Liberty Utilities / La Canada Irrigation District Interconnect Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Liberty Utilities and La Canada Irrigation District Interconnect Project involves the installation of a new 1,650-foot water pipeline and a pump station within the public right-of-way of Angeles Crest Highway in La Canada Flintridge, California. The primary objective is to connect the Liberty Utilities system with the La Canada Irrigation District system to establish an emergency backup water supply and improve overall system reliability. The scope of work includes excavating trenches up to seven feet deep and constructing a pump station at the intersection of Angeles Crest Highway and Starlight Crest Drive. This project is classified under NAICS code 237110 and has been granted a CEQA Categorical Exemption under Sections 15303 and 15304, as it consists of utility extensions that do not alter undisturbed land or remove scenic trees. Construction is scheduled to begin with site preparation on April 1, 2026, and continue through September 30, 2026, followed by paving in early October 2026. Final infrastructure and electrical equipment installation are slated for July 1 through August 11, 2027. The project requires specific encroachment permits from Caltrans and the Los Angeles County Municipal Code, as well as city site plan reviews for on-site structures. Additionally, the project necessitates easements from the La Canada Flintridge Country Club Golf Course and a private homeowners association for work along Arroyo Summit Drive. All work within the right-of-way must be restored to its original condition upon completion.

General Info

Liberty Utilities to install 1,650-foot water pipeline and pump station in La Cañada Flintridge for emergency interconnection, starting spring 2026.

Agency

California → La Canada Irrigation District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

SR-2 and Starlight Crest Drive, La Canada-Flintridge, CA, 91011

Set-Aside

NONE

Documents

(3)

Liberty Utilities La Cañada Irrigation District Interconnect Categorical Exemption Findings July 2025

PDFcategorical-exemption-findings

Resolution 2025-11 LCID-LU CEQA Categorical Exemption Adoption

PDFresolution

Notice of Exemption - Liberty Utilities/La Cañada Irrigation District Interconnect Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → La Canada Irrigation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → La Canada Irrigation District
Office AddressN/A
Contacts
Justin BaileyGeneral Manager

Full Description

Show more
Liberty Utilities proposes to install a new 1,650-foot water pipeline within the public right-of-way of Angeles Crest Highway (SR-2) in the City of La Cañada Flintridge. The pipeline would connect the existing Liberty Utilities system with the La Cañada Irrigation District system to provide and receive emergency water supply. The project involves excavating trenches up to seven feet deep, installing the pipeline, and constructing a pump station at Angeles Crest Highway and Starlight Crest Drive, which would require easements from the La Cañada Flintridge Country Club Golf Course and a private homeowners’ association. Construction activities would be managed through a construction management plan, with the right-of-way restored to its original condition upon completion. Construction is anticipated to begin in spring 2026 and last approximately six months, with final electrical equipment installation expected in summer 2027. The Project consists of installation of utility extensions and associated new equipment to connect existing facilities and would not change the permitted use of an existing facility. The Project would not require alterations to any undisturbed land or removal of scenic trees. Work completed in the right-of-way would be left in a safe condition, and upon completion, the right-of-way would be restored to at least its original condition.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 11 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 11 hours ago

DEADLINE

in about 21 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 11 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS