Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Leo Carrillo Ranch Historic Park Stair Replacement

Closed
20260822001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238110
New
Federal
554-27-117 Conduct Concrete and Civil Site Repairs.
Solicitation # 36C25926Q0826
Solicitation 36C25926Q0826 is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to perform concrete and civil site repairs at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The project has an estimated magnitude between $100,000 and $250,000 and a performance period of 60 calendar days from the Notice to Proceed. The scope of work includes concrete and drainage remediation, specifically remove and replace activities, sidewalk leveling, curb repair, and sidewalk additions across multiple campus locations. Contractors must adhere to strict safety standards, including providing a Site Specific Safety Plan and ensuring a Competent Person with a 30-hour OSHA card is on-site at all times, while all employees must hold at least a 10-hour OSHA certification. Proposals are due by October 30, 2026, at 10 AM MT and must be submitted via email to Elia Laritza Ruiz Manzo. Required submission documents include a signed SF-1442, a Limitations on Subcontracting (LOS) certification, and past performance information for two to five relevant projects valued at $100,000 or more completed within the last five years. Evaluation factors include a review of OSHA or EPA violations from the past three years and an Experience Modification Rate (EMR) of 1.0 or less. Additionally, offerors must be visible and verified in the SBA certification database and registered in the System for Award Management (SAM). A digital bid bond of 20% of the bid price is required.
Network Contract Office 19 (36C259)

POSTED

about 8 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The City of Carlsbad is soliciting bids for the Leo Carrillo Ranch Historic Park Stair Replacement project, identified as Project No. 4772 (PWS27-4116FAC). The scope of work involves the reconstruction of existing stairways adjacent to the Hacienda, utilizing new materials that maintain the historic aesthetic while complying with the California Historical Building Code and Title 24 of the Health and Safety Code. Key deliverables include the installation of temporary and permanent handrails with built-in lighting and the necessary electrical work to connect them to a power source. The engineer's estimate for the project is 395,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. The project is anticipated to commence on December 7, 2026, with a targeted completion date of February 10, 2027. The contractor must complete the replacement of concrete staircases and installation of temporary handrails within 45 working days of the start date. Bidders must submit their proposals via the agency's online portal by September 17, 2026, and must have attended the mandatory pre-bid conference to be eligible. Required submissions include a bid guarantee, DIR public works contractor registration, and various certifications. The successful contractor will be required to provide performance and payment bonds equal to 100 percent of the contract price, maintain comprehensive liability insurance, and adhere to prevailing wage requirements.

General Info

Carlsbad stair replacement project solicitation due September 17, 2026, via BidAmerica platform.

Place of Performance

Carlsbad, CA, 92009, USA

Set-Aside

NONE

Documents

1

PWS27-4116FAC Leo Carrillo Ranch Historic Park Stair Replacement IFB

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Carlsbad
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → City of Carlsbad
Office AddressN/A
Contacts
Agency's Bid Administrator

Full Description

Show more
Bid #PWS27-4116FAC, Project No. 4772: $18

More opportunities from California → City of Carlsbad

Same awarding agency

NAICS: 238210
SLED
Village Pedestrian Lighting
Solicitation # PWS27-4173TRAN
The City of Carlsbad, California, is soliciting bids for the Village Pedestrian Lighting project, identified as Contract No. 4016 (Solicitation PWS27-4173TRAN). The project involves the furnishing and installation of 40 complete pedestrian light assemblies, foundations for seven city-furnished assemblies, 5,480 linear feet of PVC conduit, 5,980 linear feet of power conductors, and 800 linear feet of span wire and hardware. Additional requirements include the installation of 14 commercial grade LED twinkle lights, utility potholing, and the implementation of SWPPP, WPCP, and NPDES environmental standards. All work must be completed within 120 working days from the Notice to Proceed and must adhere to the Standard Specifications for Public Works Construction and ADA compliance for curb ramps. Bids will be evaluated against an Engineer's Estimate of 1,351,130 dollars, with final award determination made by the City Council. Submissions must be made exclusively through the City's eBidding site by November 5, 2026, and must include a bid security of 10 percent of the total bid amount. Required documentation includes a Designation of Subcontractors form, a Statement of Technical Ability and Experience, certificates of insurance, and CARB Fleet Compliance Certification. The successful contractor must comply with California Labor Code prevailing wage rates and utilize the Procore platform for all project documentation. The contract includes a one-year warranty period supported by a 25 percent failure performance bond.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

22 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS