Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Las Piletas Ranch Habitat and Resiliency Improvement Project - Phase 2

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Phase 2 of the Las Piletas Ranch Habitat and Resiliency Improvement Project encompasses two distinct restoration efforts across the San Juan and North Carrizo Units in San Luis Obispo County, California, aimed at enhancing ecological resilience and reducing livestock impact on sensitive riparian areas. On the San Juan Unit, the project installs a solar-powered water system including a retrofitted and a newly constructed well, nine 5,000-gallon polyethylene water tanks, 21 425-gallon troughs, and approximately 14 miles of 1.25-inch polypipe distributed 10 to 15 inches below ground through grasslands and oak woodlands. This infrastructure enables off-channel water access for cattle, complementing Virtual Fence technology to guide grazing patterns that promote grassland diversity, protect sensitive plant species like the Cammata Canyon Amole, and alleviate pressure on the San Juan riparian corridor. The North Carrizo Unit, spanning 1,200 acres of former dry-farmed land suffering from soil compaction and runoff, will undergo restoration through re-contouring, erosion feature repair, mulching to increase organic matter, native seeding, and conservation grazing. These actions aim to restore hydrologic function, improve forage availability for pronghorn, and reestablish native shrubs and grasses that enhance overall habitat productivity. The project is led by the Upper Salinas - Las Tablas Resource Conservation District with support from The Nature Conservancy as the applicant, funded through a prior California Department of Fish and Wildlife Watershed Restoration Grant, and implemented under a CEQA categorical exemption (Class 4(a,c,d,f)) due to minimal ground disturbance and habitat enhancement outcomes. While the scope includes detailed specifications for water infrastructure and land treatment, no federal contract clauses, pricing details, acquisition codes, or formal evaluation criteria are stipulated. The work is site-specific with no defined delivery schedule or contract value provided, and responsibilities for oversight and acceptance rest with the RCD and CDFW, though no official COR, COTR, or PCO roles are designated. All equipment and installations are deployed on-site, with no packaging, marking, or preservation requirements outlined, reflecting a streamlined environmental restoration effort rather than a traditional federal procurement. Contact for project coordination is Hailey Leurck of the RCD, and all activities are grounded in state-level environmental compliance rather than federal acquisition regulations.

General Info

Solar-powered water system and land restoration in San Luis Obispo County to improve riparian health and pronghorn habitat.

Agency

California → Upper Salinas - Las Tablas Resource Conservation District (RCD)

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

California DFW Environmental Document Filing Fee Receipt 40-12292025-278

PDFproof-of-filing

CEQA Notice of Exemption for Las Piletas Ranch Habitat and Resiliency Improvement Project Phase 2

PDFceqa-notice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Upper Salinas - Las Tablas Resource Conservation District (RCD)
Contacts2 people available
OfficeN/A
Organization / Agency
California → Upper Salinas - Las Tablas Resource Conservation District (RCD)
Office AddressN/A
Contacts
Hailey LeurckProject Manager
Dillon BrookProject Associate

Full Description

Show more
Phase 2 of the Las Piletas Ranch Habitat Improvement and Resiliency Project is built from two focused restoration efforts across the property. Phase 1 of this work was funded by CDFW through a Watershed Restoration Grant and completed in March of 2025. The San Juan Unit work consists of retrofitting one existing water well with a solar pump, installing a new water well with a solar pump, solar panels, 5000-gallon poly plastic water tanks, and 425-gallon water troughs. In total, the project will install up to nine 5000-gallon water storage tanks, 21 new 425-gallon water troughs and approximately 14 miles of distribution pipe. The 1.25” polypipe water lines that will connect wells to tanks and troughs will be trenched at a depth of 10-15” through grasslands and oak woodlands. These efforts will provide off-channel water sources for cattle that will greatly reduce the impacts to the San Juan riparian corridor. This water distribution will build on conservation grazing practices that utilize Virtual Fence cattle management, which allows for improved grassland diversity, enhancement of sensitive habitat area,s and targeted grazing for listed plant species like the listed Cammata Canyon Amole. The restoration efforts on the North Carrizo Unit will pilot several restoration actions at targeted areas and have a nucleated response across 1200 acres of heavily manipulated farmland. The restoration efforts will be across two units that were dry farmed up until a few years ago, resulting in significant soil compaction, water runoff issues and an overall decrease in vegetative response. Restoration actions include re-contouring and repairs to erosive features, mulching of targeted areas to improved organic matter, conservation grazing techniques and native seeding to improve grassland diversity and shrub establishment. The efforts on the northern unit will increase the availability of forage species for pronghorn by improving water holding capacity and adding diversity to heavily manipulated farm fields. The proposed project will involve minor contouring, grading, trenching and backfilling with impacts of project implementation affecting annual grasslands.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is seeking contractors for the replacement of a culvert along 45th Avenue SW and the associated restoration of surrounding habitat, with the project located in King County, Washington. The solicitation, identified as 2025-017, is open to Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC, reflecting the city’s commitment to inclusive contracting practices. The work involves the removal of the existing infrastructure and installation of a new culvert system designed to improve water flow and structural integrity, while simultaneously restoring natural habitat features to support local ecosystems. The project is classified under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, and the prime contractor is Shimmick Construction Company, Inc., which manages the solicitation process and serves as the point of contact for inquiries. The response deadline is August 12, 2026, with Jamie Miranda listed as the primary contact for all communications, reachable at 707-410-5070 or jmiranda@shimmick.com. While the physical location is in Seattle, no specific street address or zip code is provided in the data, and all performance is expected to occur within the state of Washington.
Shimmick Construction Company, Inc

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.
City of Calgary

POSTED

about 14 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
27003-B Solids Removal
Solicitation # PE-65600-NONST-2027-000000250
Fayette County, Georgia is soliciting bids for the dredging and solids removal from lagoons under solicitation number PE-65600-NONST-2027-000000250, titled 27003-B Solids Removal. Interested contractors must submit their proposals by 3:00 p.m. on Tuesday, September 8, 2026, to the Purchasing Department located at 140 Stonewall Avenue West, Suite 204, Fayetteville, GA 30214. The opportunity is open to all qualified bidders without specific set-aside restrictions, and all bids must comply with the detailed requirements outlined in the attached Invitation to Bid document. The work will be performed within Fayette County, Georgia, and the county anticipates selecting a contractor capable of safely and efficiently removing accumulated solids to maintain lagoon functionality and regulatory compliance. All questions regarding the bid should be directed to Colette Cobb, the primary point of contact, via email at ccobb@fayettecountyga.gov or by phone at 770-305-5115. The solicitation was posted on August 7, 2026, and additional information, including full bid documents, can be accessed through the official state procurement portal using the provided UI link. Contractors are responsible for reviewing all documentation thoroughly prior to submission, as failure to meet specifications or deadlines may result in bid rejection. The county reserves the right to accept or reject any or all bids without explanation, and award decisions will be made based on compliance, competitive pricing, and demonstrated technical capability.
Fayette County Board of Commissioners

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Fern Ridge Wildlife Area Coyote Creek Boating Access
Solicitation # S-63500-00017424
The Oregon Department of Fish and Wildlife is soliciting bids for the construction of a boating access facility at Coyote Creek within the Fern Ridge Wildlife Area under solicitation number S-63500-00017424. The project involves a range of civil and infrastructure construction activities including earthwork, driving steel piles, installing a paddle craft launch dock, sheet piling, storm drain piping and conveyance systems, aggregate base placement, concrete curbing and sidewalk construction, and asphalt paving. All work must be completed in accordance with specifications to ensure safe and durable access for recreational boating users. The solicitation is open to qualified contractors with no specific set aside identified and is managed through the state agency’s procurement system. Responses are due by September 3, 2026, at 11:00 PM Pacific Time, with the request publicly posted on August 7, 2026. The contract will be managed by the Oregon Department of Fish and Wildlife based in Salem, Oregon, with Claire Duvall listed as the primary point of contact. The place of performance is located in Salem, Oregon, and all work must be carried out at the designated site within the Fern Ridge Wildlife Area. Contractors are expected to comply with all state and federal regulations governing construction in protected wildlife areas, and full details are accessible through the provided online portal.
ODFW

POSTED

about 19 hours ago

DEADLINE

in 26 days
View Details