Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 27, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Launch Dock for Abiquiu Dam

Awarded
W912PP18Q0112Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 1 hour ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 2 hours ago

DEADLINE

in 25 days
NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 4 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

This 8(a) Sole Source Set-Aside contract, awarded by the Department of Defense through the USACE Endist Albuquerque, requires the contractor to replace a damaged launch dock near the boat ramp area of the Abiquiu Lake Project. The scope of work includes the removal of the existing dock and the provision and installation of a new 10 by 60 foot floating launch dock and a 4 by 24 foot ADA-compliant gangway. The contractor is responsible for all labor, materials, equipment, and supervision necessary to complete the project, including coordinating all activities with the Lake Manager. The new dock must feature a hot-dip galvanized steel frame, wood polymer composite decking, roto-molded polyethylene floats, and a comprehensive fendering and bumper system. Technical requirements include a minimum live load rating of 25 pounds per square foot and the installation of eight galvanized steel boat cleats. Additionally, the contractor must install two new winches and ensure the dock is properly secured, either by reusing existing mushroom anchors or installing a new anchoring system at their own expense. The project concludes with the installation of the ADA-compliant gangway, complete with matching composite decking and all necessary operational hardware.

General Info

Contract Value

$147,007.95

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

NM, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Albuquerque
Contacts1 person available
OfficeALBUQUERQUE, NM, 87109-3435, USA
Office AddressALBUQUERQUE, NM, 87109-3435, USA
Contacts
Glenda D. KohlieberContract Specialist

Full Description

Show more
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. In accordance with these specifications the Contractor shall supply all plant, labor, materials, appurtenances, heavy equipment, shop facilities, supervision, tools, staging, scaffolding and any other items necessary to complete the herein detailed dock replacement near the boat ramp area of the Abiquiu Lake Project. The Contractor shall remove the existing damaged launch dock located south of the Abiquiu Lake Boat Ramp, and provide and install a new fully functional floating 10' x 60' launch dock with 4' x 24' ADA compliant gangway. Specifically, the Contractor shall: 1.Remove the old/damaged dock a.The Contractor shall provide all hand tools, equipment, and licensed equipment operators as necessary to remove existing dock from Abiquiu Lake (10' x 60' launch dock of similar design to new) and place on USACE trailer for transport away from the installation site. Should removal require a crane, the Contractor shall provide a licensed crane operator, determine whether the lift is considered a critical lift, and provide a lift plan in the Accident Prevention Plan as required by EM 385-1-1. All delivery, removal, and installation actions shall be coordinated with the Lake Manager a minimum of ten (10) days in advance. 2.Construct the new dock a.Frame. The new dock shall have a 17.5" deep galvanized steel frame box truss design, and all structural members (side chords and ends) shall be a minimum of 2" x 2" x 0.25" galvanized steel angle. All other members shall be minimum 1.5" x 1.5" x 0.1875" galvanized steel angle. All steel components shall be hot-dip galvanized after fabrication. b.Decking. The Contractor shall provide and install new wood polymer composite 2" x 6" transverse decking attached to the frame on 2' maximum spans. Decking shall sit between 19" and 22" above the waterline. c.Floats. The contractor shall provide and install new floats bolted firmly to the dock frame below the decking floor. Floats shall be roto-molded polyethylene shell (minimum nominal wall thickness 0.15") with polystyrene block molded inside the shell. d.Fendering System. The new dock shall have a fendering system that includes, at a minimum, a double row of 3" x 12" treated lumber around the perimeter of the dock. e.Bumpers. The Contractor shall provide and install corner bumpers on the outside corners and cushion bumper along the perimeter of the dock. Side bumpers shall be Cruiser Cushion Bumpering System or approved equal mounted on the perimeter fendering system of the dock. The Contractor shall also provide one additional replacement Cruiser Cushion bumpering system or approved equal cushion bumpering system with installation hardware. f.Mooring Devices. The Contractor shall provide and install a minimum of 8 cleats properly spaced around the outer top-edge of the new dock. Cleats shall be 12" galvanized steel boat cleats. g.Loading Requirement. The new dock shall be rated for a minimum of 25 pounds per square foot live load. 3.Deliver and install the new dock a.Delivery. The Contractor shall provide all shipping, handling, and freight necessary to deliver and install the new dock to the launch location at Abiquiu Lake. b.Existing Anchors for Reuse. The Contractor shall install the new dock per manufacturer's recommendations. There are two (2) existing 500lb mushroom anchors spaced approximately 100' feet apart with 100' of " cable attached, and approximately 200' of 5/8" cable attached to shore columns. In the event that the new dock is not compatible with the existing anchoring system, the Contractor shall install a new anchoring system with all appurtenant cables, anchors, shore columns at the Contractor's expense. The newly installed dock shall float evenly on the water surface. c.Winches. The Contractor shall provide and install two (2) new LM 16 Wintech winches, or approved equal. Winches shall have a 16" wide drum, two-speed gear system, and shall be elevated on a stand with a multi-directional fairlead. 4.Deliver and install ADA-compliant gangway to connect launch dock to shoreline a.Delivery. The Contractor shall provide all shipping, handling, and freight necessary to deliver the gangway to the launch location at Abiquiu Lake. b.Gangway. The Contractor shall provide and install an ADA-compliant 4' x 24' galvanized steel frame gangway. The gangway shall have composite decking to match the new dock and all necessary rollers, treadplates, wheels, and bridge floats necessary for operation per the manufacturer's recommendations. The Contractor shall appropriately secure the gangway between the shore and the new dock.

More opportunities from Department Of Defense → W075 Endist Albuquerque

Same awarding agency

NAICS: 237310
New
Federal
Special Notice - Announcement of Industry Day - Progressive Design-Build (PDB) Other Transaction (OT) for FY28 High Speed Test Track, Holloman Air Force Base, Otero County, Mexico
Solicitation # W912PP27Z1CUU
The U.S. Army Corps of Engineers, Albuquerque District, is issuing a special notice for a Progressive Design-Build Other Transaction agreement under the authority of 10 U.S.C. 2808a for the FY28 High Speed Test Track at Holloman Air Force Base in Otero County, New Mexico. This Firm-Fixed-Price project focuses on the repair and upgrade of critical infrastructure, including girder repair and restoration, the replacement of 3,963 linear meters of track connection tie-down points, the widening and replacement of STAPP East and West access roads, and repairs to the Camera Pad Road. The completed track must maintain an operational lifespan of at least ten years beyond construction. The procurement will follow a streamlined, two-step competitive selection process to identify the most qualified progressive design-build entity. In the first step, interested parties must submit a Statement of Qualifications, and up to three selected companies will proceed to the second step, which consists of pitch meetings. The project is structured into two phases: Phase 1 covers design and pre-construction services, while Phase 2 encompasses final design and construction. Cybersecurity Maturity Model Certification requirements will be determined based on guidance available during the first step of the request. Interested parties are advised to monitor sam.gov for the official solicitation announcement and complete proposal instructions.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 14 days
View Details
NAICS: 236220
Federal
REQUEST FOR INFORMATION/SOURCES SOUGHT
Solicitation # W912PP27RA003
The U.S. Army Corps of Engineers Albuquerque District is conducting a sources sought market survey for the construction of the Space Rapids Capabilities Office at Kirtland Air Force Base in New Mexico. This preliminary planning effort seeks to identify qualified industry sources for a competitive, firm-fixed-price, design-bid-build contract. The project involves the construction of a 67,833 square foot, two-story facility featuring controlled office spaces, a 200-seat auditorium, and specialized infrastructure including reinforced foundations and secure communications. The estimated construction value is between 50 million and 100 million dollars, with an anticipated solicitation issuance date around April 22, 2027. Key requirements for the project include compliance with Department of Defense antiterrorism and force protection standards, as well as Unified Facilities Criteria for permanent construction. The facility must support controlled networks and accreditation with physical and electronic security measures. Prospective prime contractors must demonstrate experience with ICD 705 and AV/ESS requirements, the design-bid-build process, and federal antiterrorism provisions. Additionally, the scope includes the installation of a LenelS2 OnGuard alarm system, requiring all contracted personnel to hold a Secret security clearance and adhere to DD Form 254 specifications. The government is also soliciting feedback on the potential use of Project Labor Agreements for this large-scale effort.
Commercial and Institutional Building Construction

POSTED

10 days ago

DEADLINE

in 7 days
View Details
NAICS: 541330
Federal
Combined Synopsis/Solicitation for; W912PP25RA009 INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ), MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR CIVIL WORKS PLANNING STUDIES AND ASSOCIATED DESIGN ARCHITECT-ENGINEER (A-E) SERVICES, ALBUQUERQUE DISTRICT, N
Solicitation # W912PP25RA009
Solicitation W912PP25RA009 is an Indefinite-Delivery, Indefinite-Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Civil Works planning studies and associated Architect-Engineer (A-E) services supporting the U.S. Army Corps of Engineers (USACE) Albuquerque District. The contract covers a regional area of operations spanning New Mexico, Southern Colorado, and Southwest Texas. With a shared capacity of 49.9 million dollars, the government intends to award contracts to five to seven firms across unrestricted and small business reserve pools. The scope of work includes interdisciplinary design, hydrologic and hydraulic analysis, river modeling, and construction support for water resource structures such as dams and levees. Selection is based on professional qualifications per the Selection of Architects and Engineers Statute, with a primary focus on specialized experience in flood control studies within the Albuquerque District. Evaluation criteria include professional qualifications, past performance over the last seven years, capacity to execute simultaneous task orders, and knowledge of the locality. Minimum requirements include proficiency in AutoCAD Civil 3D, ESRI products, and familiarity with USACE Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE). Offerors must submit a complete SF330 via the Procurement Integrated Enterprise Environment (PIEE) portal by November 6, 2026.
Engineering Services

POSTED

13 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS