LAX Transpacific Cable Landing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The LAX Transpacific Cable Landing Project involves the development of undersea fiber optic telecommunications cable landing infrastructure at Dockweiler State Beach in Los Angeles, California, with the capacity to support up to four future submarine cable systems. The project, to be executed by Hood 1703, LLC, includes the installation of four offshore horizontal directional drilling (HDD) bore pipes extending approximately 4,000 feet into Santa Monica Bay, two beach manholes located 400 feet landward of the mean high water line, up to four ocean ground beds at the beach site, one HDD bore connecting a beach manhole to the intersection of Imperial Highway and Vista Del Mar, and approximately four miles of open-trenched terrestrial conduit running through public rights-of-way in Los Angeles and El Segundo to connect to existing data centers. Although no submarine cables will be deployed during this initial phase, the environmental review comprehensively evaluates potential impacts of future cable installations, including regenerators and associated offshore components. All construction activities are designed to minimize environmental disruption, using HDD as the primary method to reduce surface disturbance, with open trenching limited to terrestrial segments. Post-construction restoration of all disturbed areas to pre-construction conditions is mandatory. The project is governed by California Environmental Quality Act (CEQA) requirements, with oversight from the City of Los Angeles as the lead agency, and requires compliance with federal, state, and local regulations including those from the U.S. Coast Guard, NOAA, U.S. Army Corps of Engineers, California Department of Fish and Wildlife, and the State Water Resources Control Board. Specific environmental controls include submission and implementation of a Stormwater Pollution Prevention Plan, Oil Spill Contingency Plan, Drilling Fluid Management Plan, and Soil and Waste Management Plan, alongside coordination with tribal entities under AB 52 for cultural resource protection. Site access is restricted with private security and traffic control measures in place, and post-construction deliverables require submission of accurate as-built plans and route coordinates to regulatory agencies. Construction is scheduled to begin with terrestrial work in April 2026, followed by offshore HDD operations in October 2026, with full restoration expected by early 2027. There is no established contract value, formal solicitation number, or federal acquisition regulation clauses, as the project remains in the forecast and environmental review phase rather than a contracted procurement stage. Key contacts include Norman Mundy of the City of Los Angeles as Environmental Supervisor II and Daniel Kim for environmental compliance oversight, with no

General Info

LAX trans-Pacific cable landing project with HDD bore pipes, terrestrial conduit, and environmental compliance, no cables installed yet.

Agency

California → City of Los Angeles

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Vista Del Mar/Imperial Highway, Los Angeles, CA, 90731

Set-Aside

NONE

Documents

(6)

NAHC Comment Letter on LAX Transpacific Cable Landing Project 2025071050

PDFcomment-letter

LAX Transpacific Cable Landing Project Initial Study June 2025

PDFinitial-study

2025071050 CDFW Comment on LAX Transpacific Cable Landing Project NOP

PDFcomment-letter

Caltrans Comment on LAX Transpacific Cable Landing Project Environmental Document

PDFcomment

Notice of Preparation for LAX Transpacific Cable Landing Project EIR

PDFpresolicitation

Notice of Completion for LAX Transpacific Cable Landing

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Norman MundyEnvironmental Supervisor II
Cameron FisherProject Manager

Interested Companies (1)

Show more
ESA
Sacramento, CA

Full Description

Show more
The Project consists of undersea (subsea) fiber optic telecommunications cable landing infrastructure that could receive up to four future submarine cable systems and connect this infrastructure to a terrestrial landing site and terrestrial conduits installed along public ROWs to existing data center(s) in the region. The project would be constructed by Hood 1703, LLC, the applicant (Applicant). The Project would include construction at the Dockweiler Beach landing site, along public ROWs, and offshore to install the following components: • Four (4) offshore bore pipes using HDD and extending approximately 4,000 feet offshore • Two (2) beach manhole (BMHs) installed at Dockweiler State Beach at approximately 400 feet landward of the mean high water (MHW) line to serve as a terminus point for HDD bores • Up to four (4) Ocean Ground Beds (OGBs) at Dockweiler State Beach • One (1) HDD bore from one BMH to the intersection of Imperial Highway and Vista Del Mar • Approximately four (4) miles of open trenched terrestrial conduit route in the Cities of Los Angeles and El Segundo The Applicant proposes to install the landing infrastructure (e.g., BMHs, bore pipes) in one phase, with cable(s) installation occurring in a subsequent phase based on planning timelines, regulatory approval, and installation availability. Once construction is complete, the landing site and conduit along the ROWs to the data center would be restored to pre-construction condition. While no subsea cables are currently proposed to be installed or operated as part of this initial phase of the Project, the Applicant proposes to evaluate the environmental impacts associated with subsea cable installation to be comprehensive. Anticipated offshore Project components include the HDD marine bore pipes described above, up to four submarine cables, and cable regenerators.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
Luke AFB AUX Airfield Modernization
Solicitation # FA488726R0011
The Department of the Air Force, through the 56 Contracting Squadron, is soliciting proposals under solicitation number FA488726R0011 for the modernization of the auxiliary airfield at Luke Air Force Base in Arizona, with the procurement strictly limited to SBA-certified Women-Owned Small Businesses (WOSB). The contract, classified under NAICS code 237130 for Heavy and Civil Engineering Construction, requires offerors to be actively registered in the System for Award Management (SAM) and certified as a WOSB prior to award. Proposals must be submitted electronically no later than 31 July 2026 at 0200 PM MST via email or the DoD Secure Access File Exchange (DoD SAFE) system, with all submissions structured into three distinct volumes: Technical, Past Performance, and Price, each adhering to strict formatting rules including 12-point font, 1-inch margins, 1-line spacing, and page limits of 15 pages for the Technical volume and 20 pages for Past Performance. The solicitation emphasizes compliance with Federal Acquisition Regulation (FAR) provisions, including clauses on anti-kickback procedures, contractor reporting obligations, cybersecurity safeguards, quality control, and suspension of work, with deviations in effect for multiple clauses related to SAM registration, reporting, and inspection standards. The scope of work involves the engineering, furnishing, installation, and testing of replacement channel banks and new fiber optic cable systems at the auxiliary airfield, with performance expected to span 180 calendar days after issuance of the Notice to Proceed. Contract administration is governed by the Wide Area WorkFlow (WAWF) system for invoicing and payment processing, with payment to be made to the designated DoDAAC F87700 at Luke AFB, Arizona. Evaluation will follow a trade-off approach between Technical (construction work plan), Past Performance, and Price, where superior technical and performance capabilities may justify higher pricing. Proposals rated Marginal or Unacceptable in Technical or Limited Confidence or lower in Past Performance are ineligible for award. Special requirements include the use of independent, third-party Special Inspectors and Quality Control Managers not affiliated with the contractor, compliance with OSHA and NFPA standards, submission of a Special Inspections Project Manual, validation of testing laboratories by the USACE Material Testing Center, and adherence to detailed packaging and marking standards under 49 CFR for any hazardous materials. Documentation deliverables include as
FA4887 56 Cons Cc

POSTED

1 day ago

DEADLINE

in 17 days
View Details
NAICS: 237130
New
Federal
Y--Stegall Substation Stage 07 Phase 01
Solicitation # 89503226BWA000075
The Stegall Substation Stage 07 Phase 01 Project involves the replacement of aging and obsolete equipment at the substation with modern, reliable alternatives to enhance system performance and safety. Key upgrades include removing the 1960s-era control building and installing a new one, replacing over 30 disconnect switches, eliminating problematic brown glass insulators, reconducting and uprating the main bus, replacing two 115kV oil circuit breakers, and swapping the outdated 1990s GE D20 RTU with three modern SEL RTACs for improved control and monitoring. Additionally, a transfer bus dead end structure will be added between the 230kV east and west interconnects to increase operational flexibility. All work is focused on extending the substation’s operational life and ensuring grid reliability. This solicitation, numbered 89503226BWA000075, is issued by the Department of Energy’s Western-Rocky Mountain Region office located in Loveland, Colorado, with a response deadline of August 10, 2026. The contract is a Total Small Business Set-Aside under FAR 19.5 and falls under NAICS code 237130 for Electric Power Construction. The point of contact for inquiries is John W. Pratt, reachable via email at jpratt@wapa.gov or phone at 720-962-7166. The project is intended for small business contractors, and all work must be performed in accordance with federal procurement guidelines for energy infrastructure modernization.
Western-Rocky Mountain Region

POSTED

1 day ago

DEADLINE

in 14 days
View Details