Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Launchpad Infrastructure Project

Open
INL-27-008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Idaho National Laboratory (INL), under the Battelle Energy Alliance for the Department of Energy, is seeking Expressions of Interest (EOI) for the Launchpad Infrastructure Project. This effort is for market research and planning purposes to identify qualified contractors and assess regional capacity for a project anticipated to begin in March or April 2027. The projected scope of work includes the construction of approximately 2 to 3 miles of two-lane roadway, the installation of 2 to 3 miles of water main, the routing of 3 miles of fiber conduit and handholes, and potentially 1 mile of chip seal roadway improvements. Due to programmatic requirements, the project will operate under a compressed schedule, requiring contractors with significant resource capacity and schedule flexibility. Interested firms must demonstrate experience in civil infrastructure, the ability to manage multiple concurrent work scopes, and the capacity to operate within a secure, safety-focused environment in compliance with federal, state, and local regulations. Responses must be submitted electronically to Chase Egbert by the end of the business day on January 15, 2027. Submissions should include company capabilities, relevant experience, resource availability for the 2027 timeframe, and any identified risks or constraints. This EOI does not constitute a formal solicitation or a commitment to award a contract, and there is no specified set-aside status for this opportunity.

General Info

INL seeks expressions of interest for a 2027 civil infrastructure construction project.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

ID, 83415, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfi
High

Read the document

Due in 52 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 52 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Battelle Energy Alliance–doe Cntr
Contacts1 person available
OfficeIdaho Falls, ID, 83415, USA

Full Description

Show more

Overview


The Idaho National Laboratory (INL) is seeking Expressions of Interest (EOI) from qualified contractors, construction firms, and infrastructure service providers capable of supporting a forthcoming infrastructure development project known as the Launchpad Infrastructure Project. This EOI is being issued for market research purposes only to identify capable organizations, assess regional capacity, and better understand the availability of qualified resources to execute the work within an accelerated project schedule. Responses will help INL evaluate supplier interest, experience, and capability prior to any future procurement activities.


Project Description


The Launchpad Infrastructure Project is anticipated to support future site development activities through the installation and construction of critical infrastructure components. The project may include but is not limited to the following:


  • Construction of approximately 2 to 3 miles of 2 lane roadway
  • Installation of approximately 2 to 3 miles of water main
  • Installation and routing of approximately 3 miles of fiber conduit and handholes
  • Potential construction of approximately 1 mile of chip seal roadway improvements

The final scope, quantities, and project requirements are subject to change as planning and design efforts progress.


Anticipated Schedule


INL currently anticipates project mobilization and construction activities to begin in March or April 2027. Due to programmatic requirements, the project is expected to operate under a compressed schedule, making contractor availability, resource capacity, and schedule flexibility key considerations.


Requested Information


Interested organizations are requested to provide the following information:


  1. Company name and primary point of contact.
  2. Brief description of company capabilities relevant to the anticipated scope.
  3. Experience performing similar infrastructure projects involving roadway construction, utility installation, and/or fiber optic infrastructure.
  4. Description of available resources, personnel, equipment, and subcontractor relationships that could support a project of this size and schedule.
  5. Confirmation of anticipated availability during the March-April 2027 timeframe.
  6. Identification of any specialized expertise related to:
    • Roadway construction
    • Water utility installation
    • Fiber optic infrastructure installation
    • Chip sealing operations
  7. Any potential constraints, risks, or schedule considerations that may impact project execution.

Minimum Qualifications


Interested organizations should be able to demonstrate:


  • Relevant experience performing comparable civil infrastructure projects.
  • Ability to manage multiple infrastructure work scopes concurrently.
  • Adequate staffing, equipment, and project management resources to support an accelerated schedule.
  • Compliance with applicable federal, state, and local regulations.
  • Ability to perform work within a secure and safety-focused operating environment.

Important Notice


This EOI is issued for planning and market research purposes only and does not constitute a solicitation or commitment by INL to award a contract. Any future procurement related to this effort will be announced through appropriate procurement channels.


Response Deadline


Interested parties are requested to submit their responses no later than end of business day January 15th, 2027.


Submission Instructions


Please submit responses electronically to:


Chase Egbert
Sign up to see this detail


Questions regarding this EOI may be directed to the contact listed above.



PROPRIETARY INFORMATION


Because information received in response to this EOI may be business sensitive or proprietary to the responding party, respondents must mark information in their responses accordingly.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Federal
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
New
SLED
US97 WIM SENSOR AND PAVEMENT REPLACEMENT PROJECT (Klamath Falls)
Solicitation # S-73000-00018455
The US97 WIM Sensor and Pavement Replacement Project is a solicitation by the Oregon Department of Transportation for infrastructure work in Klamath County, Oregon. The scope of work includes the removal of existing PCC and AC pavement and its replacement with new pavement sections, the installation of Weigh In Motion (WIM) equipment and ITS electrical systems, and the application of permanent pavement markings. The project also requires the implementation of temporary traffic control and the maintenance of Temporary Pedestrian Accessible Routes (TPAR) to ensure pedestrian safety. Technical requirements include strict labeling and marking of cables and wiring, the use of compressed air to clear conduits, and adherence to 2024 Oregon Standard Specifications for Construction, UL, and IMSA standards. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, determined via a combination of lump sum and unit pricing. Bidders must provide bid security equal to 10% of the bid amount and, upon award, must furnish performance and payment bonds and proof of insurance. The project is subject to Oregon Bureau of Labor and Industries prevailing wage rates and the State Buy America domestic preference requirements, necessitating that all steel, iron, and manufactured products used in permanent structures be produced in the United States. Bids must be submitted electronically via OregonBuys by the deadline of December 10, 2026. There is no set-aside status specified for this solicitation.
Department of Transportation

POSTED

about 8 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237310
New
SLED
26/27-03-ECS Goodpasture Covered Bridge Seismic Retrofit and Wildfire Mitigation
Solicitation # 26/27-03-ECS
The 26/27-03-ECS solicitation is a project for the Goodpasture Covered Bridge Seismic Retrofit and Wildfire Mitigation, managed by the Lane County, OR Engineering & Construction Services (ECS) Division. The scope of work involves technical improvements to the bridge, including connection strengthening and ensuring no rise in water surface elevation to meet FEMA No-Rise Certification requirements. The project is subject to Build America Buy America requirements, ADA compliance for pedestrian access routes, and strict safety clearances of 10 feet from energized power lines. Bidders must be registered with the Oregon Construction Contractors Board or licensed by the State Landscape Contractors Board and must comply with Oregon prevailing wage laws. Award evaluation is based on the bidder's compliance with public bidding procedures, resource capability, performance and integrity records, and legal qualifications. Bidders must provide a bid guaranty for 10% of the bid amount and submit a first-tier subcontractor disclosure within two hours of the bid closing. The contract requires a performance bond and a payment bond, with a specific requirement that first-tier subcontractors be paid within 10 calendar days of satisfactory performance. Bids are submitted via Bid Express using AASHTOWare Project Bids software or as paper bids printed from the ODOT eBIDS website. There is no set-aside status for this solicitation.
Lane County, OR - Engineering & Construction Services (ECS) Division

POSTED

about 13 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
New
International
Golden Ears Park - South Beach - Accessibility Ramp Construction
Solicitation # CP27LME0003
The Golden Ears Park South Beach Accessibility Upgrades project is a Major Works Contract issued by the Ministry of Environment and Parks for the Province of British Columbia. The scope of work involves the construction of an accessibility ramp and associated upgrades at Golden Ears Provincial Park, including asphalt removal, subgrade preparation, the installation of an asphalt ramp, concrete sidewalks, aluminum handrails, and tactile warning mats. Additional deliverables include the installation of blast rock wall boulders, rip rap stormwater outflow, and provisional work for a washroom path. The project requires strict adherence to technical standards, such as the Master Municipal Specification for hot mix asphalt and the Canadian Landscape Standard, with a mandatory completion date of March 15, 2027, and substantial performance required by March 31, 2027. The contract is governed by a set of comprehensive legal and safety requirements, including a Prime Contractor Agreement and strict compliance with the Workers Compensation Act and WorkSafe BC regulations. Financial terms include a ten percent holdback on progress payments, with an additional five percent held for the warranty period if no performance bond is provided. Contractors may provide cash security or a performance bond totaling at least 50 percent of the contract price. The agreement includes a one-year warranty period following the certification of total performance. There is no specific set-aside status designated for this solicitation.
Ministry of Environment and Parks

POSTED

about 14 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
8800
Solicitation # 8800
The City of St. Louis Board of Public Service is soliciting bids for the removal and replacement of the Southwest and Columbia Bridges in Missouri. The scope of work includes the installation of electrical and pedestrian infrastructure, specifically 2-inch and 3-inch conduits and ADA-compliant pushbutton detectors with integrated audible pedestrian systems. All sidewalk and curb replacements must adhere to ADA requirements, and APS equipment must comply with the MUTCD 11th Edition. The project requires strict adherence to material standards, including various ASTM specifications for reinforcing bars and galvanized coatings, and mandates that all professional engineering submittals be signed and sealed by a Professional Engineer registered in the State of Missouri. Bidders must submit proposals electronically via the Bid Express Online Portal by November 10, 2026. The submission process is divided into three sections, with initial bid documents due immediately and DBE-related documentation due three days after the bid. Key requirements include a bid deposit of 5% of the total base bid, performance and payment bonds from a surety with an A- or better rating, and compliance with the Davis-Bacon and Related Act for prevailing wages. Additionally, the awarded contractor and its subcontractors must provide ten-hour OSHA training. This solicitation is not a set-aside.
City of St. Louis Board of Public Service

POSTED

about 14 hours ago

DEADLINE

in 13 days
View Details

More opportunities from Department Of Energy → Battelle Energy Alliance–doe Cntr

Same awarding agency

NAICS: 334519
New
Federal
ATR Plant Protection System (PPS) Seismic Switch Replacement
Solicitation # INL-27-002
Battelle Energy Alliance, LLC (BEA), acting as the management and operating contractor for the U.S. Department of Energy-owned Idaho National Laboratory (INL), has issued an Expression of Interest (EOI) for the replacement of obsolete Kinemetrics Model TS-3A seismic switches within the Advanced Test Reactor (ATR) Plant Protection System (PPS). This EOI is intended for market research and acquisition planning to identify qualified suppliers capable of providing modern, safety-related seismic switch equipment. The required solution must feature three-axis ground motion sensing, dry contact output, adjustable trip setpoints, and in-situ testing and calibration capabilities to ensure the long-term reliability of the reactor protection function. Suppliers must demonstrate the ability to meet strict nuclear safety standards, including environmental and seismic qualifications per IEEE 323 and IEEE 344, and maintain a Quality Assurance Program consistent with ASME NQA-1 or equivalent controls. Key deliverables include complete seismic switch assemblies, mounting hardware, qualification reports, and comprehensive maintenance and installation documentation. Interested organizations must submit a concise PDF response, limited to approximately 10 pages, detailing their technical capabilities, relevant experience, and manufacturing lead times. Responses are due by April 23, 2027, and should be submitted to Chase Egbert and Stacey Hill. This notice is for research purposes and does not constitute a formal solicitation or a commitment to procure services.
Other Measuring and Controlling Device Manufacturing

POSTED

1 day ago

DEADLINE

in 5 months
View Details
NAICS: 335910
Federal
Long-Duration Energy Storage (LDES) Battery System
Solicitation # INL-26-050
Idaho National Laboratory (INL) and Argonne National Laboratory (ANL) are seeking information from organizations capable of providing non-lithium, rechargeable electrochemical long-duration energy storage (LDES) battery systems for benchmark performance testing. The requirement specifies two module-scale systems providing at least 10 kW continuous power and 100 kWh usable energy, and one full-scale system providing at least 100 kW continuous power and 1,000 kWh usable energy. All systems must be capable of at least 10 hours of continuous discharge at rated power, operate between 0 to 50 degrees Celsius with minimal performance loss, and have an estimated field lifetime of at least 15 years. Systems must include AC/DC interfaces, support SCADA protocols such as Modbus TCP/IP, DNP3, or IEC 61850, and comply with NFPA 855, UL 9540/9540A, and NEC/IEEE standards. This Expression of Interest (EOI) serves as a preliminary step to identify qualified vendors for a future Request for Proposal (RFP). Interested respondents must submit a consolidated PDF or Word document by December 8, 2026, including detailed technology descriptions, safety hazard assessments, performance data, indicative pricing, and a project schedule. Deliverables include the delivery of modules to INL within approximately three months of design acceptance and the full-scale system to ANL within approximately six months, followed by onsite commissioning and Site Acceptance Testing (SAT). There is no set-aside status specified for this opportunity.
Battery Manufacturing

POSTED

8 days ago

DEADLINE

in 14 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS