → Upper Salinas - Las Tablas Resource Conservation District (RCD)

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Upper Salinas - Las Tablas Resource Conservation District (RCD)
Contacts2 people available
OfficeN/A
Organization / Agency
California → Upper Salinas - Las Tablas Resource Conservation District (RCD)
Office AddressN/A
Contacts
Hailey LeurckProject Manager
Dillon BrookProject Associate

Full Description

Show more
Phase 2 of the Las Piletas Ranch Habitat Improvement and Resiliency Project is built from two focused restoration efforts across the property. Phase 1 of this work was funded by CDFW through a Watershed Restoration Grant and completed in March of 2025. The San Juan Unit work consists of retrofitting one existing water well with a solar pump, installing a new water well with a solar pump, solar panels, 5000-gallon poly plastic water tanks, and 425-gallon water troughs. In total, the project will install up to nine 5000-gallon water storage tanks, 21 new 425-gallon water troughs and approximately 14 miles of distribution pipe. The 1.25” polypipe water lines that will connect wells to tanks and troughs will be trenched at a depth of 10-15” through grasslands and oak woodlands. These efforts will provide off-channel water sources for cattle that will greatly reduce the impacts to the San Juan riparian corridor. This water distribution will build on conservation grazing practices that utilize Virtual Fence cattle management, which allows for improved grassland diversity, enhancement of sensitive habitat area,s and targeted grazing for listed plant species like the listed Cammata Canyon Amole. The restoration efforts on the North Carrizo Unit will pilot several restoration actions at targeted areas and have a nucleated response across 1200 acres of heavily manipulated farmland. The restoration efforts will be across two units that were dry farmed up until a few years ago, resulting in significant soil compaction, water runoff issues and an overall decrease in vegetative response. Restoration actions include re-contouring and repairs to erosive features, mulching of targeted areas to improved organic matter, conservation grazing techniques and native seeding to improve grassland diversity and shrub establishment. The efforts on the northern unit will increase the availability of forage species for pronghorn by improving water holding capacity and adding diversity to heavily manipulated farm fields. The proposed project will involve minor contouring, grading, trenching and backfilling with impacts of project implementation affecting annual grasslands.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
Lytton First Nation – Berm Construction
Solicitation # 24-3028C
Solicitation 24-3028C is for the construction of the Nohomeen Recovery Berm located at the Stein Subdivision in Stryen, Lytton, British Columbia, for the Lytton First Nation. The project involves significant earthworks and the installation of a retaining wall using lock block facing units with a minimum 28-day concrete strength of 20 MPa and a specific batter of 5 degrees. Key technical requirements include the use of Type I Engineered Fill and retained backfill, both compacted to 100 percent of the maximum density per ASTM D698 standards. The scope also includes the installation of 150mm perforated PVC toe and heel drains, vertical cleanouts, rodent guards, and a clear crush chimney drain, with NILEX 4545 non-woven geotextile required at soil interfaces. The project mandates strict environmental and cultural compliance, requiring adherence to Thompson-NOXLAND Regional District Bylaws and Department of Fisheries and Oceans Land Development Guidelines. Contractors must install silt fencing prior to excavation and ensure all soil removal is conducted by a company employing a qualified cultural assist. Quality assurance is managed through the Geotechnical Engineer of Record, who must approve the subgrade and wall bearing surface before wall construction begins. Additionally, the contractor is responsible for verifying wall batter every block course and limiting the use of heavy equipment to a minimum distance of 0.75 meters from the wall face. Responses to this solicitation are due by October 22, 2026.
Lytton First Nation

POSTED

1 day ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
SLED
Contract 26-2 Furnace Creek Tank Painting
Solicitation # Contract 26-2
The Womelsdorf-Robesonia Joint Authority is soliciting sealed bids for Contract 26-2, which involves the interior and exterior painting of the Furnace Creek Tank, a 1,500,000-gallon welded steel ground water storage tank measuring 68 feet in diameter and 56 feet in height. The scope of work includes foundation joint and crack repair, incidental weld repairs, and coordination with the contractor awarded Contract 26-1 for tank metals. All work is subject to oversight by a third-party paint inspector, and the project must be completed within 150 days from the Notice to Proceed. Bids must be submitted electronically via the PennBid program by 2:00 PM on October 21, 2026, and must include a bid bond or certified check for 10 percent of the bid price. This project is funded through a Penn VEST Drinking Water State Revolving Fund loan and must comply with the Build America, Buy America Act and American Iron and Steel requirements, meaning all iron, steel, and construction materials must be produced in the United States unless a waiver is granted. Additionally, the contract is subject to Davis-Bacon Wage Rates and requires various certifications, including Equal Employment Opportunity and Non-Segregated Facilities. Awarding will be based on the most advantageous bid. Once awarded, the contractor must provide performance and payment bonds within 15 days and submit a list of key personnel before starting construction. Payment is processed monthly via an Application for Payment reviewed by the Engineer.
Berks County

POSTED

2 days ago

DEADLINE

in 17 days
View Details
NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project is a civil and electrical construction solicitation issued by the City of Centerville, Ohio, with an engineer's estimate of $4,973,490.39. The scope of work includes the installation of conduits, structures, concrete drive aprons with curbs, seeding, mulching, and a design-build electrical component. The electrical portion requires the contractor to design and build the electrical service and associated conductors, including the installation of 22 decorative light fixtures, light pole bases, and specific connector kits. All work must adhere to the Ohio Building Code, N.E.C., N.F.P.A. Standard 70, and ODOT specifications, with a project completion date set for September 30, 2027. Bids are submitted as unit price proposals via Bid Express, with a final response deadline of October 13, 2026. The selection process evaluates the lowest and best bid based on project history, available resources, financial ability, and compliance with federal, state, and local laws, including Ohio Prevailing Wage and OSHA regulations. Required financial securities include a bid bond for the full amount of the bid or a 10 percent certified check, and a 100 percent performance bond upon award. Insurance requirements specify minimum coverage of $2,000,000 for Commercial General Liability, $1,000,000 for Auto, and $1,000,000 for Workers Compensation. Contract administration is managed by Oberer Construction Managers Ltd. on behalf of the City.
City of Centerville

POSTED

2 days ago

DEADLINE

in 9 days
View Details
NAICS: 237990
New
SLED
Pierpont Nuisance Sand Removal
Solicitation # P-130000901
The City of San Buenaventura is soliciting proposals for solicitation number P-130000901 to perform nuisance sand removal from City-owned portions of Pierpont Beach between San Pedro Lane and Greenock Lane. This recurring project occurs twice annually, once in May and once in November, to satisfy a legal Settlement Agreement. The scope of work involves grading, removing, and hauling excess beach sand from up to 27 beach access lanes and the frontage of up to 17 private properties. Contractors must excavate sand wedges to specified limits, ensuring they remain no deeper than 6 inches above structural footings with a slope no more than 1:1.75, and transport the material to designated deposit sites while avoiding the tidal zone. Proposals are due by October 20, 2026, at 4:00 PM PST, and must be submitted as a sealed hard copy to the Purchasing and Contracts Division in Ventura, California. The City will award the contract based on the perceived best fit and best value, evaluating proposals on a scale of 0.0 to 15.0. Key requirements include compliance with Cal-OSHA safety standards, the California Manual on Uniform Traffic Control Devices, and a Biological Resource Assessment. Additionally, state prevailing wages for Ventura County apply to all workers. While a faithful performance bond is not required, a bid security of at least 10 percent may be requested, and a 5 percent credit is available for qualified Small Local Businesses.
City of San Buenaventura

POSTED

2 days ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS