This Solicitation opportunity from Utah was posted on August 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
LCWTP Rebuild CM/GC RFP 2026
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Metropolitan Water District of Salt Lake & Sandy is soliciting proposals for Construction Manager/General Contractor (CM/GC) services to rebuild the Little Cottonwood Water Treatment Plant. This multi-year project, targeted for completion by the end of 2032, aims to upgrade critical infrastructure to improve safety, resiliency, and performance, specifically focusing on filtration, sedimentation, flocculation, and chemical feed processes. The project is estimated to cost approximately 634.7 million dollars, with a total construction cost of 461.6 million dollars and a required bond of at least 800 million dollars. The work is structured into six phases, ranging from the initial basis of design through start-up and commissioning, and requires the maintenance of a minimum water production of 90 MGD during peak demand. The project utilizes a two-phase CM/GC delivery method. Phase I focuses on preconstruction services, including constructability reviews, value engineering, and the establishment of a Guaranteed Maximum Price (GMP). Phase II encompasses full construction, procurement, and commissioning. Selection is based on a best-value process involving a combined score from proposal evaluations and interviews. The contract incorporates federal flow-down requirements, including FAR Part 52 clauses, Buy America preferences, and prevailing wage standards. Proposers must be licensed in Utah and provide certifications regarding anti-corruption and the boycott of Israel. Proposals are due by 2:00 p.m. on September 22, 2026, and must be submitted as a single PDF via the U3P portal, adhering to a 35-page limit.
General Info
Agency
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Project is to be designed and constructed in two phases using the CM/GC delivery method. Phase I preconstruction services encompass constructability reviews, value engineering, estimating, risk management, and scheduling activities. Phase I is completed when there is agreement on the Project schedule and guaranteed maximum price (GMP). Phase II construction services, in which the CM/GC assumes the general contractor role, encompasses further design review, risk management, procurement of subcontractors and vendors, equipment procurement, self-performance of certain elements of the construction (where permitted and at the Owner’s discretion), and full construction and commissioning, which may occur in a single or multiple GMP packages, at the discretion of the Owner.
More opportunities from Utah
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS