Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from South Carolina was posted on August 1, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Laurel Grove Drainage Improvement Project

Closed
IFB #26014State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in 2 months

DEADLINE

in 2 months

AI Contract Overview

Show more

The Laurel Grove Drainage Improvement Project, located on Anderson Ridge Road and within the Laurel Grove Subdivision in Greenville, South Carolina, aims to enhance the area's stormwater management system. The project involves removing existing trees, fences, and pavement to facilitate the installation of new storm drainage lines and catch basins. Additional site stabilization measures include installing energy dissipaters, rip rap at pipe outfalls, inlet protections, and performing fine grading and grassing on all disturbed areas to ensure proper drainage and prevent erosion. The contractor is responsible for safeguarding public safety and protecting County infrastructure, utilities, and private properties throughout the construction process. This solicitation, identified as IFB #26014, was posted on August 1, 2025, with a response deadline of August 26, 2025. The project is managed by Greenville County's Engineering & Maintenance Division under the NAICS code 237310, with a contract value estimated between $500,000 and $1,500,000. Interested contractors can contact Anthony Dawson via email or phone for further details. The project underscores Greenville County’s commitment to improving local infrastructure and ensuring environmental and community safety during construction.

General Info

Agency

South Carolina → Greenville County Engineering & Maintenance DivisionView Agency

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

SC, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Carolina → Greenville County Engineering & Maintenance Division
Contacts1 person available
OfficeN/A
Organization / Agency
South Carolina → Greenville County Engineering & Maintenance Division
View Agency Profile
Office AddressN/A

Full Description

Show more
The project site is located on Anderson Ridge Road (H-0165) and in the Laurel Grove Subdivision off South Bennetts Bridge Road in Greenville, South Carolina. The project site occupies land on the County right of way and on private properties. The contractor shall take all the necessary measures to ensure the safety of the public and prevent damage to County roads/infrastructure, utilities, and private property. The main purpose of the project is to improve the drainage system. The work consists of the demolition/removal of trees, fences and pavement and the installation of new storm drainage lines and catch basins. Site stabilization shall include placing a new energy dissipater and rip rap at the pipe outfall, placing inlet protection at new catch basins and pipe inlets, fine grading, and grassing of all disturbed areas.