Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Leduc County - Invitation to Bid - Double Seal Coat - Range Road 275 – Highway 39 to CPKC Rail Crossing

Closed
AB-2026-03751International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including site preparation, land surveying, subsurface investigation, and shoring. The scope further extends to complex pipeline and utility work such as tunneling, boring, jacking, micro tunneling, and the installation of cathodic protection and steel casing. Additional requirements include surface work like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, as well as the supply of ready mix, precast concrete, and manhole materials. The solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Kiewit also emphasizes the importance of labor harmony and notes its existing collective bargaining agreements with several trade unions. Interested parties must submit their quotes by November 18, 2025, via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 10 days
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim with an estimated construction cost of $4,213,400. The scope of work involves the removal and reconstruction of asphalt concrete pavement using rubberized asphalt concrete within the existing right of way on Katella Ave from Auburn Way to Douglass Rd and State College Blvd from Katella Ave to Gene Autry Way. Additional infrastructure improvements include the reconstruction of ADA access ramps, sidewalks, curb and gutter, and the adjustment of utility pull-boxes and traffic detection devices, as well as the installation of signage and pavement markings. The project must be completed within 70 working days from the Notice to Proceed. Contractors must hold a General Engineering (A) license and be registered with the Department of Industrial Relations. A key requirement is compliance with the Community Workforce Agreement, requiring the awarded contractor and all subcontractors to sign a Letter of Assent. Bids are evaluated based on the lowest responsive Total Base Bid Proposal submitted via OpenGov, with a required 10% bid bond. Performance is subject to strict work hour constraints, specifically between 10:00 p.m. and 5:00 a.m. for work affecting Caltrans right-of-way. The contract also mandates adherence to MUTCD standards for traffic control and ANSI/TIA/EIA standards for fiber optic installations.
Public Works

POSTED

about 18 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The contract involves the application of a double seal coat followed by a final fog coat on a roadway segment extending from Highway 39 to the end of existing pavement, excluding the railway crossing south of Buford. The work requires thorough preparation including mobilization, removal of loose materials from the surface, and full-width surface treatment in compliance with Alberta Transportation and Economic Corridors’ Standard Specifications for Highway Construction, November 2019. Traffic accommodation measures are mandatory, including residential notifications to the Hamlet of Buford, installation of construction signage, and pre-construction advertising using Variable Message Signs with messages as defined in section 3.21.6.2. After the seal coat application, a fog coat shall be applied as the final surfacing layer, followed by road line painting that includes directional divider lines and two edge lines over the treated area. The project is solicited under Leduc County’s Invitation to Bid with identifier AB-2026-03751, classified under NAICS 237310, and responses are due by June 4, 2026. The contracting authority is Travis Ratsoy, and the work location is within Alberta.

General Info

Double seal coat and fog coat application on Range Road 275, traffic management, line painting.

Agency

Government of Canada → Leduc County

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Leduc County
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Leduc County
Office AddressN/A
Contacts
Travis RatsoyContracting Authority

Full Description

Show more
Work at this site includes the application of the double seal coat layer finished with a final fog coat layer. Roadway surface shall be double seal coated as well as fog coated for the full width of the pavement commencing at Highway 39 to the end of existing pavement excluding the railway crossing south of Buford. Without limiting the special provisions and the Contract, the scope of work at this site shall include but is not limited to following: • Mobilization • Traffic Accommodation including, residential notifications to the Hamlet of Buford, construction signage and pre-construction advertising using Variable Message Sign with messaging as stipulated in section 3.21.6.2 of the Alberta Transportation and Economic Corridors’ Standard Specifications for Highway Construction (November 2019). • Removal of loose materials from the roadway by hand or mechanical means before the application of the double seal coat layers. • Double Seal Coat as per section 3.21 of Alberta Transportation and Economic Corridors’ Standard Specifications for Highway Construction (November 2019). • Final surfacing over the double sealed coated surface with a Fog Coat as per section 3.19 of Alberta Transportation and Economic Corridors’ Standard Specifications for Highway Construction (November 2019). • Roadway Line Painting with directional diving and two edge lines over the area receiving double seal coat with the fog coat over the top.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS