Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on June 16, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LEWIS & CLARK NATIONAL FOREST-Road/SnowmobileTrail Obliteration

Awarded
AG-03K0-S-14-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
Federal
Wisconsin - East Zone Gravel Pit NNIS Treatment Amendment 2: RFQ for 12363N26Q4152 This is for the Land Management Integrated Resources BPA only
Solicitation # 12363N26Q4152
The USDA Forest Service is issuing a BPA Call Order for NNIS treatment at gravel pit sites in the East Zone of Wisconsin under the Land Management Integrated Resources BPA, which is a nationwide multiple-award contract encompassing professional services, natural resource restoration, engineering, and project management. This procurement is restricted to the 39 pre-approved contractors already on the LMIR BPA, and the call order will be distributed exclusively via email to those listed entities; no public solicitation or proposal submissions are being accepted in response to this notice. The requirement is not set aside for any specific small business classification, though small businesses are preferred. The solicitation number is 12363N26Q4152, with a response deadline of June 15, 2026, and the NAICS code 115310 applies to this work. The procurement is administered by the Stewardship Contracting Branch of the USDA Forest Service, with primary point of contact Chad Bullock and secondary contact Jim Kaminski, both reachable via email. Any contractor wishing to join the LMIR BPA may submit proposals at any time before the BPA’s expiration by contacting the listed email addresses, as the BPA remains open for continuous pre-solicitation inclusion through SAM.gov using solicitation number 12363N23Q4152.
Stewardship Contracting Branch Usda-Fs

POSTED

about 11 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 22 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 22 hours ago

DEADLINE

in 3 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict slash management including clearing roadways and streams, and the removal of all foreign debris. Contractors must adhere to specific technical standards, such as maximum stump heights of one-half the stump diameter and a maximum slash height of 24 inches, with financial penalties of 3 dollars per tree for damage to leave trees. Bids must be physically submitted to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026, as electronic submissions are prohibited. A complete bid packet must include a bid sheet, bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a signed debarment certification. Award decisions are based on the contractor being responsive and responsible, though the lowest bid is not guaranteed to be accepted. Payment is issued per completed and accepted acre, with 20 percent of each payment withheld until final acceptance. Contractors are required to provide liability insurance and comply with TERO Title X and TOSHA safety regulations.
Confederated Tribes of the Colville Reservation

POSTED

about 22 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The Department of Agriculture, through the Custer Gallatin National Forest, issued solicitation AG-03K0-S-14-0004 for an Indefinite Delivery Indefinite Quantity (IDIQ) firm fixed price contract. The project involves forest-wide road and snowmobile trail obliteration across both divisions of the Lewis and Clark National Forest in Montana. The scope of work requires the contractor to provide all labor, equipment, supervision, and transportation necessary for roadway obliteration, culvert removal, and stream restoration. Key tasks include the hauling and placement of government-furnished rip-rap, gravel, and boulders for erosion control and access blocking, as well as the application of certified weed-free seed on all disturbed ground. The contract structure includes a base period and two option years, with a maximum contract value of 950,000 dollars. Specific requirements include the use of track-type excavators with a minimum of 90 flywheel horsepower and hydraulic thumbs for stream work and structure removal. The contractor is responsible for utility location, pollution and erosion control, and the repair of any government facilities damaged during operations. Performance is managed through individual task orders, and bidders are evaluated based on their technical capability, including the submission of a Plan of Operation, Health and Safety Plan, and Project Quality Control Plan.

General Info

Contract Value

$0

NAICS

115310 - Support Activities for Forestry

Place of Performance

Forest Wide Rocky Mountain and Jefferson Divisions, GREAT FALLS, MT, 59401, USA

Set-Aside

NONE

Awardee

BSE

Award Issued Date

Documents

14

AG-03K0-S-14-0004 Amendment 005

PDF, High priority: read this firstamendment
High

AG-03K0-S-14-0004 Road Obliteration IDIQ

PDF, High priority: read this firstifb
High

AG-03K0-S-14-0004 Road Obliteration IDIQ

PDF, High priority: read this firstifb
High

AG-03K0-S-14-0004 Road Obliteration IDIQ

PDF, High priority: read this firstifb
High

AG-03K0-S-14-0014 Amendment 001

PDF, High priority: read this firstamendment
High

AG-03K0-S-14-0014 Amendment 002

PDF, High priority: read this firstamendment
High

AG-03K0-S-14-0014 Amendment 003

PDF, High priority: read this firstamendment
High

AG-03K0-S-14-0014 Amendment 004

PDF, High priority: read this firstamendment
High

Attachment 4 - Sample Task Order for Base Year

PDF, High priority: read this firsttask-order-award
High

Lewis and Clark National Forest - Road Obliteration Section B

PDF, High priority: read this firstspecifications
High

Lewis and Clark National Forest - Road Obliteration Section B

PDF, High priority: read this firstspecifications
High

Road/Snowmobile Trail Obligation - Drawings and Photos

PDF, High priority: read this firstspecifications
High

Sample Task Order for Base Year - Roadway Obliteration

PDF, High priority: read this firsttask-order-award
High

Solicitation AG-03K0-S-14-0004 - Road/Snowmobile Trail Obliteration IDIQ

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Apr 1, 2014 to Apr 14, 2014.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Custer Gallatin National Forest
Contacts1 person available
OfficeBOZEMAN, MT, 59715, USA
Office AddressBOZEMAN, MT, 59715, USA
Contacts
Lori AustadContracting Officer

Full Description

Show more
REQUEST FOR PROPOSALS (RFP) E-MAILS ACCEPTED The Government Anticipates Awarding an Indefinite Delivery Indefinite Quantity (IDIQ) FIRM FIXED PRICE Contract from the Solicitation. A COMPLETE SOLICITATION PACKAGE WILL BE AVAILABLE ON THIS SITE APPROXIMATELY MARCH 14, 2014. The work consists of Forest wide road and/or snowmobile trail obliteration for both Divisions on the Lewis and Clark National Forest with Headquarters Office located in Great Falls, Montana. Work includes furnishing all labor, equipment, supervision, transportation, operating supplies, and all incidentals necessary to perform the work. All work and equipment shall be in compliance with the terms, specifications and provisions of this contract. All equipment shall be in good operating condition and shall be operated by competent, experienced operators. Requirements of the Use of Premises Clause, AGAR 452.236-70, all existing facilities such as signs, cattle guards, and drainage structures damaged by the Contractor shall be replaced or repaired by the Contractor at no additional cost to the Government. Pollution and Erosion Control. During all operations under this contract, the Contractor shall exercise reasonable measure to prevent or minimize soil erosion and pollution of water and other resources. All refuse, including camps, parking areas, and equipment maintenance areas shall be stored, collected, and disposed of in a sanitary and nuisance-free manner. Refuse shall be disposed of in State-approved landfills as approved by the Contracting Officer's Representative (COR). The contractor is responsible for location of all utilities prior to ground disturbance. Damaged utilities shall be repaired at the Contractor's expense. Contact "Call Before You Dig" at +1 (555) 000-0000 prior to any ground disturbance. The Government will obtain all necessary permits for live stream work and Contractor will be responsible to adhere to the specifications listed in the stream permits. Rock/Gravel/Boulder Transport and Placement. In some instances the Government desires the hauling and placement of Government furnished rip-rap type rock, gravel, and/or rock boulders. Haul units (dump trucks) will be tandem axle, 10-12 cubic yard end dump capacity for the transportation of this material. The rip-rap rock and gravel will be used for erosion control and hardening stream crossings. The boulders will be used primarily for blocking access to obliterated travel routes, or for stream gradient control, with the size being 2.5 feet in the smallest dimension. When ordered, the Government will designate the rock source on each Task Order. The work shall consist of loading and hauling the rock from the designated source to the project site, and placement at the project site(s). See Section G-Measurement and Payment Data for further information. Excavator Rental. The Excavator Rental Pay Item will be used when removing culverts from live streams and performing the associated stream restoration work. In addition, the Government may need the use of an excavator to perform work that is not defined in this contract but is considered within the scope of the contract. The rental Pay Item can also be used to obliterate additional miles of road or remove and load gates (other sturctures) if sufficient hours are left from the other work mentioned above. Excavator will be track type, have a minimum of 90 fly wheel horse power, and be equipped with a hydraulic thumb on the bucket (blade would be convient). When an excavator is working under this Pay Item a Government representative must be on site and Contractor is required to give the Government two working days notice before starting this work. Seeding, Dry Method. As ordered by the Contracting Officer from the Schedule of Items (Schedule B), all disturbed ground must be seeded with the following mix of certified weed free seed at the rate of pure live seed of 20 pounds per acre. Contractor must furnish written certification from the supplier that the seed mix is weed free.

More opportunities from Department Of Agriculture → Custer Gallatin National Forest

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS