This Solicitation opportunity from Colorado was posted on August 13, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
DOCX, High priority: read this firstbid-alternates-form
HighAI Summary for Appendix B2 - sbp-6.131 Bid Alternates Form for Project 2021-035M21: This document is Appendix B2, the Bid Alternates Form for the State of Colorado Department of Local Affairs project number 2021-035M21, titled Life Safety & Code Improvements for Buildings 4, 5, 6, 8, and 401. It outlines additive and deductive bid alternates that bidders can use to modify the base bid amount. Additive alternates increase the bid price if accepted, while deductive alternates decrease it. The form includes spaces for bidders to enter amounts for each alternate and requires the bidder's company name, signature, and date. This form is part of the bidding process and is critical for contract pricing adjustments.
DOCX
DOCX, High priority: read this firstbid-form
HighAI Summary for Appendix B3 - SBP-6.134 Multiple Project Bid-DOLA LS Projects: This document is Appendix B3, a State Buildings Program Multiple Project Bid Form attached to Bid Form SC6.13 for the Department of Local Affairs. It covers two projects: 2021-035M21 HB1408 Improve Life Safety and Code for Multiple Buildings, and 2024-110M23 Life Safety for Three Buildings. The bid will be awarded based on composite pricing for all listed projects. The form includes spaces for company name, signature, and date, and specifies the base bid per Bid Form SC6.13.
DOCX
DOCX, High priority: read this firstlabor-burden
HighAI Summary for Appendix C - SBP-6.18 Labor Burden Calculation for Colorado State Buildings Program: This document is Appendix C - SBP-6.18 Labor Burden Calculation for the Colorado State Buildings Program, related to projects 2021-035M21 and 2024-110M23 involving life safety and code improvements. It details the required labor burden calculation form that contractors and subcontractors must submit and agree upon prior to executing construction agreements. The form includes percentages of total labor burden such as taxes, pension costs, and insurance, which will be incorporated into the contract and used for future change order proposals. The state reserves the right to verify all information provided.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Appendix D1 - Bent County Prevailing Wage Rates CO20230001: This document is the prevailing wage determination for building construction projects in Bent County, Colorado, and surrounding counties, effective as of December 22, 2023. It supersedes the previous decision CO20220001 and includes wage rates and fringe benefits for various construction trades such as asbestos workers, bricklayers, carpenters, electricians, ironworkers, laborers, glaziers, cement masons, and plumbers. The document references compliance with the Davis-Bacon Act and Executive Orders 14026 and 13658 regarding minimum wage requirements. It also lists modification dates and provides detailed wage rates by county and trade classification.
XLSX
XLSX, High priority: read this firstwage-determination
HighAI Summary for Appendix D2 - Colorado Apprenticeship Contribution Rates 2024: This document is Appendix D2 detailing the Colorado Apprenticeship Contribution Rates effective January 2024. It lists various trades and their associated apprenticeship contribution rates, geographic regions, and union local numbers. The document includes descriptions of trades such as Boilermakers, Bricklayers, Carpet Layers, Glaziers, Painters, and Cement Masons, among others. It serves as a wage determination reference for apprenticeship contributions in Colorado construction and related industries.
XLSX
XLSX, High priority: read this firstwage-determination
HighAI Summary for Appendix D2 - Colorado Apprenticeship Contribution Rates 2024-January: This document is Appendix D2 containing Colorado Apprenticeship Contribution Rates effective January 2024. It lists various trades and their associated apprenticeship contribution rates by local unions in Colorado. The document includes detailed descriptions of trades such as Boilermakers, Bricklayers, Carpet Layers, Glaziers, Painters, and Cement Masons, along with geographic regions and specific apprenticeship rates. It serves as a wage determination reference for apprenticeship contributions in multiple construction and trade sectors within Colorado.
XLSX
XLSX, High priority: read this firstwage-determination
HighAI Summary for Appendix D2 - Colorado Apprenticeship Contribution Rates 2024-January: This document is Appendix D2 detailing the Colorado Apprenticeship Contribution Rates as of January 2024. It provides apprenticeship contribution rates for various trades and local unions within Colorado, including Boilermakers, Bricklayers, Carpet Layers, Glaziers, Painters, and Cement Masons. The document includes descriptions of the trades, geographic regions covered, and specific apprenticeship rates applicable to each trade. It serves as a wage determination reference for apprenticeship contributions in construction and related industries in Colorado.
DOCX
DOCX, High priority: read this firstcontract-document
HighAI Summary for Appendix F2 - SC6.23 General Conditions of Contractor's Design/Bid/Build Agreement R1-2024: This document is the General Conditions of the Contractor's Design/Bid/Build (D/B/B) Agreement for the State of Colorado, Office of the State Architect, State Buildings Program. It is identified as State Form SC-6.23, Revision 1, 2024. The document includes detailed articles covering definitions, execution, contractor responsibilities, insurance, bonds, labor and wages, changes in work, claims, completion, warranties, termination rights, and Colorado-specific provisions. It serves as a comprehensive contractual framework governing the design, bidding, and building phases under this agreement.
DOCX
DOCX, High priority: read this firstbid-bond
HighAI Summary for Bid Bond for Project 2021-035M21 and 2024-110M23 Life Safety Improvements: This document is a Bid Bond for the State of Colorado Department of Local Affairs projects 2021-035M21 and 2024-110M23 involving life safety and code improvements to multiple buildings. It serves as a proposal guaranty requiring the Principal to submit a bond amounting to at least 5% of the total bid price as liquidated damages if the Principal defaults. The bond ensures the Principal maintains the proposal for 30 days after bid opening and, if awarded, executes the required agreement and bonds. The document includes signature blocks for the Principal and Surety, and mandates a power of attorney accompanying the bond. It is a critical contract document dated for execution in 20XX.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB1-NHAA-2025000029 Fort Lyon Life Safety Upgrades Multiple Buildings: This Invitation for Bids (IFB) dated July 29, 2024, solicits bids for life safety and code upgrades at multiple buildings on the Fort Lyon Campus in Bent County, Colorado. The project includes two appropriations: HB1408 Improve Life Safety and Code for multiple buildings with an estimated cost of $1,025,000, and Life Safety upgrades for three buildings estimated at $420,000. The scope covers renovations such as accessible restrooms, stair modifications, emergency lighting, and fire safety systems. Bidders must meet minimum qualifications including recent general contracting experience, bonding capability, and compliance with state labor and apprenticeship laws. A mandatory pre-bid meeting is scheduled for August 1, 2024, with sealed bids due by August 14, 2024. The contract approval is projected for September 4, 2024, with construction anticipated to start September 23, 2024, and complete by May 31, 2025.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB1-NHAA-2025000029 Ft. Lyon Locksmith Shop Rebuild Information for Bidders: This document titled 'Information for Bidders' pertains to the IFB1-NHAA-2025000029 solicitation for the Ft. Lyon Locksmith Shop Rebuild project under the Colorado Department of Local Affairs. It provides detailed instructions for bidders including the use of a specific bid form, electronic bid submission via BidNet, requirements for bid security, applicable laws and regulations including apprenticeship and prevailing wage, and environmental product declaration requirements. The document also covers procedures for handling inconsistencies, addenda issuance, 'or equal' material approvals, and the method of award based on the lowest responsible bidder with consideration of deductible and additive alternates. The document is essential for bidders to understand submission requirements and compliance for this public construction project.
DOCX
DOCX, High priority: read this firstbid-form
HighAI Summary for SBP-6.13 Bid Form for Colorado Life Safety & Code Improvements Project: This document is the SBP-6.13 Bid Form for the State of Colorado's Department of Local Affairs projects 2021-035M21 and 2024-110M23 involving life safety and code improvements in multiple buildings. It includes bidder acknowledgments, bid amounts, time of completion, and compliance requirements such as Colorado labor usage, service-disabled veteran-owned small business status, and bid guarantees. The form requires bidders to confirm examination of documents and site, submit bid guarantees, and agree to contract execution terms. It also outlines conditions for alternates, wage rates submission, and the right to reject bids. The form must be signed by authorized representatives and includes instructions for projects with specific labor and wage requirements.
DOCX
DOCX, High priority: read this firstcontract-document
HighAI Summary for SC6.21 Design/Bid/Build Contractor's Agreement 2024: This document is the Contractor's Agreement for a Design/Bid/Build (D/B/B) project under the State of Colorado Office of the State Architect State Buildings Program, identified as State Form SC-6.21. It includes contract details such as project number 2021-035M21 and project name involving life safety and code improvements for multiple buildings. The agreement outlines the parties involved, effective date conditions, contract sum, performance of work, provisions of contract documents, time of completion, and includes exhibits like performance bonds, insurance certificates, and prevailing wage determinations. The document is intended to formalize the contractual relationship between the State and the contractor for construction services.
DOCX
DOCX, High priority: read this firstcontract-document
HighAI Summary for State of Colorado SC6.23 General Conditions of Contractor's Design/Bid/Build Agreement R1-2024: This document is the General Conditions of the Contractor's Design/Bid/Build (D/B/B) Agreement for the State of Colorado, Office of the State Architect, State Buildings Program. It is identified as State Form SC-6.23, Revision 1-2024. The document includes detailed articles covering definitions, execution, contract documents, contractor responsibilities, insurance, labor and wages, changes in work, claims, completion, warranties, termination rights, and Colorado-specific provisions. It serves as a comprehensive contract framework governing the design, bidding, and building phases under this agreement.
DOCX
DOCX, Low prioritycertification
LowAI Summary for Appendix E - SBP-2.1 Apprenticeship Utilization Certification: This document is the Apprenticeship Utilization Certification for public projects of $1 million or more under the State Buildings Program of Colorado. It certifies that all firms participating in the project apprenticeship programs are registered with the U.S. Department of Labor or recognized state apprenticeship councils and have a proven record of graduating apprentices. The certification applies to trades including Mechanical, Sheet Metal, Fire Suppression, Sprinkler Fitting, Plumbing, and Electrical. The General Contractor must provide supporting documentation and agrees to comply with verification and potential penalties for falsification. The document includes spaces for project details, subcontractor information, and signatures.
DOCX
DOCX, Low prioritycertification
LowAI Summary for Appendix E - SBP-2.1 Apprenticeship Utilization Certification: This document is the Apprenticeship Utilization Certification for public projects of $1 million or more under the State Buildings Program of Colorado. It certifies that the general contractor and subcontractors participate in registered apprenticeship programs with a proven record of graduating apprentices. The certification references Colorado statute § 24-92-115, C.R.S. (SB 19-196), and outlines requirements for documentation, public availability, and consequences for falsification. The document includes fields for project details, trades, subcontractors, and union certification, and requires the general contractor's signature.
DOCX
DOCX, Low prioritycertification
LowAI Summary for Appendix E - SBP-2.1 Apprenticeship Utilization Certification for Colorado State Buildings Program: This document is the Apprenticeship Utilization Certification for public projects of $1 million or more under the Colorado State Buildings Program. It certifies that the general contractor and subcontractors participate in registered apprenticeship programs with a proven record of graduating apprentices. The certification references Colorado statute § 24-92-115, C.R.S. (SB 19-196), and requires supporting documentation from the U.S. Department of Labor. The document includes spaces for listing trades, subcontractors, and union certifications, and outlines consequences for falsification of documentation.
PDF
PDF, Low priorityreport
LowAI Summary for Appendix G - Ft. Lyon Facility Wide Asbestos Inspection Report 11-23-09: This document is the Facility Wide Asbestos Inspection Report for the Colorado Department of Corrections Fort Lyon Correctional Facility, prepared by Gobbell Hays Partners, Inc. The report, dated September 29, 2006 and amended November 23, 2009, details the inspection and analysis of asbestos containing materials (ACMs) across the facility. It includes bulk sample collection and laboratory results, regulatory review, and recommendations for managing ACMs. The report also addresses asbestos contamination in soils due to historical demolition activities. It serves as a comprehensive assessment of asbestos presence and condition at the Fort Lyon Correctional Facility.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyColorado → DOLA - Division of Housing - Public Housing Agency