Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Letz Avenue Sewer Force Main Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Letz Avenue Sewer Force Main Rehabilitation Project is a local infrastructure initiative led by the McKinleyville Community Services District in California to replace an aging sewer force main that has reached the end of its operational life. The project involves constructing a new sewer line adjacent to the existing pipeline, extending from the Letz Avenue Lift Station to Murray Road within McKinleyville, with the intent to maintain the same functional capacity and service level without expanding the system. The deteriorated original line will be abandoned in place, and all construction-impacted areas will be fully restored to their pre-project condition. This project is classified under NAICS code 237110 and operates under a categorical exemption from the California Environmental Quality Act (CEQA Section 15302), which permits replacement or reconstruction of existing facilities without environmental impact or capacity increase. The project is not part of a federal procurement system; no federal acquisition regulation clauses, funding codes, accounting data, or invoicing systems are applicable. There is no publicly listed contract value, solicitation number, or formal bidding process details, as the documentation reflects a forecast rather than an active solicitation. The designated point of contact for the project is Pat Kaspari, General Manager of the McKinleyville Community Services District, reachable by phone and email. No formal evaluation factors, contract administration roles such as COR or COTR, packaging or marking requirements, or offeror certifications are specified, underscoring the project's status as a locally managed public works effort without federal procurement trappings. Submission of a certified CEQA exemption document is indicated as a necessary component, yet no detailed proposal format, deadlines, or electronic submission guidelines are provided.

General Info

Replace aging sewer force main from Letz Avenue to Murray Road with no capacity increase, CEQA exempt, locally managed.

Agency

California → McKinleyville Community Services District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Letz Ave. and Murry Rd., CA, 95519

Set-Aside

NONE

Documents

(1)

Letz Ave Sewer Main Rehab - CEQA Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → McKinleyville Community Services District
Contacts1 person available
OfficeN/A
Organization / Agency
California → McKinleyville Community Services District
Office AddressN/A
Contacts
Pat KaspariGeneral Manager

Full Description

Show more
Construction of a replacement sewer main adjacent to an existing sewer main that has reached the end of its useful life and will be abandoned. The project will allow for continued safe sewer services for the community of McKinleyville.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is forecasting the restoration of a 1947 water main located along the north bound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build delivery method. This project aims to preserve the integrity of the aging infrastructure by rehabilitating the existing pipe without excavation, leveraging the durability and efficiency of CIPP to extend service life and minimize disruption to surrounding areas. The work scope is focused on a critical transportation corridor, requiring careful planning to maintain public safety and operational continuity during execution. Solicitation details are managed under NAICS code 237110 for water and sewer line and related structures construction, and the project is being coordinated through the Port of Seattle with Moraa Omwega as the primary point of contact and Ray Moreno serving as Project Manager. The forecast notice was posted in July 2026, signaling preparation for future procurement, though no formal solicitation number has been issued yet. The place of performance is not geographically defined in the posting, but the location is understood to be within the Airport Expressway corridor near the port’s aviation facilities. All future bidding, design submissions, and construction activities will be directed through the Port of Seattle’s official procurement portal.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 237110
New
SLED
Bid 2026-09 Primary Sewer Lift Station #2The City of Carlsbad is soliciting sealed bids for the construction of Primary Lift Station No. 2, with submissions due by 2:00 p.m. local time on Thursday, August 27, 2026, at the city’s purchasing office. The project involves building a new triplex submersible pump lift station measuring approximately 17.5 feet long by 15.2 feet wide by 44 feet deep, along with an integrated valve vault, new electrical systems and control equipment, and a renovation of an interior room within the existing electrical building to house the controls. Additionally, the scope includes a wastewater flow splitter vault to enable flow diversion between lift stations, approximately 156 linear feet of 30-inch sewer pipe, two new manholes, and about 60 linear feet of new ductile iron force main with all necessary appurtenances. Bidders must attend a mandatory pre-bid meeting on Wednesday, August 5, 2026, at 11:00 a.m. at 304 E. Plaza St., Carlsbad, NM. Bidding documents are accessible online at soudermiller.com at no cost, and bidders are required to regularly check the site for addenda and updates. Resident Contractor and Resident Veteran Contractor preferences are applicable under New Mexico state law. All bids must be submitted to Matthew Fletcher at 101 North Halagueno Street, Room #204, Carlsbad, NM 88220, and will be publicly opened at the same location upon the deadline.
Purchasing

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
SLED
Wheatland Regional Sewer Pipeline ProjectThe Wheatland Regional Sewer Pipeline Project involves the complete construction and commissioning of a 7.7-mile sewer pipeline along with two new pump stations, horizontal directional drilling, demolition and replacement of an existing pump station, electrical control systems, culvert replacement, site restoration, and all necessary start-up and testing activities to ensure full operational functionality. The scope encompasses the furnishing of all labor, materials, equipment, taxes, and incidental services required to execute the project in full compliance with the Contract Documents prepared by DCCM and Nexgen Utility Management. This includes any additional work deemed necessary to deliver a fully compliant and operational system as specified in the technical volumes. The estimated cost is divided into two primary components: $19 million for the pipeline construction and $33 million for the pump stations, totaling a projected investment of $52 million. The solicitation, identified as CWSRF Project No C-06-8753-110, was posted on July 17, 2026, with responses due by August 18, 2026. The project is administered by the City of Wheatland in California under a state, local, or educational (SLED) agency classification, with Dane Schilling serving as the primary point of contact for inquiries. All work must be performed at the designated place of performance within California, and contractors are expected to adhere to all contractual requirements outlined in the six-volume bid package to meet project standards and timelines.
City of Wheatland

POSTED

3 days ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
SLED
NOTICE is hereby given that the City of Meridian, Mississippi (the City) is soliciting Statements of Qualifications (SOQs) from qualified firms to provide a comprehensive Advanced Metering Infrastructure (AMI) System and associated long-term operationThe City of Meridian, Mississippi is seeking qualified firms to submit Statements of Qualifications for the design, implementation, and long-term operation of a comprehensive Advanced Metering Infrastructure system. This solicitation aims to enhance water or utility metering capabilities through modern technology that enables automated data collection, real-time monitoring, and improved operational efficiency. Interested parties must demonstrate relevant experience, technical expertise, and the capacity to deliver a scalable, secure, and sustainable AMI solution that meets the city’s long-term operational needs. Respondents are required to submit their qualifications by the deadline of August 26, 2026, with the solicitation officially posted on July 17, 2026 under reference number 15-20260623154237 Meridian. The project falls under the jurisdiction of the Mississippi Public Service Commission’s MPTAP office and is open to firms without specific set-aside restrictions. All work must be performed within the state of Mississippi, and proposers should ensure their submissions align with the city’s infrastructure goals and compliance standards. Further details and submission guidelines can be accessed through the official Mississippi government portal.
MPTAP

POSTED

3 days ago

DEADLINE

in about 1 month
View Details