This Solicitation opportunity from Colorado was posted on September 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LCC 27-1 Repair Roof & Ceiling, Indoor Arena & Stalls

Closed
2024-077M23State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
SLED
RFP-DET-270000000308-1 | 27-0052 Roof Replacement for Cass, Emerson, Priest, Clippert
Solicitation # 27-0052
Detroit Public Schools Community District is soliciting proposals for the FMP Series 6 Roof Replacement project, which involves the total replacement of roof systems at four locations: Cass Technical High School, Emerson Elementary-Middle School, Priest Elementary-Middle School, and Clippert Academy. The scope of work requires the contractor to provide all labor, materials, equipment, and supervision to remove existing roof systems down to the structural deck, perform necessary substrate repairs, and install new membranes and insulation, primarily utilizing 60-mil EPDM and R-30 insulation systems. Work is scheduled to be performed between June 1, 2027, and August 13, 2027. The project includes specific requirements for pre- and post-construction drain testing and adherence to ASTM standards and manufacturer instructions. The contract mandates compliance with Michigan State Prevailing Wage Laws and requires a bid security of 5% of the total bid amount, with the selected vendor providing performance and payment bonds equal to 100% of the bid. Proposals must be submitted by November 20, 2026, and will be evaluated based on technical qualifications, price, and the combined relative merit of the offer. Financial terms include a 45-day payment cycle and mandatory owner-controlled allowances of $20,000 and $160,000 for permitting per building. Contractors are responsible for hiring an independent testing and inspection laboratory to verify material compliance and workmanship quality at the project sites.
Detroit Public Schools

POSTED

2 days ago

DEADLINE

in 5 days
NAICS: 238160
New
SLED
McClintock Roofing Replacement-IFB #27-016CH-27IFB
Solicitation # 27-016CH-27IFB
Tempe Union High School District #213 is soliciting bids for the McClintock High School Roofing Renovation project, with an estimated construction value of 3,000,000.00 USD. The scope of work involves the installation and renovation of multiple roofing systems across various campus buildings, including acrylic coatings over built-up roofing, SBS-modified bituminous membrane roofing, and sheet metal roofing. Key deliverables include the provision of roof accessories such as ladders and skylights, the performance of infrared moisture surveys to ensure substrate moisture is below 15 percent, and the construction of mockups for quality verification. The project requires strict adherence to ASTM and Factory Mutual standards, and a limited asbestos survey has identified approximately 8,000 square feet of asbestos-containing materials on the roofs. Bids must be submitted via the OpenGov procurement portal by 2:00 PM Arizona Time on December 9, 2026. The contract will be awarded to the lowest responsible bidder who conforms to all material requirements. Required submission documents include a vendor reference list, a certificate of insurance, a bonding capacity letter, and a scanned bid bond for projects exceeding 100,000.00 USD, with the original bond due within 48 hours of the deadline. The successful contractor must provide performance and payment bonds and comply with Arizona Revised Statutes, including fingerprinting requirements and certifications against the use of forced labor. Payment terms are net 30 days following the submission of detailed invoices to the District Accounts Payable Department.
Purchasing

POSTED

2 days ago

DEADLINE

in 24 days

AI Contract Overview

Show more

Lamar Community College is soliciting bids for project 2024-077M23, which involves the complete removal and replacement of roofing panels and insulation for the Indoor Arena and Stalls located at 2401 South Main Street in Lamar, Colorado. This Design/Bid/Build project has an estimated cost of 1,419,477 dollars and requires the installation of standing seam metal roof panels and thermal insulation. A critical operational requirement is that demolition must be limited to areas that can be reconstructed and made weather-tight within the same workday to prevent environmental exposure. The project includes a 4,000 dollar allowance for the removal of wet insulation and requires a Letter of Design Certification signed and sealed by a qualified professional engineer. The anticipated notice to proceed is October 19, 2026, with on-site construction scheduled from May 3, 2027, to July 20, 2027. Due to site availability, all materials purchased before May 3, 2027, must be stored off-site at the contractor's expense. The project schedule must include 30 calendar days of float time for weather-related cancellations. Bidders must demonstrate at least two years of business longevity, experience with two similar projects exceeding 1.5 million dollars in hard costs, and bonding capability up to 2 million dollars. Additionally, the contract is subject to the Colorado Prevailing Wage Statute, and at least 80 percent of the work must be performed by Colorado labor. Sealed bids are due by October 6, 2026, at 1:00 PM MDT.

General Info

Lamar Community College seeks bids for arena roof replacement costing 1,419,477 dollars.

Place of Performance

Not specified

Set-Aside

NONE

Documents

11
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstsow
High
DOCX, Low priorityother
Low
DOCX, Low priority5 pages · other
Low

Read all 11 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • BF Combined Roof ProjectOpen now
  • Replace Facilities Main Office RoofOpen now
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from IFB1-GJFA-2027000028-4 to IFB1-GJFA-2027000028.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → Lamar Community College
Contacts1 person available
OfficeLamar, CO, 81052, USA
Office AddressLamar, CO, 81052, USA

Full Description

Show more
See attached detailed specifications, Bid form and other documents.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS