Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 27, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lick Run Streambank Restoration

Awarded
W911WN19B8010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
300 Burr St - Demolition of Commercial Building and Parking Lots
Solicitation # 2026-DEPARTMENT-052
The City of Jackson, through its Community Development agency, has issued solicitation 2026-DEPARTMENT-052 for the demolition of a commercial building and parking lots located at 300 Burr St. The scope of work includes the removal of structures and debris, asbestos abatement, and comprehensive site restoration, including grading and greening to blend with surrounding properties. The contract will be awarded to the lowest responsible contractor who meets all licensing requirements, specifically a demolition license for Residential Builders or Maintenance Alteration with an R-Home Wrecking classification. Bidders must submit their quotes via the e-Procurement Portal by October 27, 2026, including a completed pricing table, ethics disclosure form, and proof of licensing. Key contractual obligations include a one-year warranty on all materials and work, and a requirement to provide bonds, licenses, and environmental insurance within ten days of the award. Performance is subject to liquidated damages of 1,000 dollars per day for failure to meet the completion date, though extensions may be granted for winter weather provided a rough grade is installed by December 30 and final restoration is completed by May 1, 2027. The City maintains an opt-out clause allowing the removal of parcels from the award with limited reimbursement to the contractor. Compliance with Equal Employment Opportunity certifications and HUD Section 3 regulations for contracts exceeding 100,000 dollars is mandatory. Payment is processed bi-weekly upon approval by the Department of Neighborhood and Economic Operations, provided invoices contain detailed line items for grading, greening, demolition, and asbestos abatement.
Community Development

POSTED

about 9 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Pittsburgh District, requires streambank restoration at Lick Run in Jefferson Hills and South Park Township, Pennsylvania. The project aims to prevent imminent threats to the Pleasant Hills Authority Sewage Treatment Facility, where ongoing erosion and bank failures endanger aeration tanks, storage tanks, and influent pipelines. The proposed solution involves installing approximately 330 linear feet of riprap with geotextile fabric and 345 linear feet of precast concrete modular block wall, followed by re-vegetating the slopes with native grasses. This is a 100 percent small business set-aside under NAICS code 238910, awarded as a firm-fixed-price contract consisting of a base bid and two options. The estimated project cost ranges between 1 million and 5 million dollars, with a performance period of 490 calendar days following the notice to proceed. Interested contractors must be registered in the System for Award Management to be eligible for the award.

General Info

Contract Value

$1,341,411.2

NAICS

238910 - Site Preparation Contractors

Place of Performance

628 Cochrans Mill Road, Jefferson HIlls, PA, 15025, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline added: Sep 10, 2019. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
Contacts2 people available
OfficePITTSBURGH, PA, 15222-4198, USA
Office AddressPITTSBURGH, PA, 15222-4198, USA
Contacts
Connie L. FergusonContract Specialist
Michael D. PearsonContract Specialist

Full Description

Show more
Lick Run Streambank Restoration Synopsis The U.S. Army Corps of Engineers, Pittsburgh District has a requirement for the restoration of the streambank at Lick Run in Jefferson Hills, South Park Township, in Allegheny County, PA. The project area is located on the right descending bank of Lick Run within the corporate limits of South Park Township and Jefferson Hills Borough. The Pleasant Hills Authority Sewage Treatment Facility is located on the western side of Lick Run. Erosion has been occurring for a number of years along the streambank and is an imminent threat to the treatment facility's aeration tanks, influent pipeline, storage tanks and other infrastructure. The right descending bank of Lick Run is being eroded resulting in bottom scour, shallow bank failures, and streambank retreat. If corrective action is not implemented, erosion will damage critical plant facilities and cause plant closure. To address the issues associated with streambank erosion along the right descending bank of Lick Run, this project proposes to use a combination of approximately 330 linear feet of riprap and 345 linear feet of precast concrete modular block wall. The riprap is installed to ensure slope stability, likely between 3:1 (H:V) and 2:1 (H:V), and a geotextile fabric is to be placed between the riprap and existing ground to reduce soil loss and maintenance due to vegetation growth. Gravel or a geocomposite drainage material will be installed between the block wall and the existing ground. The slope above the wall will be re-vegetated with native grasses. The work shall be completed within 490 calendar days after written Notice to Proceed to include any exercised options. The Solicitation is broken into a Base Bid with two (2) Bid Options. Estimated cost of the proposed work is between $1,000,000.00 and $5,000,000.00. This acquisition will be a 100% set aside for Small Business. The resulting award will be for one (1) Firm-Fixed-Price (FFP) contract with two (2) Options. All responsible offerors are encouraged to participate. The Invitation for Bid (IFB) will be issued approximately 1 August 2019, online through Federal Business Opportunities (FBO.gov); therefore, requests for hardcopies of the solicitation will not be honored. In order to receive notification of any amendments to this solicitation, interested vendors must register as an interested vendor on the FBO.gov website. If you are not registered, the Government is not responsible with providing notification of any changes to this solicitation. Contractors MUST be registered in the System for Award Management (SAM) BEFORE SUBMITTING A BID ON THIS SOLICITATION (go to www.sam.gov to register). Please be aware that SAM now requires a Notarized Statement as part of their registration and renewal process. This process could take more than ten (10) days. The NAICS for this procurement is 238910, "Site Preparation Contractors" and the small business size standard is $15 Million. ATTENTION: For companies new to the Army Corps of Engineers, Pittsburgh District, the link below will take you to a training Powerpoint slide presentation which will provide information essential to new contractors to help them navigate our bidding process. It will also help them to make their bid-no bid decision as it contains information on what will be required on a Post-Award performance basis - submittals, timelines, deadlines & milestones, necessary paperwork you need to supply, etc. This will help you capture everything needed in your bid so that there are no surprises later on. This training is not mandatory to be considered qualified to bid; it is meant as a means to assist you in becoming better prepared to work with the Corps of Engineers, Pittsburgh District. You can access the training using the link below: http://www.lrp.usace.army.mil/Portals/72/docs/SmallBusiness/Solving%20the%20Mystery%20-Understanding%20USACE%20Pittsburgh%20Contracting%20Process.pptx You may give feedback on the training package to the District's small business specialist using the email address of LRP.SBO@usace.army.mil

More opportunities from Department Of Defense → W072 Endist Pittsburgh

Same awarding agency

NAICS: 238160
New
Federal
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
Solicitation # W911WN26QA062
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting quotes for the complete replacement of the standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio. This non-commercial construction project is a 100 percent Small Business Set-Aside under NAICS 238160, with an estimated value between $150,000.00 and $350,000.00. The scope of work includes the demolition and disposal of existing roof panels, box gutters, scuppers, and the lightning protection system, as well as the installation of a new gutter system and a certified, non-penetrating Lightning Protection System. Additional requirements include rerouting vent and exhaust pipes through the masonry side wall and refurbishing up to 95 linear feet of cold-formed metal sub-framing that exhibits significant corrosion or deformation. The project will be awarded as a single Firm-Fixed Price contract based on best value, evaluating both price and past performance. The performance period is 365 calendar days from the written Notice to Proceed, with work hours restricted to Monday through Friday, 7:00 AM to 4:00 PM. Contractors must adhere to strict quality and safety standards, including EM 385-1-1, UL 2218 Class 4 impact resistance, and Davis-Bacon Act wage determinations for Trumbull County, Ohio. Required submissions include a Quality Control Plan and documented credentials for key personnel. Performance and payment bonds totaling 100 percent of the contract price are required upon award.
Roofing Contractors

POSTED

4 days ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
Federal
JP Murtha Float Mooring Bitts Retrofit
Solicitation # W911WN27BA001
The United States Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price construction contract for the John P. Murtha Floating Mooring Bitts Retrofit. This project involves complex in-the-wet construction within an active navigation lock, requiring the design, fabrication, and installation of two dewatering boxes and the installation of Government-furnished floating mooring bitts into contractor-fabricated embedded frames on the river chamber middle wall. The scope includes heavy demolition, concrete wire-sawing, core drilling, and the use of certified commercial dive teams for underwater inspection and cofferdam sealing. The contractor must provide and operate a compliant floating plant, including a crane/deck barge and push boat, in accordance with EM 385-1-1. The work is to be completed within 730 calendar days after the notice to proceed. This is an unrestricted full and open solicitation under NAICS code 237990, with a small business size standard of 45 million dollars. Award will be granted to the lowest responsive and responsible offeror, with a 10 percent price evaluation preference provided to HUBZone certified firms. Bidders must maintain active registrations in the System for Award Management and the Procurement Integrated Enterprise Environment, as all responses must be submitted electronically via PIEE. The contract requires performance and payment bonds, adherence to the Davis-Bacon Act under wage determination PA20260002, and the execution of partnering sessions between the contractor and government personnel. Final acceptance is contingent upon a pre-final inspection and a formal final acceptance inspection to ensure the facility is returned to a condition equal to or better than its original state.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS