Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 8, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LiDAR Towing collision detection system for the F-16/F-35

Closed
FA488722P0042Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334513
New
Federal
F/A-18 Fuel Pressure Gage Kit, P/N: 3867AS2060-1
Solicitation # N68335-27-Q-1005
The Naval Air Warfare Center Aircraft Division is soliciting quotes for a Firm Fixed Price contract to manufacture and assemble seventy Fuel Pressure Gage Kits (Part Number 3867AS2060-1) in support of the F/A-18 E/F program. This procurement is a 100 percent Small Business Set-Aside under NAICS code 334513. Award will be granted to the responsible offeror based on the Lowest Price Technically Acceptable (LPTA) basis. To be considered technically acceptable, offerors must be registered as a small business in SAM, provide pricing for all CLINs, commit to a delivery schedule of 100 days after contract award, and maintain an acceptable or neutral past performance record in the Supplier Performance Risk System. Due to the inclusion of Controlled Unclassified Information and export-controlled data, strict cybersecurity and security protocols are in place. Offerors must possess a current DD Form 2345 and provide proof of CMMC Level 2 self-assessment certification to access the Technical Data Package via the DoD SAFE website. Additionally, technical acceptability requires a current NIST SP 800-171 assessment and CMMC Level 2 certification recorded in the Supplier Performance Risk System. All delivered equipment must be new, covered by a manufacturer warranty, and packaged and marked in accordance with ASTM D3951-18 and MIL-STD-129R standards. Proposals are due by October 22, 2026, at 4:00 pm EST.
Navair Warfare Ctr Aircraft Division

POSTED

1 day ago

DEADLINE

in 9 days

General Info

NAICS

334513 - Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

Place of Performance

Luke AFB, AZ, 85309, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4887 56 Cons Cc
Contacts2 people available
OfficeLUKE AFB, AZ, 85309-1217, USA
Office AddressLUKE AFB, AZ, 85309-1217, USA
Contacts

Full Description

Show more
The purpose of this notice is to synopsize the 56th Contracting Squadrons intent to orally solicit and award a sole-source contract to Evitado USA, LLC in the amount of $123,145.00 on or about 24 June 2022. The proposed contract action will be for a LiDAR sensor capable of being temporarily attached to an aircraft tug, identifying the size and shape of the aircraft being pulled based on the operators selection of the aircraft type and load out. The system will provide the operator with real-time feedback and data, and notify the operator via a tablet connected to the sensor if the aircraft is within 10 feet of striking an object such as a hanger or another aircraft. The contractor will also be setting up the system and providing onsite training at Luke AFB. This sole source will be conducted under the authority of FAR 6.302-1 Only one responsible source and no other supplies or services will satisfy agency requirements. Through market research conducted, we have found no other vendor with the technology or capability to fulfill this requirement, and we believe that this capability is wholly unique to Evitado USA, LLC. Below is the CLIN Structure for the proposed contract action: 0001 - Evitado Sensor System and User Interface Tablet Device, including accessories, and including 1-year warranty - 1 EA 0002 - Software Adaption for F-16C/D, and F-35, including implementation and testing - 1 EA 0003 - 1 PAX overnight domestic travel Luke AFB for software adaption, including implementation and testing - 1 EA 0004 - 1 PAX overnight domestic travel Luke AFB for general instruction and system application training - 1 EA 0005 - 1-day training for general instruction and system application at Luke AFB 0006 - Maintenance plan, first year 0007 - Maintenance plan, second year All items will be delivered to Luke AFB, AZ and all services will be performed at Luke AFB, AZ with an 8-12 week lead time. All responsible source may submit a capability statement, proposal, or quotation if they believe that there is an existing system capable of fulfilling Luke AFB's needs. Each submission will be evaluated to ascertain whether or not the submission will meet the capabilities listed above

More opportunities from Department Of Defense → FA4887 56 Cons Cc

Same awarding agency

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
This firm-fixed-price solicitation, number F3YCFA6173AC01, is a 100 percent Small Business set-aside under NAICS 335921 for the engineering, furnishing, installation, and testing of new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The project involves connecting Radar Approach Control to several critical facilities, including the Air Traffic Control Tower, Base Operations, Command Post, and various flightline and weather equipment such as Localizers, Glide Slopes, TACAN, and GATR, as well as meteorological stations. The installation will utilize a combination of existing manhole and handhole duct systems and direct burial. The contractor is responsible for providing all new, rust-proof, and corrosion-resistant materials, labor, and supervision, as no government-furnished equipment will be provided. The period of performance is not to exceed 180 calendar days, with a requested delivery date of July 1, 2027. Award will be granted to the responsible vendor with the lowest priced, technically acceptable quote, evaluated based on design, a quality control plan, and performance history via the Supplier Performance Risk System. Technical teams must be certified to EFI&T TC Comm FOTS, and supervisors must hold factory certification from equipment manufacturers. All work must comply with strict environmental guidelines regarding hazardous materials and lead-based paint, and personnel must adhere to Department of the Air Force security and base access protocols. Final acceptance is contingent upon successful OTDR and Optical Power Meter testing in accordance with TIA 526-7 and a final project walk-through.
Fiber Optic Cable Manufacturing

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS