Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on August 1, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LEWIS AND CLARK NATIONAL FOREST, Road Obliteration D4

Awarded
AG-03K0-S-08-0022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Construction of The Recharge Master Plan Update (RMPU) Basin Improvements Project - Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-rmpu-basin-improvements-project-montclair-basin-0
The Recharge Master Plan Update Basin Improvements Project, managed by Granite Construction Company, involves the construction of two drop inlet diversion structures within the San Antonio Creek Channel in Montclair, California. The scope of work includes excavating 8 to 10 feet below the channel floor across a 25-foot width, installing steel debris grates, and fitting wall-mounted steel gates on the east sides of the structures. Additionally, the project requires the installation of 4-foot-diameter discharge pipelines leading to Montclair Basins 2 and 3, which will be covered by 3 feet of soil and terminate in concrete outlet structures designed for flow dissipation. Technical requirements include the implementation of complete electrical, instrumentation, and SCADA integration to manage gate actuation. Programming for these systems is strictly limited to approved integrators, specifically Technical Systems, Inc. or E Technologies Group. This solicitation is categorized under NAICS code 237990 and includes a set-aside for Disadvantaged Business Enterprises. Interested parties must coordinate with the primary point of contact, Andrew Burk, regarding the submission process.
Granite Construction Company

POSTED

about 1 hour ago

DEADLINE

in 1 day
NAICS: 237990
New
SLED
6893
Solicitation # 49749
Solicitation 49749, titled Taxiway Light Bases and Extensions at Logan International Airport, is a procurement opportunity issued by the Massachusetts Port Authority for construction and equipment acquisition. The project is funded under Airport Improvement Program Project Number 3-25-0010-XX and requires the delivery of materials to the Massport warehouse at the Central Stockroom in East Boston, Massachusetts. Bidders must provide at least seven calendar days of advance notice before shipping materials, which should be delivered in the fewest bulk shipments possible. The award will be based on the best interest of the Authority rather than the lowest cost. Compliance requirements are extensive, including adherence to the Davis-Bacon Act for labor wages, the Occupational Safety and Health Act of 1970, and Clean Air and Water Pollution Control requirements for contracts exceeding 100,000 dollars. Bidders must submit specific Buy American certifications via Appendix IIC-1 or IIC-2 to be considered responsive. Additionally, the contract mandates compliance with Civil Rights Title VI, Section 504 of the Rehabilitation Act, and various federal prohibitions regarding foreign-owned entities, specific telecommunications equipment, and unmanned aircraft systems. Preference in hiring will be given to qualified veterans and disabled veteran-owned small businesses.
Massachusetts Port Authority - Goods & Services

POSTED

about 1 hour ago

DEADLINE

in 7 days
NAICS: 237990
New
SLED
9585 - Castle Creek Channel Improvements at Warner Park
Solicitation # 9585
The City of Madison is soliciting bids for Contract 9585, Project 13863, to perform channel improvements at Castle Creek in Warner Park, Wisconsin. The scope of work involves reconstructing an existing concrete lined channel by lowering and widening it from Sherman Avenue to Warner Lagoon. Key activities include the removal of concrete, native plant restoration, storm sewer improvements, and the potential removal, salvage, and reinstallation of existing bridges. The project is supported by a Pre-Disaster Flood Resilience Grant from the Wisconsin Department of Military Affairs totaling 1,842,719.55 dollars and requires compliance with permits from the US Army Corps of Engineers and the Wisconsin Department of Natural Resources. Bidders must be pre-qualified by the Board of Public Works, specifically in category 246 for Ecological Restoration if the prime contractor does not hold that qualification. The solicitation mandates a 12 percent Small Business Enterprise goal and requires a 5 percent bid bond. Proposals must include a lump sum bid and detailed unit prices submitted electronically via Bid Express by November 5, 2026. Award criteria are based on a best value determination, and the successful contractor must adhere to strict erosion control standards and a one-year guarantee for seeded areas. Construction is required to commence within seven calendar days of a written notice to proceed.
City of Madison

POSTED

about 5 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Lewis and Clark National Forest, under the Department of Agriculture, issued solicitation AG-03K0-S-08-0022 for the Road Obliteration D4 project located in the South Fork Judith River drainage of the Little Belt Mountains near Utica, Montana. The project involves the obliteration of approximately 17 miles of road through methods such as recontouring and scarification or ripping to a minimum depth of 12 inches, with specific certifications required for 18-inch depths in certain areas. Additional requirements include removing culverts, restoring natural channel configurations in riparian areas, installing drainage features, and pulling woody debris onto the road bed. The contract requires the use of two excavators equipped with hydraulic thumbs and operated by experienced, qualified personnel, with a forest official providing on-site guidance. The estimated project value is between 25,000 and 100,000 dollars, with a performance period of 35 calendar days from the date of the Notice to Proceed. Bidders were required to submit an experience questionnaire, equipment lists, and technical documentation by the closing date of July 21, 2008. Site access was specifically designated via road 487.

General Info

Obliterate 17 miles of road in Montana for $25,000-$100,000 within 35 days.

Contract Value

$43,000

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Lewis and Clark National Forest, Judith Ranger District approximately 15-30 miles SW of Utica, Montana within the South Fork Ju, Utica, MT, USA

Set-Aside

NONE

Award Issued Date

Documents

6
DOC, High priority: read this firstpast-performance
High
DOC, High priority: read this firstamendment
High
PDF, High priority: read this firstspecifications
High
DOC, High priority: read this firstrfp
High
DOC, High priority: read this firstrfq
High
PDF, Low priorityspecifications
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline time changed from 11:00 PM UTC to 9:00 PM UTC on Jul 21, 2008. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Custer Gallatin National Forest
Contacts2 people available
OfficeBOZEMAN, MT, 59715, USA
Office AddressBOZEMAN, MT, 59715, USA
Contacts
Jane L OttenheimerContracting Officer
Lori A EbyProcurement Technician

Full Description

Show more
Project consists of the obliteration of approximately 17 miles of road in the South Fork Judith River drainage in the Little Belt Mountains. Methods include scarification/ripping to a minimum depth of 12 inches, recontouring or both. When drainage/riparian areas are encountered, overlying fill material will be pulled back to a more natural channel configuration. Culverts will be removed when applicable. Disturbed areas with heavy compaction will be scarified so the Forest Service can seed. Drainage features will be installed. Woody debris will be pulled onto the road bed after obliteration. Two excavators with hydraulic thumbs with experienced, qualified operators will be required for this project. A forest official will be on-site to assist with the level of obliteration. Anticipated work start is July 28, 2008 with completion within 35 calendar days from date of Notice to Proceed. Scope of this project is between $25,000 and $100,000. Solicitation will be posted on or about June 30, 2008.

More opportunities from Department Of Agriculture → Custer Gallatin National Forest

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS