This Solicitation opportunity from Illinois was posted on June 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for 2025 Belfast City Park Concession Stand RFP: This document is a Request For Proposal (RFP) issued by the City of Belfast Parks and Recreation Department for the operation of the Belfast City Park Concession Stand for two summer seasons from May 1, 2025, through September 30, 2026. It includes details about the concession building's equipment, operational expectations, and submission instructions. The RFP requires interested businesses to submit a one-page proposal by March 25, 2025, and outlines policies regarding maintenance, licensing, insurance, and rent. The document also contains a fillable form for business information, proposed schedule, menu, and references, along with contact details for inquiries.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for 2025 Chemical Bids 3rd Quarter Specifications and Proposal Form: This document is the Request for Quotation (RFQ) for chemical supplies for the City of Alliance, Ohio, for the 3rd quarter of 2025. It includes detailed specifications for liquid caustic soda and peracetic acid (PAA) used in water and wastewater treatment plants, including delivery requirements and quantities. The proposal form is provided for bidders to submit unit prices for the period July 1, 2025, to September 30, 2025. The document outlines special conditions, delivery terms, payment terms, and bid submission instructions. It emphasizes firm pricing, compliance with specifications, and the City's tax-exempt status.
PDF
PDF, High priority: read this firstifb
HighAI Summary for 3rd Quarter 2025 Chemical Bid Legal Notice: This legal notice announces a sealed bid solicitation by the City of Alliance, Ohio, for furnishing materials including Caustic Soda and Liquid Peracetic Acid for various city departments for the period July 1, 2025, through September 30, 2025. Bids are due by 11:30 a.m. on May 30, 2025, with public opening at noon the same day. Specifications and proposal forms are available at the Office of the Director of Public Safety & Service or online. Bidders must use the provided form, include all interested parties' contact information, and submit a $500 performance bond if awarded. The Board of Control reserves the right to reject any or all bids and accept the lowest and best bid for the city.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No.1 - 2025 Street Maintenance Program, Hot Mix Overlay: This document is Addendum No. 1 for the City of Warrensburg, Missouri's 2025 Street Maintenance Program, Hot Mix Overlay. Dated April 4, 2025, it amends the original bid documents by changing the bid opening date from April 18, 2025, to April 25, 2025. Contractors are required to acknowledge receipt of this addendum in the bid form.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Davidson County Health Department Roof Replacement Summary of Work: This document is the Summary of the Work section for the Davidson County Health Retrofit Roof Renovations project located at 915 Greensboro Street, Lexington, NC. It outlines the scope of work including demolition, roof retrofitting with metal roofing, HVAC exhaust fan replacement, plumbing vent extensions, and site cleanup. The document references contract documents prepared by Ramsay Burgin Smith Architects, Inc., dated December 2024. It includes a project schedule with key dates such as prebid conference, bid submission, and final completion expected by September 2025. Liquidated damages for delays are specified, emphasizing the importance of timely completion. The document also details contractor responsibilities, coordination with subcontractors, and general construction work scope. Temporary facilities, permits, and tax responsibilities are noted. The summary highlights the critical nature of the work and the contractual obligations for project completion.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Davidson County Health Dept Roof Replacement ITB March 2025: This Invitation to Bid (ITB) issued by Davidson County Purchasing Department invites sealed proposals for retrofit metal roofing at the Health Department Building in Lexington, NC. Bids are due by 2:00 PM on March 5, 2025. The document outlines project scope, bid submission requirements including a 5% bid bond or certified check, performance and payment bonds, payment terms, minority participation goals, and E-Verify compliance. A pre-bid conference is scheduled for February 19, 2025. Plans and specifications are available from Ramsay Burgin Smith Architects starting February 3, 2025. The ITB emphasizes contractor licensing, bid security, and contract award conditions.
PDF
PDF, High priority: read this firstgeotechnical-report
HighAI Summary for G24.144_REV1 Geotechnical Engineering Services Report for Lift Station #3 Rolling Meadows: This Geotechnical Engineering Services Report, dated June 11, 2025, prepared by Rubino Engineering, Inc. for RJN Group, Inc., presents the results of field and laboratory testing for the proposed Lift Station #3 Engineering Design Project in Rolling Meadows, Illinois. The report includes subsurface conditions, drilling scope, soil classification, groundwater observations, and geotechnical recommendations for utility installation, backfill, trench box excavation, lateral earth pressures, and dewatering. It is based on ASTM procedures and includes appendices with test procedures, limitations, soil classification charts, and boring logs. The report supports design and construction phases with detailed geotechnical considerations.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Invitation to Bid - 2025 Street Maintenance Program, Hot Mix Overlay: This document is an Invitation to Bid issued by the City of Warrensburg, Missouri, for the 2025 Street Maintenance Program focusing on Hot Mix Overlay. It provides details on obtaining bid specifications and plans for a non-refundable fee of $20.00 from the Public Works Department. Sealed bids are to be submitted to the City Clerk by April 18, 2025, at 10:00 a.m. local time, with a public bid opening scheduled at City Hall. The document is signed by Mike Schrage, City Manager.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Lift Station 3 Rehabilitation Project Addendum 2 Revised Sheets: This document is Addendum 2 dated 6/13/2025 for the City of Rolling Meadows Lift Station #3 Rehabilitation Project. It includes revised sheets and an index of sheets covering general notes, site plans, mechanical and electrical improvements, and construction sequencing. The plans are prepared to standard engineering scales for construction starting April 2025. The addendum updates previous addenda and provides critical technical details for the project.
PDF
PDF, High priority: read this firstnotice-to-bidders
HighAI Summary for Notice to Bidders Lift Station 3 Rehabilitation Project: This Notice to Bidders for the City of Rolling Meadows Lift Station #3 Rehabilitation Project invites sealed bids to be submitted by 10:00 a.m. on June 18, 2025. The project includes demolition of the existing dry well, construction of a new wet well with pumps, valve vault, mechanical equipment, electrical cabinet, standby generator, control systems, storm sewer work, and site restoration. Substantial completion is required within 150 calendar days of Notice to Proceed, with final completion in 180 days. Bid documents are available digitally via QuestCDN for a $40 fee. Bids must be accompanied by a 5% bid security, and the awarded contractor must provide performance and payment bonds for 100% of the contract price. The City reserves rights to defer award, reject proposals, or re-advertise as needed.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Rolling Meadows Lift Station 3 Rehabilitation Project Addendum 2: Addendum No. 2 for the City of Rolling Meadows Lift Station #3 Rehabilitation Project, dated for bid opening June 18, 2025. This 37-page addendum includes revisions to specifications and plans related to the new gas service and meter installation, updated geotechnical survey report, and changes to special provisions and plan sheets. Key changes include contractor installation of gas service piping between the meter and generator, updated geotechnical findings requiring trench box support, and revised plan sheets reflecting these updates. Bidders must acknowledge receipt of this addendum with their bid submission.
PDF
PDF
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
9 updates
PhaseClosed
Posted
Solicitation
Notice updated
Response deadline changed from Apr 26, 2024 to Oct 20, 2024. The notice title changed. NAICS code changed from 561730 to 561320. The notice description changed.
Notice updated
Response deadline changed from Oct 20, 2024 to Nov 8, 2024. The notice title changed. NAICS code changed from 561320 to 236220. The notice description changed.
Notice updated
Response deadline changed from Nov 8, 2024 to Feb 14, 2025. The notice title changed. The notice description changed.
Notice updated
Response deadline changed from Feb 14, 2025 to Mar 5, 2025. The notice title changed. NAICS code changed from 236220 to 333924. The notice description changed.
Notice updated
Response deadline changed from Mar 5, 2025 to Mar 25, 2025. The notice title changed. NAICS code changed from 333924 to 722320. The notice description changed.
Notice updated
Response deadline changed from Mar 25, 2025 to Mar 26, 2025. The notice title changed. NAICS code changed from 722320 to 221310. The notice description changed.
Notice updated
Response deadline changed from Mar 26, 2025 to Apr 18, 2025. The notice title changed. NAICS code changed from 221310 to 561730. The notice description changed.
Notice updated
Response deadline changed from Apr 18, 2025 to May 30, 2025. The notice title changed. NAICS code removed. The notice description changed.
Notice updated
Response deadline changed from May 30, 2025 to Jun 19, 2025. The notice title changed.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.