Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Leduc County - Invitation to Bid - Double Seal Coat - Range Road 275 – Highway 39 to CPKC Rail Crossing

Closed
AB-2026-03751Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months

AI Contract Overview

Show more

The contract involves the application of a double seal coat followed by a final fog coat on a roadway segment extending from Highway 39 to the end of existing pavement, excluding the railway crossing south of Buford. The work requires thorough preparation including mobilization, removal of loose materials from the surface, and full-width surface treatment in compliance with Alberta Transportation and Economic Corridors’ Standard Specifications for Highway Construction, November 2019. Traffic accommodation measures are mandatory, including residential notifications to the Hamlet of Buford, installation of construction signage, and pre-construction advertising using Variable Message Signs with messages as defined in section 3.21.6.2. After the seal coat application, a fog coat shall be applied as the final surfacing layer, followed by road line painting that includes directional divider lines and two edge lines over the treated area. The project is solicited under Leduc County’s Invitation to Bid with identifier AB-2026-03751, classified under NAICS 237310, and responses are due by June 4, 2026. The contracting authority is Travis Ratsoy, and the work location is within Alberta.

General Info

Double seal coat and fog coat application on Range Road 275, traffic management, line painting.

Agency

Government of Canada → Leduc County

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Leduc County
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Leduc County
Office AddressN/A
Contacts
Travis RatsoyContracting Authority

Full Description

Show more
Work at this site includes the application of the double seal coat layer finished with a final fog coat layer. Roadway surface shall be double seal coated as well as fog coated for the full width of the pavement commencing at Highway 39 to the end of existing pavement excluding the railway crossing south of Buford. Without limiting the special provisions and the Contract, the scope of work at this site shall include but is not limited to following: • Mobilization • Traffic Accommodation including, residential notifications to the Hamlet of Buford, construction signage and pre-construction advertising using Variable Message Sign with messaging as stipulated in section 3.21.6.2 of the Alberta Transportation and Economic Corridors’ Standard Specifications for Highway Construction (November 2019). • Removal of loose materials from the roadway by hand or mechanical means before the application of the double seal coat layers. • Double Seal Coat as per section 3.21 of Alberta Transportation and Economic Corridors’ Standard Specifications for Highway Construction (November 2019). • Final surfacing over the double sealed coated surface with a Fog Coat as per section 3.19 of Alberta Transportation and Economic Corridors’ Standard Specifications for Highway Construction (November 2019). • Roadway Line Painting with directional diving and two edge lines over the area receiving double seal coat with the fog coat over the top.