Laser Induced Desorption System for Measuring First Wall Retention in STEP

Awarded
PP-UKFE-142International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

UK Fusion Energy Ltd, a subsidiary of the United Kingdom Atomic Energy Authority, has awarded a contract to IDOM Consulting, Engineering, Architecture S.A.U. for the concept design of a laser-induced desorption system. This system is intended for the Spherical Tokamak for Energy Production programme, which is the UK's flagship initiative sponsored by the Department for Energy Security and Net Zero to develop a prototype fusion power plant capable of net energy production and fuel self-sufficiency. The primary objective of the system is the in-situ quantification of tritium retention within plasma-facing first wall materials, a critical requirement for tritium accountancy and monitoring material conditions. The project requires a design capable of functioning under extreme conditions, including high neutron radiation, strong magnetic fields, thermal loading, and limited installation space. This initial concept design phase, valued at 73,720 pounds excluding VAT, is scheduled to run from October 8, 2026, to March 31, 2027. The resulting outputs are expected to guide future detailed design, technology maturation, and testing efforts to eventually deploy an integrated tritium measurement system within the STEP tokamak.

General Info

IDOM will design a laser-induced desorption system for UK Fusion Energy's STEP programme.

Agency

UK Fusion Energy LtdView Agency

Contract Value

$0

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

GBR

Set-Aside

NONE

Awardee

IDOM Consulting, Engineering, Architecture S.A.UView Profile

Award Issued Date

Documents

(1)

2026/S 000-087860 - Laser Induced Desorption System for STEP

PDFaward

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUK Fusion Energy Ltd
Contacts1 person available
OfficeN/A
Organization / Agency
UK Fusion Energy Ltd
View Agency Profile
Office AddressN/A
Contacts
Operational Procurement

Full Description

Show more
UK Fusion Energy Ltd (UKFE) is seeking to appoint a supplier to undertake the concept design of a system capable of in-situ quantification of tritium retention within plasma-facing (first wall) materials for the Spherical Tokamak for Energy Production (STEP) programme. STEP is the UK's flagship fusion energy programme, sponsored by the Department for Energy Security and Net Zero (DESNZ), and aims to design and construct the UK's first prototype fusion power plant capable of demonstrating net energy production, fuel self-sufficiency and a viable route to plant maintenance. UKFE, a wholly owned subsidiary of the United Kingdom Atomic Energy Authority (UKAEA), is responsible for delivering the programme. A key challenge for future fusion power plants is the management of tritium, which serves as a fuel for the deuterium-tritium fusion reaction. Tritium is both radioactive and scarce, making accurate measurement of its retention within plasma-facing components essential to demonstrating fuel self-sufficiency, supporting tritium accountancy, and monitoring the condition of first wall materials throughout plant operation. The successful supplier will develop a concept design for a measurement system capable of operating within the demanding environment of a fusion power plant, taking into account constraints such as neutron radiation, strong magnetic fields, thermal loading, limited installation space, and exposure to radioactive materials. This procurement represents the initial concept design phase of a wider programme of work. Subject to future funding and programme approvals, the outputs of this contract are expected to inform subsequent detailed design activities, technology maturation, de-risking and testing, and ultimately the development of an integrated tritium measurement system for deployment within the STEP tokamak.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is soliciting sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing utility locating and potholing, geotechnical and geophysical investigations, LIDAR surveying, and comprehensive engineering support across civil, structural, mechanical, electrical, and instrumentation and controls disciplines. Additional requirements include BIM/3D modeling, commissioning and startup planning, environmental assessments, permitting support, hazardous materials surveys, and CPM scheduling. This opportunity is specifically targeting qualified Disadvantaged Business Enterprises, including Minority, Women, and Other Business Enterprises. Interested firms must contact Lead Estimator Joe Bockelman to receive an Invitation to Bid through the Building Connected electronic system. The bid deadline is September 11, 2026. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the bond premiums. Kiewit, as a signatory to multiple collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. Plans and specifications are available for review at the Kiewit office in Costa Mesa, California.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity sewer mainline and installing service laterals to decommission existing residential pump stations. The scope of work includes infrastructure extensions from the Cinder Lane and McMullin Drive intersection to the Poplar Street and Lodgepole Drive intersection, including the Tara Lane and Melody Lane cul-de-sacs, and may include minor transportation improvements such as a mini roundabout or turn lane. The project is funded by the Clean Water State Revolving Fund through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The selection process is based on a scoring system evaluating project understanding, team qualifications, and firm experience, with a potential optional interview. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall/Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority, and women-owned businesses. The response deadline for this opportunity is September 29, 2026.
Parametrix

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 541330
New
College Park East Stormwater Infrastructure Design Services - Seal Beach, CA
Solicitation # CIP SD2601
The City of Seal Beach is soliciting professional engineering and environmental design services for the College Park East Stormwater Infrastructure Project (CIP SD2601) to mitigate chronic flooding and improve water quality. The selected consultant will be responsible for advancing the project to a shovel-ready phase, which includes a comparative evaluation of pump station siting alternatives at Ironwood and Aster Park, the development of 60, 90, and 100 percent plans, specifications, and estimates, and the management of CEQA and NEPA environmental reviews. The project involves the replacement of storm drain lines, culverts, and catch basins, as well as the design of a stormwater pump station and retarding basins. This procurement is funded in part by a U.S. EPA Community Project Funding award, requiring strict adherence to federal procurement standards under 2 CFR Part 200, including drug-free workplace certifications and non-discrimination compliance. Selection is based on a qualifications-based process consistent with the Brooks Act and California Government Code, with evaluation weights focused on scope understanding (40 percent), team qualifications (25 percent), and project approach (25 percent). The contract is estimated at 1.3 million dollars and will be administered on a time-and-materials basis with a not-to-exceed total. Key deliverables include a detailed work plan, monthly progress reports, and final design documents provided in electronic formats. The consultant must comply with California Labor Code prevailing wage requirements and maintain comprehensive general liability, workers compensation, and disability insurance. Proposals were due by September 22, 2026, with an estimated notice to proceed occurring eight weeks after the submittal deadline.
PACIFIC Advanced Civil Engineering, Inc.

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS